Heat Exchanger - Rear Drive Unit - LH (Tri Motor) (Remove and Replace)
Correction code N/A NOTE: Unless otherwise explicitly stated in the procedure, the above correction code and FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. To provide feedback on FRT values, email LaborTimeFeedback@tesla.com. NOTE: See Personal Protection to make sure wearing proper PPE when performing the below procedure.
-
Open LH front door
NotePush LH B-pillar door trigger to release
-
Lower LH front window
-
Raise and support vehicle
NoteSet air suspension to "Jack Mode"
-
Open powered front trunk
NoteVia exterior switch or UI
-
Open tonneau cover
NotePress forward arrow on LH bed rail
-
Open tailgate
NotePress button to release
-
Place vehicle in service mode
NoteVia UI > Controls > Software, Touch and hold "Cybertruck" for 2 seconds then release, Use screen keyboard to type "service" into dialog box then select OK
-
Unlock vehicle gateway
NoteAfter vehicle has been put into "Service Mode", place keycard on center console to turn on drive rails, hold down the brake pedal, while keep pressing right hand signal button simultaneously for at least 10 seconds, "GTW UNLOCKING" should pop up on the UI right next to the VIN during these 10 seconds, once gateway is unlocked "GTW UNLOCKED 5400" will be displayed on the UI next to the VIN, the gateway will remain unlocked for 90 minutes, follow steps on Toolbox article #5582900 for any additional information
-
Access thermal system routines using the UI
NoteSelect quick controls > Service mode > Diagnostics > Thermal, Authorize routines by holding right turn signal, depressing brake pedal for 10 seconds with key on phone dock
-
Select 'Coolant System' to enter coolant circuit screen, Select 'Coolant Fill/Drain' using the UI and PROC_VCFRONT_X_START-THERMAL-FILL-DRAINvia Toolbox: (link)via Service Mode:
- Thermal ➜ Actions ➜ Start Thermal Fill/Drain
- Thermal ➜ Coolant System ➜ Start Coolant Fill/Drain
- Thermal ➜ Refrigerant System ➜ Start Refrigerant Fill/Drain
NoteVerify indicator displays green for Coolant readiness, Thermal Fill Drain routine has a 50 minute time limit -
Power down vehicle via UI
NoteVerify EPBs are engaged, Select charge port icon to ensure drive state is disengaged then power down vehicle via Controls > Safety > Power Off
-
Remove rear underhood apron
Note9x clips
-
Unlock fireman's loop connector and disconnect, Slide eCPA to left on the MV battery connector then lift lever to release
Note2x connectors, Unlock fireman's loop connector and disconnect, Release eCPA by pushing down to unlock and slide red locking tab to left, Wait 2 minutes for electrical circuits to discharge before disconnecting modules
-
Raise vehicle fully
NoteSet to a comfortable working height, Lower to locks, Ensure locks engage on both sides to prevent tilting
-
Remove Mid-aero shield
Note6x clips, 3x bolts, 15mm, 42 Nm, 5x bolts, 13mm, 28 Nm, 2x bolts, 10mm, 6 Nm
-
Remove rear aero shield
Note5x bolts, 10mm, 6 Nm, 2x guides
-
Lower vehicle partially and set lift onto locks
NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered, Set vehicle to comfortable working height
-
Position coolant catcher below rear drive unit
-
Lower vehicle until tires are touching the ground
NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
-
Remove fastener covers from bed floor assembly
Note6x covers
-
Remove bed floor assembly
Note10x bolts, 15mm, 56 Nm, 4x anchors, Open anchors as needed, Lift front edge with trim tool then remove panel, Recommend assistance
-
Place shop rags underneath RDU LH heat exchanger
-
Release RDU return hose from LH heat exchanger
Note1x spring clip, 1x tree clip, Plug coolant connections as needed, Move aside as needed
-
Release LH RDU inverter to chiller hose from heat exchanger
Note1x spring clip, Clip will clash with casting but release enough to release connection, Plug coolant connections as needed
-
Remove RDU LH heat exchanger
Note2x bolts, EP10, 5 Nm +30 degrees
-
Clean area underneath RDU LH heat exchanger
-
Install RDU LH heat exchanger
Note2x bolts, EP10, 5 Nm +30 degrees, 2x O-rings, Lubricate O-rings with drive unit oil as needed, Verify seals are not damaged
-
Secure LH RDU inverter to chiller hose onto heat exchanger
Note1x spring clip, Remove plugs as needed
-
Secure RDU return hose onto LH heat exchanger
Note1x spring clip, 1x tree clip, Remove plugs as needed
-
Remove shop rags from underneath RDU LH heat exchanger
-
Raise vehicle fully
NoteSet to a comfortable working height, Lower to locks, Ensure locks engage on both sides to prevent tilting
-
Position oil drain underneath RDU
-
Placeholder - Remove oil fill plug from RDU
Note1x plug, 8mm Allen, 15 Nm, Verify O-ring is not damaged, Replace O-ring as needed, Tooling used for torque is still in development
-
Set up fill kit with KAF1
NoteAdd extra oil to container as it will prevent underfill and additional air being injectedOnly use KAF1 fluid, Do not interchange or mix oil types
-
Position oil pump hose into fill hole
-
Pump fluid into rear drive unit
NotePump fluid into drive unit until fluid spills outUse excess gearbox fluid in fill container to allow oil pump to dispense fluid without drawing air, Make sure that there is less than 200mL left when completed
-
Remove oil pump hose from fill port
NoteTurn knob to off and remove from fill hole
-
Spray area with brake cleaner and wipe any residual fluid
-
Placeholder - Secure oil fill plug onto RDU
Note1x plug, 8mm Allen, 15 Nm, Verify O-ring is not damaged, Replace O-ring as needed, Tooling used for torque is still in development
-
Remove oil drain from underneath vehicle
-
Lower vehicle partially and set lift onto locks
NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered, Set vehicle to comfortable working height
-
Remove coolant bottle cap
-
Install vacuum refill cap onto coolant bottle assembly
-
Place empty coolant container into front storage area
NoteIf frunk is not installed take caution, CFM fan shroud assembly cannot support a full coolant container, Ensure overflow container is empty, Place fender cover over FEM and front fascia
-
Fill container with at least 15L of coolant
-
Place filled coolant container onto coolant drain & fill cart
NoteDo not place container with 15L of coolant on top of CFM fan shroud, Position cart as close as possible to front of vehicle
-
Setup coolant refill tool
NoteVerify all valves on refill tool are in the closed position, See image for clarity
-
Install vacuum refill hose to refill cap on coolant bottle
NotePerform push-pull-push test to verify hose is fully installed
-
Position overflow hose into empty container
-
Place refill hose inside filled coolant container
NoteMake sure hose end is fully submerged into coolant
-
Connect shop air supply to coolant refill tool
NoteIf not already done, Verify refill valve is set to off
-
Open air inlet valve to draw a vacuum, Once gauge stabilizes, Fully close valve
NoteGauge stabilizes roughly (60-70 cmHg), Vacuum should not drop after the valves are closed
-
Slowly open the refill valve to allow coolant to be drawn into the system
NoteMake sure hose end of refill hose is fully submerged during entire process
-
Once the gauge reads zero, close the coolant refill valve
-
Remove shop air supply to coolant refill tool
NoteIf not already done, Verify refill valve is set to off
-
Remove coolant refill hose from coolant container
-
Remove coolant overflow hose from coolant container
-
Remove vacuum refill hose from refill cap on coolant bottle
-
Remove vacuum refill cap from coolant bottle assembly
-
Remove coolant refill tool from vehicle
NoteMove coolant drain & fill cart away from vehicle
-
Remove coolant container from inside underhood area
-
Slide eCPA to the right and ensure it is seated against the black lever, Connect fireman's loop 20 seconds after eCPA engagement
Note2x connectors, Slide and secure red locking tab on top of release lever, Lock fireman's loop connection, If power cycling vehicle ensure at least 60 seconds has passed since powering down
-
Select ‘Stop Thermal Fluid Fill/Drain’, click ‘Run’, and allow routine to complete
NoteSelect 'Close' once complete
-
Select ‘Coolant Air Purge’, click ‘Run’, and allow routine to complete
-
Perform Thermal Performance through the UI
NoteSelect Thermal > Actions > Test Thermal Performance, click Run, close once routine is completed, if thermal test fails follow https://toolbox.teslamotors.com/articles/206000
-
Inspect coolant level and top off as necessary
NoteEnsure that the fluid level is at the Max line, Top off fluid as required
-
Install coolant bottle cap
-
Install rear underhood apron
Note9x clips, Adjust windshield seal as required
-
Close powered front trunk
NoteVia exterior switch or UI
-
Install bed floor assembly
Note10x bolts, 15mm, 56 Nm, 4x anchors, Open and close anchors as needed, Recommend assistance
-
Install fastener covers onto bed floor assembly
Note6x covers
-
Raise vehicle fully
NoteSet to a comfortable working height, Lower to locks, Ensure locks engage on both sides to prevent tilting
-
Remove coolant catcher from below vehicle
-
Install rear aero shield
Note5x bolts, 10mm, 6 Nm, 2x guides
-
Install Mid-aero shield
Note6x clips, 3x bolts, 15mm, 42 Nm, 5x bolts, 13mm, 28 Nm, 2x bolts, 10mm, 6 Nm, Apply Loctite 222 onto mid aeroshield bolts and install fasteners
-
Lower vehicle until tires are touching the ground
NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
-
Remove vehicle from lift
NoteLower rack arms fully and remove them from under vehicle, Remove air suspension from "Jack Mode"
-
Exit Service Mode
NoteVia UI > Service > Exit, Press and hold "Exit Service Mode" button
-
Raise LH front window
-
Close LH front door
-
Close tonneau cover
-
Close tailgate