2026-08-09
AC Junction Box (Standard) (Remove and Replace)
Correction code
NEW
NOTE: Unless otherwise explicitly stated in the procedure, the correction code and FRT listed above reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so.
NOTE: See Flat Rate Times to learn more about FRTs and how they are created.
NOTE: See Personal Protection to make sure you
are wearing proper PPE when performing the procedure below.
NOTE: See Ergonomic Precautions for safe and healthy working practices.
Warning
This procedure is a DRAFT.
Although it has been validated, Warnings and Cautions might be missing. Follow safety
requirements and use extreme caution when working on or near High Voltage systems and
components.
Warning
Cybertruck electronics are powered by a
48V "mid voltage" or "MV" architecture that is designed to improve efficiency. Servicing
MV components requires extra knowledge and care in order to avoid personal and/or
vehicular harm. Read and understand MV precautions in Electrical Precautions and make sure any required
MV-related training courses have been completed, as applicable.
Warning
Only
technicians who have been trained in High Voltage Awareness and
have completed all required certification courses (if applicable) are permitted to
perform this procedure. Proper personal protective equipment
(PPE) and insulating HV gloves with a minimum rating
of class 0 (1000V) must be worn at all times a high voltage
cable, busbar, or fitting is handled. Refer to Tech Note TN-15-92-003,
High Voltage Awareness Care Pointsfor additional glove and safety information.
- 2026-04-27: Released new procedure.
- Raise and support the vehicle. See Raise Vehicle - 2 Post Lift.
- Open the LH front door and lower the LH front window.
- Connect a laptop with toolbox 3 to the vehicle. See Toolbox 3 (Connect and Disconnect).
- Place the vehicle into Service Mode. See Service Mode.
- Unlock the vehicle Gateway. See Gateway (Unlock).
- Run ODIN routine PROC_HVBATT_X_DEVICE-CLUSTER-REPLACEMENT-BACKUPvia Service Mode Plus:High Voltage Battery ➜ Device Cluster Assembly (DCA) Replacement ➜ Backup Old DCAvia Toolbox:(link)
- Remove the tonneau slats. See Slat System - Tonneau (Remove and Install).
- Disconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
- Perform vehicle HV disablement procedure. See Vehicle HV Disablement Procedure (without Terrestrial Armor) (Test/Adjust).
-
Remove pyro fuse access cover
Note4x bolts, E-Torx 5 lobe, 10 Nm
-
Remove primary pyro fuse
Note2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
-
Remove secondary pyro fuse
Note2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
-
Release connectors at 2x4 header (AC
compressor and Inductive Charger headers)
Note2x connectors, Fully release red lock tab, Pull black latch down to release connector
-
Release 2x4 header assembly
Note4x bolts, 5-lobe 10mm, 6 Nm
-
Release drive unit connectors from
ancillary headers
Note3x connectors, Release blue lock tab, Rotate black latch
-
Remove bolts securing HC-Stak HV Headers
for LHRDU, FDU, RHRDU from ancillary flange
Note6x bolts, 5-lobe 10mm, 10 Nm
-
Remove LHRDU, FDU, RHRDU headers from
ancillary flange
Note3x headers, No tools required, inspect header seals, Replace header if damaged
-
Lower vehicle until tires are touching
the ground
NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
- Remove the bed floor assembly. See Bed Floor Assembly (Long Range) (Remove and Install).
- Remove the NVH barrier. See Tonneau NVH Barrier Assembly (Remove and Install).
-
Disconnect ancillary bay MV
connector
Note1x connector, Double locking, Release tab then pivot lever, Release second tab to disengage connector, Wait 1 second between locking tab release to discharge and prevent arcing
-
Remove bolt securing busbar HV connector
lid
Note1x bolt, EP10, 9 Nm
-
Remove bolts securing HV connector to DC
FC header
Note2x bolts, 10mm, 9 Nm
-
Release HV connector from DC FC
header
Note1x connector, Use inflatable airbag if needed to suspend busbar assembly above ancillary assembly
-
Support HV Busbar assembly
Note1X Bungee, Suspend assembly to maintain clearance, wrap bungee around busbar assembly to achieve required cord length, Connect bungee to tie down hook on bed side
-
Remove fast charger header doubler
Note2x bolts, E10 5 Lobe Torx, 10 Nm
-
Remove mid voltage header bolts
Note2x bolts, EP10, 6 Nm
-
Release fasteners securing ancillary bay
cover to HV battery
Note22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
-
Remove ancillary bay cover
NoteInstall vacuum cup to ancillary bay cover surface, Lift and maneuver cover around busbar and tonneau cage to remove
-
Inspect ACJB to PCS Harness
NoteInspect harness part number, If REV is earlier than J then replace with REV J or later, If REV is J or later then proceed with current procedure
-
Remove ACJB to PCS HV jumper
harness
Note2x connectors, Release locking tab and pull connector out of respective header, Do not pull on harness
-
Release ACJB LV connector & ACJB to
device cluster HV connector
Note2x connectors, Release connector locks, Depress levers and pull at connectors, Do not pull at harness, inspect ACJB to DC HV harness part number, if not rev J or newer, replace harness
-
Release ancillary bed outlet and dummy
plug connectors
Note1x connector,1x dummy plug Release locking tabs, Slide locks to release
-
Release ACJB fasteners
Note6x bolts, E10 5 Lobe Torx, 6Nm
-
Release ACJB from ancillary tray
Note2x clips, 2x datums, Release clips at headers, Slide ACJB inboard on datums
-
Remove ACJB from ancillary tray
NoteLift over and out of PCS once headers clear outboard side of ancillary tray
-
Install ACJB onto ancillary tray
NoteAlign headers and slide openings to datums in ancillary tray
-
Slide ACJB into ancillary tray until
header clips are fully engaged
NoteEnsure all fastener holes are aligned
-
Secure ACJB fasteners
Note6x bolts, E10 5 Lobe Torx, 6Nm
-
Secure ancillary bed outlet connector
and dummy plug to ancillary
Note1x connector,1x dummy plug, Slide locks to fully engage, Secure locking tabs
-
Install ACJB to PCS HV jumper
harness
Note2x connectors, Secure at ACJB first then fold harness over to PCS, Secure locking tab on both connectors
-
Secure ACJB LV harness connector &
ACJB HV harness to device cluster connector
Note2x connectors, Secure connector locks
-
Install ancillary cover
NoteUse suction cup and maneuver around busbar and tonneau cage
-
Secure ancillary cover fasteners to HV
battery
Note22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
-
Install mid voltage header bolts
Note2x bolts, EP10, 6 Nm
-
Install fast charger header
doubler
Note2x bolts, E10 5 Lobe Torx, 10Nm
-
Clean HV connector contact surface of
residual Penetrox
NoteAllow 1 minute dry time after removing Penetrox, New busbar comes with Penetrox applied to HV connector
-
Clean busbar HV connector contact
surface of residual Penetrox
NoteAllow 1 minute dry time after removing Penetrox, It is necessary to clean HV connector during re-use of busbar
-
Apply Penetrox onto HV connector
joints
NoteApply 2 drops of Penetrox A-13 about 5mm in diameter to either side of the hole on both leads, Spread evenly to verify the contact surface is fully covered
-
Position busbar connector and lower onto
HV header
NoteRelease bungee cord
-
Install bolts securing charge port
busbar kit to HV Header
Note2x bolts, 10mm, 9 Nm
-
Perform Hioki resistance test at each HV
joint from HV busbar lead to bolt head
Note2x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
-
Install bolt securing busbar HV
connector lid
Note1x bolt, EP10, 9 Nm
- Remove leather over gloves and HV insulating gloves
-
Connect ancillary bay MV connector
Note1x connector, double locking, Rotate lever into 2nd lock, Perform a pull test to ensure connector engaged correctly
-
Raise vehicle fully and lower lift onto
locks
NoteSet vehicle to comfortable working height, Ensure an audible click of locks on both sides is heard before lowering, Vehicle may tilt to the side if both locks are not engaged
-
Inspect HV insulating gloves
NoteCheck gloves for damage prior to use, Refer to service document TN-15-92-003, for information on inspecting HV gloves.
-
Put on HV insulating gloves and leather
over gloves
-
Install LHRDU, FDU, RHRDU headers to
ancillary flange
Note3x headers, No tools required, inspect header seals, Replace header if damaged
-
Secure bolts to HC-Stak HV Headers for
LHRDU, FDU, RHRDU to ancillary flange
Note6x bolts, 5-lobe 10mm, 10 Nm
-
Secure 2x4 header assembly
Note4x bolts, 5-lobe 10mm, 6 Nm, Confirm alignment of assembly with fastener openings
-
Secure connectors at 2x4 header (AC
compressor and Inductive Charger headers)
Note2x connectors, Fully engage red lock tab
-
Secure drive unit connectors to
ancillary headers
Note3x connectors, Rotate black latch, Ensure blue locking tab is fully engaged
-
Install secondary pyro fuse
Note2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts, Bolts may be reused
-
Install primary pyro fuse
Note2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts, Bolts may be reused
-
Perform Hioki resistance test at each HV
joint from HV busbar lead to pyro fuse busbar
Note4x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
-
Install pyro fuse access cover with
airlines attached
Note4x bolts, E-Torx 5 lobe, 10 Nm, Ensure seal is fully seated and undamaged, Secure 2 airline mounting clips to HV Battery, If HV pack is being shipped then pyro fuses must be removed
- Remove leather over gloves and HV insulating gloves
- Install the rear skid plate. See Skid Plate - Rear (Remove and Install).
-
Lower vehicle until tires are touching
the ground
NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
- Reconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
- Install the rear underhood apron. See Underhood Apron - Rear (Remove and Install).
- Install the NVH barrier. See Tonneau NVH Barrier Assembly (Remove and Install).
- Install the bed floor assembly. See Bed Floor Assembly (Long Range) (Remove and Install).
- Install the tonneau slats. See Slat System - Tonneau (Remove and Install).
- Exit Service Mode. See Service Mode.
- Raise the LH front window and close the LH front door.
- Remove the vehicle from the lift. See Raise Vehicle - 2 Post Lift.