2026-09-29

HV Isolation Diagnostics (Standard) (Test)

Correction code 44000134 NOTE: Unless otherwise explicitly stated in the procedure, the correction code and its associated FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. NOTE: See Personal Protection to make sure you are wearing proper PPE when performing the procedure below. NOTE: See Ergonomic Precautions for safe and healthy working practices.

Warning
This procedure is a DRAFT. Although it has been validated, Warnings and Cautions might be missing. Follow safety requirements and use extreme caution when working on or near High Voltage systems and components.
Warning
Cybertruck electronics are powered by a 48V "mid voltage" or "MV" architecture that is designed to improve efficiency. Servicing MV components requires extra knowledge and care in order to avoid personal and/or vehicular harm. Read and understand MV precautions in Electrical Precautions and make sure any required MV-related training courses have been completed, as applicable.
Warning
Only technicians who have been trained in High Voltage Awareness and have completed all required certification courses (if applicable) are permitted to perform this procedure. Proper personal protective equipment (PPE) and insulating HV gloves with a minimum rating of class 0 (1000V) must be worn at all times a high voltage cable, busbar, or fitting is handled. Refer to Tech Note TN-15-92-003, High Voltage Awareness Care Points for additional glove and safety information.
  • 2026-05-15: Released new procedure.
  1. Open the LH front door and lower the LH front window.
  2. Raise and support the vehicle. See Raise Vehicle - 2 Post Lift.
  3. Connect a laptop with Toolbox to the vehicle. See Toolbox 3 (Connect and Disconnect).
  4. Navigate to interactive HV isolation issues diagnosis
    Note
    Vehicle hub>High voltage>Diagnose HV isolation issues
  5. Select "Start interactive procedure"
  6. Read "HV System Global Check Autodiag" question and select "Yes" to continue
  7. Read "HV Awareness" warning and select "Yes" to continue
  8. Select the appropriate vehicle platform type and then select "Start interactive procedure"
  9. Open the powered frunk.
  10. Open the tailgate.
  11. Power down vehicle via UI
    Note
    Verify EPBs are engaged, Select charge port icon to ensure drive state is disengaged then power down vehicle via Controls > Safety > Power Off
  12. Remove the rear underhood apron. See Underhood Apron - Rear (Remove and Install).
  13. Secure MV battery maintainer and support vehicle
    Note
    1x cover, Secure MV maintainer but leave the Li-ion battery connected, Secure positive terminal to jump post, Secure negative terminal to bolt located between brake fluid reservoir and front trunk, Connect maintainer to power supply, DO NOT allow positive cable to make contact with other metal components, Prevent shorting the cables,Do not have a MV maintainer and the Li-ion battery simultaneously connected for any extended period of time
  14. Verify operation of multimeter
    Note
    Set multimeter to DC voltage, Confirm multimeter is properly measuring voltage by testing MV battery, Touch lightly and do not damage terminals
  15. Once the vehicle is in service mode plus and a MV battery maintainer is connected click next
  16. Run the DCA and DI backup routines via Service mode plus UI then select next
    Note
    Service mode Plus > High voltage > Procedures
  17. Confirm vehicle is actively faulting
    Note
    Service mode plus > High voltage > Hv battery > Clear blocked contactors
  18. Observe UI for active HV battery low isolation alerts
    Note
    Wait up to 5 minutes while observing for active HV battery low isolation alerts then select "Low isolation alert present" if low isolation alerts are present
  19. Disconnect Toolbox and remove the laptop from the vehicle. See Toolbox 3 (Connect and Disconnect).
  20. Disconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  21. Remove MV battery maintainer
    Note
    1x cover, Unplug the maintainer first, then remove positive and negative leads from jump posts, Re-secure any jump post covers
  22. Raise vehicle fully
    Note
    Set to a comfortable working height, Lower to locks, Ensure locks engage on both sides to prevent tilting
  23. Remove Mid-aero shield
    Note
    Rotate down as far as the battery armor will allow to clear the rear lower control arms, Pull Mid-aero shield out from between battery armor and rear venting bracket, Be careful not to engage any of the breathers during removal
  24. Remove all items from pockets and ensure not wearing metal items
    Note
    This includes phones, badges, metal belt buckles airpods and headphones
  25. Inspect HV insulating gloves
    Note
    Check gloves for damage prior to use, Refer to service document TN-15-92-003, for information on inspecting HV gloves.
  26. Put on HV insulating gloves and leather over gloves
    Note
    Use HV cut resistant insulated gloves or HV insulating gloves and leather over gloves, HV Insulating gloves must be worn any time a Hioki Tester or Hi-Pot Tester is used, Refer to service document TN-15-92-003 R5 for PPE requirements depending on vehicle configuration
  27. Remove clips securing AC compressor HV harness
    Note
    3x clips
  28. Verify no HV - Install amp clamp to RDU HV harness
    Note
    Verify meter is zeroed out before performing measurement, Measure single cable. Verify ammeter is installed in correct direction. If current > 0.5A do not proceed with disconnecting HV connector. In this case, start vehicle electrical isolation again to make sure that all was properly shut down. Escalate for assistance as requiredIf current < 0.5A, Ok to disconnect and check voltage at HV plug on the battery side.Release locking tab and rotate the release lever up to disengage the connector, Release harness clip, Do not force the release lever up, Ensure the alignment tabs on the RDU header are not damagedMake sure to wear PPE (HV gloves, safety glasses) when working on high voltage component, Measure B+ to Ground, B- to Ground, B+ to B-, If voltage is greater than 10V, Pack contactors are not open or welded, Stop work and reach out to Service Engineering
  29. Select next once vehicle HV disablement procedure is completed
  30. Select rear drive unit configuration
    Note
    Select "single rear drive unit"
  31. Disconnect RDU HV harness
    Note
    1x connector, Release locking tab and rotate release lever up, Do not force release lever up, Ensure alignment tabs on header are not damaged
  32. Perform isolation test on LH RDU HV cable at HV battery
    Note
    Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to subframe bolt, Position leads then press test button, Amber light will turn on, Test both terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  33. Enter the lowest stable isolation resistance value recorded in MOhm and then click "next"
  34. Read "Heat Pump A/C Compressor + HV Harness' Isolation Tests" panel and select "Finish Later" to prevent timeout error
  35. Release A/C compressor HV harness from HV battery
    Note
    1x locking connector, 4x clips, Pull down red locking tab and disengage the release lever, Do not force the release lever up, Number of connections may vary by vehicle configuration
  36. Perform isolation test on ancillary HV harness at rear of HV battery
    Note
    Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to subframe bolt, Position leads then press test button, Amber light will turn on, Test all four terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  37. Enter the lowest stable isolation resistance value recorded in MOhm
    Note
    Select "next" to continue
  38. Read CP HV Harness FC contactor question and select "Yes" to continue
  39. Read "CP HV Harness Isolation Test" panel and select "Finish Later" to prevent timeout error
  40. Lower vehicle until tires are touching the ground
    Note
    Raise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
  41. Remove the bed floor. See Bed Floor Assembly (Remove and Install).
  42. Remove bolt securing busbar HV connector lid
    Note
    1x bolt, EP10, 9 Nm
  43. Remove bolts securing HV connector to DC FC header
    Note
    2x bolts, 10mm, 9 Nm
  44. Release HV connector from DC FC header
    Note
    1x connector, Use inflatable airbag if needed to suspend busbar assembly above ancillary assembly
  45. Secure CP busbar connector aside
    Note
    Move connector away from header, Install bags or bungees as needed, Do not open tonneau to prevent damage
  46. Perform isolation test on CP HV busbar connector
    Note
    Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to door striker, Position leads then press test button, Amber light will turn on, Test both terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  47. Select "Resume" to continue to "CP HV Harness Isolation Test" panel
    Note
    Read panel and submit resistance to continue
  48. Read Ancillary certification question and select "Yes" to continue
  49. Read "PCS2 DC Isolation Test" panel and select "Finish Later" to prevent timeout error
  50. Connect HV harness connector to AC compressor
  51. Install the frunk assembly. See Frunk Assembly (Remove and Install).
  52. Reconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  53. Disconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  54. Raise vehicle fully
    Note
    Set to a comfortable working height, Lower to locks, Ensure locks engage on both sides to prevent tilting
  55. Verify no HV - Install amp clamp to RDU HV harness
    Note
    Verify meter is zeroed out before performing measurement, Measure single cable. Verify ammeter is installed in correct direction. If current > 0.5A do not proceed with disconnecting HV connector. In this case, start vehicle electrical isolation again to make sure that all was properly shut down. Escalate for assistance as requiredIf current < 0.5A, Ok to disconnect and check voltage at HV plug on the battery side.Release locking tab and rotate the release lever up to disengage the connector, Release harness clip, Do not force the release lever up, Ensure the alignment tabs on the RDU header are not damagedMake sure to wear PPE (HV gloves, safety glasses) when working on high voltage component, Measure B+ to Ground, B- to Ground, B+ to B-, If voltage is greater than 10V, Pack contactors are not open or welded, Stop work and reach out to Service Engineering
  56. Remove pyro fuse access cover
    Note
    4x bolts, E-Torx 5 lobe, 10 Nm
  57. Remove primary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
  58. Remove secondary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
  59. Lower vehicle until tires are touching the ground
    Note
    Raise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
  60. Clean all debris from ancillary cover
    Note
    During removal of ancillary cover any debris on top of the cover may be deposited into the ancillary bay
  61. Disconnect ancillary bay MV connector
    Note
    1x connector, Double locking, Release tab then pivot lever, Release second tab to disengage connector, Wait 1 second between locking tab release to discharge and prevent arcing
  62. Support HV Busbar assembly
    Note
    1X Bungee, Suspend assembly to maintain clearance, wrap bungee around busbar assembly to achieve required cord length, Connect bungee to tie down hook on bed side
  63. Remove fast charger header doubler
    Note
    2x bolts, E10 5 Lobe Torx, 10 Nm
  64. Remove mid voltage header bolts
    Note
    2x bolts, EP10, 6 Nm
  65. Release fasteners securing ancillary cover to HV battery
    Note
    22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
  66. Remove ancillary cover
    Note
    Install vacuum cup to ancillary cover surface, Lift and maneuver cover around busbar and tonneau cage to remove
  67. Disconnect device cluster HV DC harness from PCS
    Note
    1x connector, Release locking tab, Gently pull up
  68. Perform isolation test on PCS2 DC connector at ancillary
    Note
    Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to HV battery chassis bolt, Position leads then press test button, Amber light will turn on, Test both terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  69. Enter the lowest stable isolation resistance value recorded in MOhm
    Note
    Select "next " to continue
  70. Read "ACJB Isolation Test" panel and select "Finish Later" to prevent timeout error
  71. Release ancillary bay MV connector header
    Note
    4x tabs, Move aside as needed
  72. Disconnect HVC logic connector
    Note
    1x connector
  73. Disconnect negative pack contactor sense connectors
    Note
    2x connectors
  74. Disconnect positive pack contactor sense connectors
    Note
    2x connectors
  75. Disconnect ACJB HV connector
    Note
    1x connector, Release locking tab, Gently pull up
  76. Perform isolation test on ACJB HV connector
    Note
    Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to HV battery chassis bolt, Position leads then press test button, Amber light will turn on, Test both terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  77. Select "Resume" to continue to "ACJB Isolation Test" panel
    Note
    Read panel and submit resistance to continue
  78. Read "External Side DC Link Isolation Test" panel and select "Finish Later" to prevent timeout error
  79. Perform isolation test on external side of negative and positive pack contactors
    Note
    Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to HV battery chassis bolt, Position leads then press test button, Amber light will turn on, Test both terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  80. Select "Resume" to continue to "External Side DC Link Isolation Test" panel
    Note
    Read panel and submit resistance to continue
  81. Read "Internal Side DC Link Isolation Test" panel and select "Finish Later" to prevent timeout error
  82. Perform isolation test on internal side of negative and positive pack contactors and pyro disconnect
    Note
    Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to HV battery chassis bolt, Position leads then press test button, Amber light will turn on, Test all four terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  83. Select "Resume" to continue to "Internal Side DC Link Isolation Test" panel
    Note
    Read panel and submit resistance to continue
  84. Read "Warm Heat Pump A/C Compressor Isolation Test" panel and select "Finish Later" to prevent timeout error
  85. Connect ACJB HV connector
    Note
    1x connector, Secure locking tab
  86. Connect positive pack contactor sense connectors
    Note
    2x connectors
  87. Connect negative pack contactor sense connectors
    Note
    2x connectors
  88. Connect HVC logic connector
    Note
    1x connector
  89. Secure ancillary bay MV connector header
    Note
    4x tabs
  90. Connect device cluster HV DC harness to PCS
    Note
    1x connector, Secure locking tab
  91. Install ancillary cover
    Note
    Use suction cup and maneuver around busbar and tonneau cage
  92. Secure ancillary cover fasteners to HV battery
    Note
    22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
  93. Install mid voltage header bolts
    Note
    2x bolts, EP10, 6 Nm
  94. Install fast charger header doubler
    Note
    2x bolts, E10 5 Lobe Torx, 10Nm
  95. Clean HV connector contact surface of residual Penetrox
    Note
    Allow 1 minute dry time after removing Penetrox, New busbar comes with Penetrox applied to HV connector
  96. Clean busbar HV connector contact surface of residual Penetrox
    Note
    Allow 1 minute dry time after removing Penetrox, It is necessary to clean HV connector during re-use of busbar
  97. Apply Penetrox onto HV connector joints
    Note
    Apply 2 drops of Penetrox A-13 about 5mm in diameter to either side of the hole on both leads, Spread evenly to verify the contact surface is fully covered
  98. Position busbar connector and lower onto HV header
    Note
    Release bungee cord
  99. Install bolts securing charge port busbar kit to HV Header
    Note
    2x bolts, 10mm, 9 Nm
  100. Perform Hioki resistance test at each HV joint from HV busbar lead to bolt head
    Note
    2x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
  101. Install bolt securing busbar HV connector lid
    Note
    1x bolt, EP10, 9 Nm
  102. Connect ancillary bay MV connector
    Note
    1x connector, double locking, Rotate lever into 2nd lock, Perform a pull test to ensure connector engaged correctly
  103. Raise vehicle fully
    Note
    Set to a comfortable working height, Lower to locks, Ensure locks engage on both sides to prevent tilting
  104. Clean pyro fuse mating surfaces
    Note
    Using an insulated tool wipe all four busbar mating surfaces within pyro fuse bay, Wipe top and bottom mating surfaces of each pyro fuse, Ensure no debris is present on any mating surface, Process shown with device cluster removed for clarity and safety, HV gloves and associated PPE must be worn at all times when cleaning mating surfaces, Allow 1 minute for IPA to dry
  105. Install secondary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts, Bolts may be reused
  106. Install primary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts, Bolts may be reused
  107. Perform Hioki resistance test at each HV joint from HV busbar lead to pyro fuse busbar
    Note
    4x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
  108. Remove HV insulating gloves
  109. Install pyro fuse access cover with airlines attached
    Note
    4x bolts, E-Torx 5 lobe, 10 Nm, Ensure seal is fully seated and undamaged, Secure 2 airline mounting clips to HV Battery, If HV pack is being shipped then pyro fuses must be removed
  110. Secure A/C compressor HV harness onto battery
    Note
    1x locking connector, 4x clips, Engage locking tab, Do not force lever up, Number of connections may vary by vehicle configuration
  111. Connect RDU HV harness
    Note
    1x connector, Verify lever is upright and in open position, Carefully seat connector and allow lever to engage, Fully secure lever and verify red tab is locked, Do not damage any pins
  112. Connect LHS RDU HV harness
    Note
    1x connector, Verify lever is upright and in open position, Carefully seat connector and allow lever to engage, Fully secure lever and verify red tab is locked, Do not damage any pins
  113. Install clips securing AC compressor HV harness
    Note
    3x clips
  114. Install rear skid plate. See Skid Plate - Rear (Remove and Install).
  115. Lower vehicle until tires are touching the ground
    Note
    Raise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
  116. Reconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  117. Remove the frunk assembly. See Frunk Assembly (Remove and Install)
  118. Warm up AC compressor via UI
    Note
    Via Climate Control > ON, Set fan speed to 10, Set temperature to HI or LO, Allow 20 minute run time
  119. Turn off the AC and blower motor
  120. Disconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  121. Disconnect HV harness connector from AC compressor
    Note
    1x locking electrical connector, Pull red locking tab away from compressor then slide black lock upwards to release
  122. Perform isolation test on AC compressor
    Note
    Move HV harness aside as needed, Set insulation meter to 1000V and red lead to resistance (Ω), Secure black alligator clip to shock tower brace, Position leads then press test button, Amber light will turn on, Test both terminals, Make sure to wear proper PPE, Verify voltage drops below 10V after releasing test button
  123. Select "Resume" to continue to "Warm Heat Pump A/C Compressor Isolation Test" panel
    Note
    Read panel and submit resistance to continue
  124. Read "HV Isolation Diagnostic Debug" results
    Note
    If this panel is reached then screenshot and escalate a Toolbox session, Select "X" at top right of window to close once complete
  125. Reconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  126. Install the rear underhood apron. See Underhood Apron - Rear (Remove and Install).
  127. Install the bed floor assembly. See Bed Floor Assembly (Remove and Install).
  128. Exit Service Mode. See Service Mode.
  129. Remove the vehicle from the lift. See Raise Vehicle - 2 Post Lift.
  130. Raise the LH front window and close the LH front door.