PCB, AC Junction Box, B2 (Remove and Install)
    
    
    Correction code
    1630010091
    1630010092
    FRT
    3.42
    
    
          
            NOTE: Unless otherwise explicitly stated in the procedure, the above correction code and FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so.
          
            NOTE: See Flat Rate Times to learn more about FRTs and how they are created. To provide feedback on FRT values, email ServiceManualFeedback@tesla.com.
          
            NOTE: See Personal Protection to make sure wearing proper PPE when performing the below procedure.
          
            NOTE: See Ergonomic Precautions for safe and healthy working practices.
        
  
- 2025-08-06: Rearrange steps to avoid unnecessary alerts.
 - 2024-11-22: Added warning to NOT skip steps to remove the tonneau slats.
 - 2024-11-22: Added missing step to remove/install tonneau slats.
 
- Raise and support the vehicle. See Raise Vehicle - 2 Post Lift.
 - Open the LH front door and lower the LH front window.
 - Place the vehicle into Service Mode. See Service Mode.
 - Unlock the vehicle Gateway. See Gateway (Unlock).
 - Remove the tonneau slats. See Slat System - Tonneau (Remove and Install).
 - 
        Remove bed floor assembly
        Note10x bolts, 15mm, 56 Nm, 4x anchors, Open anchors as needed, Lift front edge with trim tool then remove panel, Recommend assistance
 - 
        Remove fasteners securing RH tonneau NVH
          barrier
        Note6x bolts, T25, 5 Nm, Vehicles built before April 2024 will have 1-piece NVH cover, 5x bolts, 8mm, 5 Nm, Vehicles built after April 2024 will have updated 1-piece NVH cover, 9x bolts, 4mm Allen, 5 Nm, Vehicles built after October 2024 will have 2-piece NVH cover
 - 
        Remove RH tonneau NVH barrier
        NoteVehicles built before April 2024 will have 1-piece NVH cover, Vehicles built after April 2024 will have updated 1-piece NVH cover, Vehicles built after October 2024 will have 2-piece NVH cover, Maneuver around bed wall then remove
 - 
        Remove fasteners securing LH tonneau NVH
          barrier
        Note5x bolts, T25, 5 Nm, Vehicles built before April 2024 will have 1-piece NVH cover, 5x bolts, 8mm, 5 Nm, Vehicles built after April 2024 will have updated 1-piece NVH cover, 9x bolts, 4mm Allen, 5 Nm, Vehicles built after October 2024 will have 2-piece NVH cover
 - 
        Remove LH tonneau NVH barrier
        NoteVehicles built before April 2024 will have 1-piece NVH cover, Vehicles built after April 2024 will have updated 1-piece NVH cover, Vehicles built after October 2024 will have 2-piece NVH cover, Maneuver around bed wall then remove
 - 
        Remove tonneau coverbox cross
          supports
        Note8x screws, T25, 5 Nm
 - 
        Clean all debris from ancillary
          cover
        NoteDuring removal of ancillary cover any debris on top of the cover may be deposited into the ancillary bay
 - 
        Open powered front trunk
        NoteVia exterior switch or UI
 - 
        Power down vehicle via UI
        NoteVerify EPBs are engaged, Select charge port icon to ensure drive state is disengaged then power down vehicle via Controls > Safety > Power Off
 - 
        Remove rear underhood apron
        Note9x clips
 - 
        Disconnect FRL connector then disconnect
          MV battery connector 
        Note2x connectors, Release locking tab then disconnect FRL connector, Slide eCPA to left then lift lever to release MV battery connector, Early production trucks may have black FRL connector, Release eCPA by pushing down to unlock and slide red locking tab, Wait 2 minutes for electrical circuits to discharge before disconnecting modules
 - 
        Verify operation of multimeter
        NoteSet multimeter to DC voltage, Confirm multimeter is properly measuring voltage by testing MV battery, Touch lightly and do not damage terminals
 - 
        Release pressurized pack air line to
          Ancillary
        Note1x connector, Do not release air line to reservoir, Rapid loss of pressure will result if wrong air line is released.
 - 
        Remove VOSS fitting from pressurized
          pack air line to Ancillary
        Note1x VOSS fitting, Slide threaded section back, Remove the collet, Then slide threaded section off of air line, Discard after removal
 - 
        Release pressurized pack valve block
          from air suspension reservoir
        Note1x bolt, 10mm, 5 Nm, 1x connector, 1x clip, 1x zip tie, Release lock before connector disengagement, Cut zip tie at reservoir/ancillary air line bundle, Release harness clip at bracket
 - 
        Release air suspension valve block
        Note3x rubber grommets, Rotate clockwise until top 2 rubber feet have released from bracket, Pull upwards at 45 degree angle to release bottom rubber foot from bracket, Leave all air lines and connections secured and set assembly aside
 - 
        Release air suspension reservoir
        Note2x nuts, 13mm, 33 Nm, 2x fir tree clips
 - 
        Place air suspension reservoir in
          service position then install Ancillary Access Bench
        NoteRaise and swing air suspension reservoir to the side of the bed, Place Ancillary Access Bench onto rear casting ensuring no air lines or harnesses are being pinched
 - Remove mid aeroshield. See Skid Plate - Rear (Remove and Install).
 - 
        Disconnect pressurized pack lines
        Note2x VOSS fittings, 12mm, 8Nm, Discard and replace
 - 
        Remove VOSS fitting from pressurized
          pack air lines
        Note2x VOSS fitting, Slide threaded section back, Remove the collet, Then slide threaded section off of air line, Discard after removal
 - 
        Remove all items from pockets and ensure
          not wearing metal items
        
 - 
        Inspect HV insulating gloves
        NoteCheck gloves for damage prior to use, Refer to service document TN-15-92-003, for information on inspecting HV gloves. https://service.teslamotors.com/documents?model=&keys=TN-15-92-003&vehicle_system=&sort_by=field_date_submitted&sort_order=DESC
 - 
        Put on HV insulating gloves and leather
          over gloves
        
 - 
        Verify no HV - Install amp clamp to RDU
          HV harness
        NoteVerify meter is zeroed out before performing measurement, Measure single cable. Verify ammeter is installed in correct direction. If current > 0.5A do not proceed with disconnecting HV connector. In this case, start vehicle electrical isolation again to make sure that all was properly shut down. Escalate for assistance as requiredIf current < 0.5A, Ok to disconnect and check voltage at HV plug on the battery side.Release locking tab and rotate the release lever up to disengage the connector, Release harness clip, Do not force the release lever up, Ensure the alignment tabs on the RDU header are not damagedMake sure to wear PPE (HV gloves, safety glasses) when working on high voltage component, Measure B+ to Ground, B- to Ground, B+ to B-, If voltage is greater than 10V, Pack contactors are not open or welded, Stop work and reach out to Service Engineering
 - 
        Secure RDU header connector to
          ancillary
        Note1x connector, Verify lever is in the upright and open position, Carefully seat connector and allow lever to engage, Fully secure lever and verify red tab is locked, Do not damage any pins
 - 
        Remove Pyro Fuse Access cover
        Note4x bolts, E-Torx 5 lobe, 10 Nm
 - 
        Remove primary pyro fuse
        Note2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
 - 
        Remove secondary pyro fuse
        Note2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
 - 
        Lower vehicle until tires are touching
          the ground
        NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
 - 
        Disconnect ancillary bay MV
          connector
        Note1x connector, Double locking, Release tab then pivot lever, Release second tab to disengage connector, Wait 1 second between locking tab release to discharge and prevent arcing
 - 
        Remove bolt securing busbar HV connector
          lid
        Note1x bolt, EP10, 9 Nm
 - 
        Remove bolts securing HV connector to DC
          FC header
        Note2x bolts, 10mm, 9 Nm
 - 
        Release HV connector from DC FC
          header
        Note1x connector, Use inflatable airbag to suspend busbar assembly above ancillary assembly
 - 
        Support HV Busbar assembly
        NoteSuspend assembly to maintain clearance
 - 
        Remove fast charger header doubler
        Note2x bolts, E10 5 Lobe Torx, 10 Nm
 - 
        Release low voltage header
        Note2x bolts, 10mm, 6 Nm
 - 
        Release fasteners securing ancillary
          cover to HV battery
        Note22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
 - 
        Remove ancillary cover
        NoteUse suction cup and maneuver around busbar and tonneau cage
 - 
        Remove ACJB to PCS HV jumper
          harness
        Note2x connectors, Release locking tab and pull connector out of respective header, Do not pull on harness
 - 
        Release ACJB LV connector & ACJB to
          device cluster HV connector
        Note2x connectors, Release connector locks, Depress levers and pull at connectors, Do not pull at harness
 - 
        Release ancillary connectors to center
          console outlet and bed outlet
        Note2x connectors, Release locking tabs, Slide locks to release
 - 
        Release ACJB fasteners
        Note6x bolts, E10 5 Lobe Torx, 6Nm
 - 
        Release ACJB from ancillary tray
        Note2x clips, 2x datums, Release clips at headers, Slide ACJB inboard on datums
 - 
        Remove ACJB from ancillary tray
        NoteLift over and out of PCS once headers clear outboard side of ancillary tray
 - 
        Install ACJB to ancillary tray
        NoteAlign headers and slide openings to datums in ancillary tray
 - 
        Slide ACJB into ancillary tray until
          header clips are fully engaged
        NoteEnsure all fastener holes are aligned
 - 
        Secure ACJB fasteners
        Note6x bolts, E10 5 Lobe Torx, 6Nm
 - 
        Secure ancillary connectors to center
          console outlet and bed outlet
        Note2x connectors, Slide locks to fully engage, Secure locking tabs
 - 
        Install ACJB to PCS HV jumper
          harness
        Note2x connectors, Secure at ACJB first then fold harness over to PCS, Secure locking tab on both connectors
 - 
        Secure ACJB LV harness connector &
          ACJB HV harness to device cluster connector
        Note2x connectors, Secure connector locks
 - 
        Install ancillary cover
        NoteUse suction cup and maneuver around busbar and tonneau cage
 - 
        Secure fasteners of cover to HV
          battery
        Note22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
 - 
        Secure low voltage header
        Note2x bolts, 10mm, 6 Nm
 - 
        Secure fast charger header doubler
        Note2x bolts, E10 5 Lobe Torx, 10Nm
 - 
        Clean HV connector contact surface of
          residual Penetrox
        NoteAllow 1 minute dry time after removing Penetrox, New busbar comes with Penetrox applied to HV connector
 - 
        Clean busbar HV connector contact
          surface of residual Penetrox
        NoteAllow 1 minute dry time after removing Penetrox, It is necessary to clean HV connector during re-use of busbar
 - 
        Apply Penetrox onto HV connector
          joints
        NoteApply 2 drops of Penetrox A-13 about 5mm in diameter to either side of the hole on both leads, Spread evenly to verify the contact surface is fully covered
 - 
        Position busbar connector and lower onto
          HV header
        NoteRelease bungee cord
 - 
        Install bolts securing charge port
          busbar kit to HV Header
        Note2x bolts, 10mm, 9 Nm
 - 
        Perform Hioki resistance test at each HV
          joint from HV busbar lead to bolt head
        Note2x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
 - 
        Install bolt securing busbar HV
          connector lid
        Note1x bolt, EP10, 9 Nm
 - Remove leather over gloves and HV insulating gloves
 - 
        Connect Ancillary bay MV connector
        Note1x connector, double locking, Rotate lever into 2nd lock, Perform a pull test to ensure connector engaged correctly
 - 
        Secure tonneau coverbox cross
          supports
        Note8x screws, T25, 5 Nm, Supports install in the same direction of the fasteners
 - 
        Position LH tonneau NVH barrier
        NoteVehicles built before April 2024 will have 1-piece NVH cover, Vehicles built after April 2024 will have updated 1-piece NVH cover, Vehicles built after October 2024 will have 2-piece NVH cover, Maneuver around bed wall then position
 - 
        Install fasteners securing LH tonneau
          NVH barrier
        Note5x bolts, T25, 5 Nm, Vehicles built before April 2024 will have 1-piece NVH cover, 5x bolts, 8mm, 5 Nm, Vehicles built after April 2024 will have updated 1-piece NVH cover, 9x bolts, 4mm Allen, 5 Nm, Vehicles built after October 2024 will have 2-piece NVH cover
 - 
        Position RH tonneau NVH barrier
        NoteVehicles built before April 2024 will have 1-piece NVH cover, Vehicles built after April 2024 will have updated 1-piece NVH cover, Vehicles built after October 2024 will have 2-piece NVH cover, Maneuver around bed wall then position
 - 
        Install fasteners securing RH tonneau
          NVH barrier
        Note6x bolts, T25, 5 Nm, Vehicles built before April 2024 will have 1-piece NVH cover, 5x bolts, 8mm, 5 Nm, Vehicles built after April 2024 will have updated 1-piece NVH cover, 9x bolts, 4mm Allen, 5 Nm, Vehicles built after October 2024 will have 2-piece NVH cover
 - 
        Remove Ancillary Access Bench then place
          air suspension reservoir into position for installation
        NoteEnsure air lines are not twisted, Ensure no harnesses are caught
 - 
        Secure air suspension reservoir
        Note2x nuts, 13mm, 33 Nm, 2x fir tree clips
 - 
        Secure air suspension valve block
        Note3x rubber grommets, Rotate counter-clockwise until top 2 rubber feet are secured onto bracket, Push downwards at 45 degree angle to secure bottom rubber foot into bracket, Position air lines and connections into place for installation
 - 
        Install new VOSS air fitting to
          pressurized pack valve block at ANC circuit
        Note1x VOSS fitting, 12mm, 8 Nm, Do not remove VOSS plastic plug until pressurized pack line is installed
 - 
        Secure pressurized pack air line from
          Ancillary to valve block
        Note1x line, Remove plastic cap from VOSS fittings, Press air lines into fitting until mark aligns with top of fitting, Verify line is properly secured by performing push and pull test
 - 
        Secure pressurized pack valve block to
          air suspension reservoir
        Note1x bolt, 10mm, 5 Nm, 1x connector, 1x clip, 1x zip tie, Secure reservoir and ancillary air lines at white marked sections
 - 
        Install bed floor assembly
        Note10x bolts, 15mm, 56 Nm, 4x anchors, Open and close anchors as needed, Recommend assistance
 - Raise vehicle fully
 - 
        Remove all items from pockets and ensure
          not wearing metal items
        
 - 
        Inspect HV insulating gloves
        NoteCheck gloves for damage prior to use, Refer to service document TN-15-92-003, for information on inspecting HV gloves. https://service.teslamotors.com/documents?model=&keys=TN-15-92-003&vehicle_system=&sort_by=field_date_submitted&sort_order=DESC
 - 
        Put on HV insulating gloves and leather
          over gloves
        
 - 
        Clean mating surface of the pyro
        NoteUse a non-conductive plastic tool to clean the busbar side, Allow 1 minute for IPA to fully dry, Do not use any other types of cleaner
 - 
        Install secondary pyro fuse
        Note2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts
 - 
        Install primary pyro fuse
        Note2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts
 - 
        Perform Hioki resistance test at each HV
          joint from HV busbar lead to pyro fuse busbar
        Note4x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
 - Remove leather over gloves and HV insulating gloves
 - 
        Install Pyro Fuse Access cover
        Note4x bolts, E-Torx 5 lobe, 10 Nm, Ensure seal is fully seated and undamaged
 - 
        Install pressurized pack lines
        Note2x VOSS fittings, 12mm, 8 Nm, Remove plastic caps from VOSS fittings, Install new VOSS fittings if re-using fuse cover, Press air lines into fitting until mark aligns with top of fitting, Verify line is properly secured by performing push and pull test
 - Install the mid aeroshield. See Skid Plate - Rear (Remove and Install).
 - 
        Lower vehicle until tires are touching
          the ground
        NoteRaise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
 - Reconnect MV power. See Disconnect MV Power (Modify).
 - Install the rear underhood apron. See Underhood Apron - Rear (Remove and Install).
 - Install the tonneau slats. See Slat System - Tonneau (Remove and Install).
 - Exit Service Mode. See Service Mode.
 - Raise the LH front window and close the LH front door.
 - Remove the vehicle from the lift. See Raise Vehicle - 2 Post Lift.