07/11/2024 09:08:26

Tonneau Slat Assembly - Slat System - Tonneau (Rework)

Correction code 1120122007 FRT 1.02 NOTE: Unless otherwise explicitly stated in the procedure, the above correction code and FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. To provide feedback on FRT values, email LaborTimeFeedback@tesla.com. NOTE: See Personal Protection to make sure wearing proper PPE when performing the below procedure.

  • 2024-10-7: Updated steps to only add 1 slat instead of 2 slats.
Warning IconA warning icon, calling your attention to a possibly risky situation
Warning
This procedure is a DRAFT, although it has been validated. Warnings and Cautions might be missing. Follow safety requirements and use extreme caution when working on or near high voltage systems and components. Provide corrections and feedback to ServiceDevelopment@teslamotors.com.

Procedure

  1. Close the tonneau cover.
  2. Inspect Water Management slat.
    Informational PurposesAn informational icon, calling your attention
    Note
    If any gap is present in the fore/aft space between the tonneau applique and Water Management slat, continue the rework to remove 2 chain links and add 2 slats to close the gap.
  3. Remove the tonneau slat assembly. See Slat System - Tonneau (Remove and Install).
  4. Remove the crosscar fixation tubes (x3).
    Informational PurposesAn informational icon, calling your attention
    Note
    The last tube at the water management slat will be removed at a later step.
  5. Insert 2 inflatable bags under the tonneau slats at the tonneau transfer frame crossbar.
  6. Remove the LH Water Management slat bolts, rollers, and Tonneau Service Kit. Repeat this step for the RH side.
    Informational PurposesAn informational icon, calling your attention
    Note
    2x slat bolts, 2x sleeves, 4x rollers, 1x Y-React Clip. Carefully pull outwards to release slat bolts from slats.
    Figure 1. LH shown; RH similar
    Figure 2. LH shown; RH similar
  7. Slide the Water Management slat away from the slat assembly to release it, and then remove the Water Management slat from the assembly.
    Informational PurposesAn informational icon, calling your attention
    Note
    The chain links will come with the slat.
  8. Remove last link of LH chain. Repeat this step fr the RH chain.
    Informational PurposesAn informational icon, calling your attention
    Note
    1x bushing. Use special tonneau removal tool to release roller bolt from the chain bushing. Remove the bushing and last chain slat. Discard bushing and use new bushing to lock pin in place. Remove Y-reaction clip and install at a later step at the Water Management Slat.
  9. Re-position Y-reaction clips on LH side of chain. Repeat this step for the RH side of the chain.
    Informational PurposesAn informational icon, calling your attention
    Note
    5x clips. Replace any broken clips. Move all clips 1/2 step down to secure last link of chain. Leave top most link open to secure at a later step.
  10. Install one slat onto the front of the tonneau slat assembly.
    Informational PurposesAn informational icon, calling your attention
    Note
    Apply silicon lubrication onto tonneau sealing slat to ease installation. Position mid slat onto tonneau and slide into place. Ensure slat is properly installed onto tonneau sealing channel.
  11. Install Water Management slat with tonneau chain
    Informational PurposesAn informational icon, calling your attention
    Note
    Apply silicon lubrication onto tonneau sealing slat to ease installation, Position bushing slat to match slat hinge opening, Slide into place
  12. Install RH Mid Slat Roller Tonneau Service Kit to join new slat. Repeat this step for the LH side.
    Informational PurposesAn informational icon, calling your attention
    Note
    2x slat bolts, 2x sleeves, 4x rollers, 1x Y-React Clips. Insert slat bolts into slats until fully engaged.
  13. Install LH Y-reaction clip to Water Management Slat Bolt Roller. Repeat this step for the RH side.
    Informational PurposesAn informational icon, calling your attention
    Note
    1x Y-React Clip. Re-use clip removed from last link of chain at previous step. Ensure clip is fully engaged to both roller pins.
  14. Install fixation tubes
    Informational PurposesAn informational icon, calling your attention
    Note
    3x crosscar fixation tubes, From the Water Management crosscar fixation tube Skip 3 chain bushings for backlite opening when tonneau is closed, Skip 2 chain bushings for next tube then Skip1 chain bushing and install the last tube in the last bushing on the chain
  15. Install the tonneau slat assembly. See Slat System - Tonneau (Remove and Install).
  16. On the vehicle touchscreen, navigate to UI > Closures > Tonneau > Calibrate Tonneau to run the Tonneau Calibration routine.
    Informational PurposesAn informational icon, calling your attention
    Note
    Allow the routine to complete. The tonneau will move while the routine running.
  17. Close the tonneau cover.
  18. Confirm there is no gap present between the tonneau cover and the tonneau applique.
    Informational PurposesAn informational icon, calling your attention
    Note
    Confirm no gap present fore/aft and top of slat to bottom of seal.
  19. Exit Service Mode. See Service Mode.
  20. Raise the LH front window and close the LH front door.