Passthrough - DCDC - 12V (Remove and Replace)
Correction code
1601010102
FRT
1.14
NOTE: Unless
otherwise explicitly stated in the procedure, the above correction code and
FRT reflect all of the work required to perform this procedure, including
the linked procedures. Do
not stack correction codes unless explicitly told to do so.
NOTE: See Flat Rate Times to learn more about FRTs and how they are
created. To provide feedback on FRT values, email LaborTimeFeedback@tesla.com.
NOTE: See Personal Protection to make
sure wearing proper PPE when performing the below procedure.
Only
technicians who have been trained in High Voltage Awareness and
have completed all required certification courses (if applicable) are permitted to
perform this procedure. Proper personal protective equipment
(PPE) and insulating HV gloves with a minimum rating
of class 0 (1000V) must be worn at all times a high voltage
cable, busbar, or fitting is handled. Refer to Tech Note TN-15-92-003, High Voltage Awareness
Care Points
for additional safety
information.
Torque Specifications
Description | Torque Value | Recommended Tools | Reuse/Replace | Notes |
---|---|---|---|---|
Nut that attaches the DCDC ground busbar to HV battery |
![]() 9 Nm (6.6 lbs-ft) |
|
Replace | 1523698-00-A |
Bolts that attach the DCDC passthrough to ancillary bay |
![]() 10 Nm (7.4 lbs-ft) |
|
Reuse |
Remove
- Remove the pyrotechnic battery disconnect. See Pyro Disconnect - HV Battery (Remove and Replace).
-
Disconnect the Power Conversion System (PCS) LV connector from the PCS.
NoteLift the HVC up from the front side.NotePull upward to release the locking tab. Use a plastic trim tool to help lift the connector upward as needed.
-
Remove and discard the nut that attaches the DCDC ground busbar to HV battery.
TIpUse of the following tool(s) is recommended:
- 13 mm socket
- Ratchet/torque wrench
- 4 in extension
- Gently lift the DCDC ground busbar upwards.
-
Remove the bolts that attach the DCDC passthrough to ancillary bay.
TIpUse of the following tool(s) is recommended:
- Insulated Ratchet/torque wrench
- External Torx E10 5-Lobe
-
Remove the DCDC passthrough from the ancillary bay.
CAUTIONPay special attention to avoid metal damage to the cable insulation layer.
Install
- Position the DCDC passthrough to the ancillary bay for installation.
-
Install the bolts that attach the DCDC passthrough to ancillary bay.10 Nm (7.4 lbs-ft)TIpUse of the following tool(s) is recommended:
- Insulated Ratchet/torque wrench
- External Torx E10 5-Lobe
- Gently press down the DCDC ground busbar to HV battery.
-
Install a new nut that attaches the DCDC ground busbar to HV battery.9 Nm (6.6 lbs-ft)TIpUse of the following tool(s) is recommended:
- 13 mm socket
- Ratchet/torque wrench
- 4 in extension
-
Connect the PCS LV connector to the PCS.
NotePush the connector downward then push the locking tab downward to install the connector. Make sure the connector is fully seated.
- Install the pyrotechnic battery disconnect. See Pyro Disconnect - HV Battery (Remove and Replace).