2026-03-24
Liftgate Handle (Model Y Standard) (Remove and Replace)
Correction code
1120010112
FRT
0.18
NOTE: Unless otherwise explicitly stated in the procedure, the correction code and FRT listed above reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so.
NOTE: See Flat Rate Times to learn more about FRTs and how they are created.
NOTE: See Personal Protection to make sure you
are wearing proper PPE when performing the procedure below.
NOTE: See Ergonomic Precautions for safe and healthy working practices.
- 2026-03-23: Added new procedure.
Torque Specifications
| Description | Torque Value | Recommended Tools | Reuse/Replace | Notes |
|---|---|---|---|---|
| Bolts (x4) that attach the liftgate applique carrier to the liftgate |
![]() 4 Nm (2.9 lbs-ft) |
|
Reuse |
Remove
- Remove the liftgate applique. See Applique - Liftgate (Model Y Standard) (Remove and Install).
-
Apply tape to the liftgate under the liftgate applique carrier.
-
Loosen the bolts (x4) that
attach the liftgate applique carrier to the liftgate.
NoteDo not release the clips. Leave the liftgate applique carrier attached to the liftgate.TIpUse of the following tool(s) is recommended:
- 10 mm socket
- Ratchet/torque wrench
-
Disconnect the electrical
connector from the liftgate handle, and then loosen the tabs (x2) to remove
the handle from the liftgate applique carrier.
Install
-
Connect the electrical connector to the liftgate handle, and then position
the handle onto the liftgate applique carrier.
-
Fasten the bolts (x4) that
attach the liftgate applique carrier to the liftgate.
4 Nm (2.9 lbs-ft)TIpUse of the following tool(s) is recommended:- 10 mm socket
- Ratchet/torque wrench
- Remove the tape from the liftgate.
- Install the liftgate applique. See Applique - Liftgate (Model Y Standard) (Remove and Install).