2026-04-15
Release Cable - Charge Port (GB) (Remove and Replace)
Correction code 4401012102 FRT 0.60 NOTE: Unless otherwise explicitly stated in the procedure, the correction code and FRT listed above reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. NOTE: See Personal Protection to make sure you are wearing proper PPE when performing the procedure below. NOTE: See Ergonomic Precautions for safe and healthy working practices.
- 2026-01-07: Released new procedure.
Torque Specifications
| Description | Torque Value | Recommended Tools | Reuse/Replace | Notes |
|---|---|---|---|---|
| Screws (x2) securing actuator to charge port assembly |
![]() 3.3 Nm (2.4 lbs-ft) |
|
Reuse | Newer vehicle is equipped with T20 tamper proof. |
Remove
- Remove the charge port assembly See Charge Port (GB) (Remove and Replace).
- Remove HV insulating gloves.
-
Remove screws securing
actuator to charge port assembly.
TIpUse of the following tool(s) is recommended:
- SET, 1/2" CUT BIT. (78 PCS DOUBLE END MINI RATCHET)
- RATCHET, 1/4" DR, M12, BARE TOOL
- Class 0 Electrical Protective Gloves
- Torx T20 socket
-
Turn over 30 degrees to take
out the actuator from charge port assembly.
-
Remove DC latch stick o-ring
from charge port assembly.
NoteDiscard after removal.
-
Release the clip, then remove the release cable from the latch
actuator.
NoteNote the orientation of the arm during removal.
Install
-
Secure the clip and install the release cable onto the latch
actuator.
NoteWhen installing the arm, ensure its direction matches the orientation noted during removal.
-
Install new DC latch stick
o-ring (1099100-02-A) onto charge port assembly.
NoteDo not damage o-ring.
-
Position actuator onto
charge port assembly.
NoteGently push actuator, make sure there is no gap between actuator and charge port.
-
Install screws securing
actuator to charge port assembly.
3.3 Nm (2.4 lbs-ft)TIpUse of the following tool(s) is recommended:- SET, 1/2" CUT BIT. (78 PCS DOUBLE END MINI RATCHET)
- RATCHET, 1/4" DR, M12, BARE TOOL
- Class 0 Electrical Protective Gloves
- Torx T20 socket
- Put on HV insulating gloves and leather over gloves.
- Install the charge port assembly See Charge Port (GB) (Remove and Replace).