Trim - Cantrail - Roof Rail - LH (Rework)
Correction code
10100504407,
10100504507
0.20
NOTE: Unless
otherwise explicitly stated in the procedure, the correction code and its
associated FRT reflect all of the work required to perform this procedure,
including the linked procedures. Do not stack correction
codes unless explicitly told to do so.
NOTE: See Flat Rate Times to
learn more about FRTs and how they are created.
NOTE: See Personal Protection to make
sure you are wearing proper PPE when performing the procedure below.
NOTE: See Ergonomic Precautions for safe and healthy
working practices.
- 2026-04-08: Released new procedure.
Procedure
-
Use an 8mm drill bit to enlarge the LH
roof rail cantrail trim front mounting hole.
CAUTIONMake sure the drill bit does not go more than 1 inch into the panel.NoteVerify the size with taper step gauge.
-
Clean the reworked LH roof rail
cantrail trim mounting hole.
NoteRemove any burrs caused by drilling, and then wipe the inside and outside with IPA to clean surface of contaminate. Allow 1 minute to dry.
-
Apply masking tape around the reworked
LH roof rail cantrail trim mounting hole.
NoteMake sure to cover any stainless steel and glass surfaces to prevent paint overspray.
-
Apply SEM ez coat to the LH roof rail
cantrail trim rework location.
NoteShake the can for 1 minute before application.NoteApply 2 coats of SEM ez coat. Allow ez coat to dry for 5-10 minutes between coats.NoteAllow 30 minutes of dry time after the second coat.
- Remove the masking tape.