Ferrite Core - Device Cluster Assembly (Installation)
Correction code
16300105726
FRT
0.12
NOTE: Unless
otherwise explicitly stated in the procedure, the correction code and its
associated FRT reflect all of the work required to perform this procedure,
including the linked procedures. Do not stack correction
codes unless explicitly told to do so.
NOTE: See Flat Rate Times to
learn more about FRTs and how they are created.
NOTE: See Personal Protection to make
sure you are wearing proper PPE when performing the procedure below.
NOTE: See Ergonomic Precautions for safe and healthy
working practices.
- 2026-02-27: Added steps to remove DCA splash shield for more space to install ferrite core.
- 2026-01-21: Added ferrite core part number.
High Voltage Awareness Care Pointsfor additional glove and safety information.
| Device Cluster Assembly part numbers that require ferrite core install |
|---|
| 1816026-00-B |
| 1739209-03-D |
| 1816026-00-G |
| 1739209-02-D |
| 1816026-01-B |
| 1816026-04-B |
| 1739209-01-D |
| 1816026-05-B |
| 1816026-06-B |
| 1816026-07-B |
| 1816026-08-B |
| 1816026-09-B |
- 2134590-00-A - CTSB, ANC, FERRITE T75 ROUND CABLE CORE ASSEMBLY
Install
-
Lift the device cluster header seal to access the HVIL electrical connector, release
the clip that attaches the connector to the vehicle, and then disconnect the electrical
connector.
-
Slide the device cluster header off
the DC bus links.
-
Disconnect the device cluster harness
yellow electrical connector.
-
Release the clips (x2) that attach the DCA splash shield to the DCA, and then remove
the splash shield from the DCA.
-
Measure 129mm from the base of the
device cluster harness yellow electrical connector, and then mark the harness with a
marker.
-
Align the top of the ferrite core at
the marked location on the device cluster harness, and then install the ferrite
core.
-
Wrap the ferrite core with a single
piece of felt tape as described below.
- 2 wraps at the base of the ferrite core
- 5-7 wraps over the ferrite core body
- 2 wraps at the top of the ferrite core
-
Position the DCA splash shield to the DCA, and then engage the clips (x2) that attach
the splash shield to the DCA.
-
Connect the DCA harness yellow
electrical connector.
-
Position the DC header onto the device
cluster assembly.
-
Connect the HVIL electrical connector,
and then secure the clip that attaches the connector body to the device cluster
assembly.