2026-10-29

Device Cluster Assembly (Long Range) (Remove and Replace)

Correction code 16300106002 2.52 NOTE: Unless otherwise explicitly stated in the procedure, the correction code and its associated FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. NOTE: See Personal Protection to make sure you are wearing proper PPE when performing the procedure below. NOTE: See Ergonomic Precautions for safe and healthy working practices.

Warning
This procedure is a DRAFT. Although it has been validated, Warnings and Cautions might be missing. Follow safety requirements and use extreme caution when working on or near High Voltage systems and components.
Warning
Cybertruck electronics are powered by a 48V "mid voltage" or "MV" architecture that is designed to improve efficiency. Servicing MV components requires extra knowledge and care in order to avoid personal and/or vehicular harm. Read and understand MV precautions in Electrical Precautions and make sure any required MV-related training courses have been completed, as applicable.
Warning
Only technicians who have been trained in High Voltage Awareness and have completed all required certification courses (if applicable) are permitted to perform this procedure. Proper personal protective equipment (PPE) and insulating HV gloves with a minimum rating of class 0 (1000V) must be worn at all times a high voltage cable, busbar, or fitting is handled. Refer to Tech Note TN-15-92-003, High Voltage Awareness Care Points for additional glove and safety information.
  • 2025-06-21: Released new procedure.
  1. Raise and support the vehicle. See Raise Vehicle - 2 Post Lift.
  2. Open the LH front door and lower the LH front window.
  3. Connect Toolbox to the vehicle. See Toolbox 3 (Connect and Disconnect).
  4. Place the vehicle into Service Mode. See Service Mode.
  5. Unlock the vehicle Gateway. See Gateway (Unlock).
  6. Run ODIN routine PROC_HVBATT_X_DEVICE-CLUSTER-REPLACEMENT-BACKUPvia Service Mode Plus:High Voltage Battery ➜ Device Cluster Assembly (DCA) Replacement ➜ Backup Old DCAvia Toolbox:(link)
  7. Open the powered frunk.
  8. Remove the bed floor assembly. See Bed Floor Assembly (Long Range) (Remove and Install).
  9. Disconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  10. Verify operation of multimeter
    Note
    Set multimeter to DC voltage, Confirm multimeter is properly measuring voltage by testing MV battery, Touch lightly and do not damage terminals
  11. Raise vehicle fully
    Note
    Set to a comfortable working height, Lower to locks, Ensure locks engage on both sides to prevent tilting
  12. Remove the rear skid plate. See Skid Plate - Rear (Remove and Install).
  13. Remove all items from pockets and ensure not wearing metal items
  14. Inspect HV insulating gloves
    Note
    Check gloves for damage prior to use, Refer to service document TN-15-92-003
  15. Put on HV insulating gloves and leather over gloves
  16. Verify no HV - Install amp clamp to RDU HV harness
    Note
    Verify meter is zeroed out before performing measurement, Measure single cable. Verify ammeter is installed in correct direction. If current > 0.5A do not proceed with disconnecting HV connector. In this case, start vehicle electrical isolation again to make sure that all was properly shut down. Escalate for assistance as requiredIf current < 0.5A, Ok to disconnect and check voltage at HV plug on the battery side.Release locking tab and rotate the release lever up to disengage the connector, Release harness clip, Do not force the release lever up, Ensure the alignment tabs on the RDU header are not damagedMake sure to wear PPE (HV gloves, safety glasses) when working on high voltage component, Measure B+ to Ground, B- to Ground, B+ to B-, If voltage is greater than 10V, Pack contactors are not open or welded, Stop work and reach out to Service Engineering
  17. Remove pyro fuse access cover
    Note
    4x bolts, E-Torx 5 lobe, 10 Nm
  18. Remove primary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
  19. Remove secondary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 Degrees, Support pyro fuse while removing bolts
  20. Release connectors at 2x4 header (AC compressor and Inductive Charger headers)
    Note
    2x connectors, Fully release red lock tab, Pull black latch down to release connector
  21. Release 2x4 header assembly
    Note
    4x bolts, 5-lobe 10mm, 6 Nm
  22. Release drive unit connectors from ancillary headers
    Note
    3x connectors, Release blue lock tab, Rotate black latch
  23. Remove bolts securing HC-Stak HV Headers for LHRDU, FDU, RHRDU from ancillary flange
    Note
    6x bolts, 5-lobe 10mm, 10 Nm
  24. Remove LHRDU, FDU, RHRDU headers from ancillary flange
    Note
    3x headers, No tools required, inspect header seals, Replace header if damaged
  25. Lower vehicle until tires are touching the ground
    Note
    Raise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
  26. Disconnect ancillary bay MV connector
    Note
    1x connector, Double locking, Release tab then pivot lever, Release second tab to disengage connector, Wait 1 second between locking tab release to discharge and prevent arcing
  27. Remove bolt securing busbar HV connector lid
    Note
    1x bolt, EP10, 9 Nm
  28. Remove bolts securing HV connector to DC FC header
    Note
    2x bolts, 10mm, 9 Nm
  29. Release HV connector from DC FC header
    Note
    1x connector, Use inflatable airbag to suspend busbar assembly above ancillary assembly
  30. Support HV Busbar assembly
    Note
    Suspend assembly to maintain clearance
  31. Remove fast charger header doubler
    Note
    2x bolts, E10 5 Lobe Torx, 10 Nm
  32. Release low voltage header
    Note
    2x bolts, EP10, 6 Nm
  33. Release fasteners securing ancillary cover to HV battery
    Note
    22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
  34. Remove ancillary cover
    Note
    Use suction cup and maneuver around busbar
  35. Remove DC header
    Note
    Slide header off DC bus links, Inspect seal, Replace header if damaged
  36. Disconnect PCS MV connector
    Note
    1x connector, 1x zip tie, Slide red lock off of lever, Rotate lever to release connector, Remove zip tie as needed
  37. Release PCS MV harness
    Note
    1x bolt, EP10, 6 Nm, 2x clips, Move aside as needed
  38. Release MV header
    Note
    4x datums, 1x edge clip, 1x fir tree clip
  39. Release HVC connectors
    Note
    2x clips, 3x connectors, Release connector locks, Depress levers and pull at connector, Do not pull from harnessIf RTV is present at 2 connectors, using a ceramic knife cut through and remove RTV until connector can be disconnected
  40. Release BMB passthrough connectors
    Note
    2x connectors, Release connector locks, Depress levers and pull at connector, Do not pull from harness
  41. Release ACJB LV connector & ACJB to device cluster HV connector
    Note
    2x clips, 2x connectors, Release connector locks, Depress levers and pull at connectors, Do not pull at harness
  42. Remove MV ancillary harness
  43. Release HVC harness from PCS
    Note
    1x connectors, Release connector lock, Depress lever and pull at connector, Do not pull at harness
  44. Release device cluster busbar fasteners
    Note
    4x bolts, Torx Plus 55, 5Nm + 60 Degrees, Captured bolts with insulated covers
  45. Remove device cluster assembly fasteners
    Note
    4x bolts, E10 5 Lobe Torx, 6Nm
  46. Remove device cluster from ancillary tray
    Note
    Place device cluster on stand to protect headers at bottom of assembly, Remove lifting/install tool, Make sure to wear PPE (HV gloves, safety glasses) when working on high voltage component
  47. Install device cluster to ancillary tray
    Note
    Align datums and headers to ancillary and slowly lower into place, Avoid contact of drive unit headers to ancillary tray, Make sure to wear PPE (HV gloves, safety glasses) when working on high voltage component
  48. Secure device cluster assembly fasteners
    Note
    4x bolts, E10 5 Lobe Torx, 6Nm
  49. Secure device cluster busbar fasteners
    Note
    4x bolts, Torx Plus 55, 5Nm + 60 Degrees, Captured bolts with insulated covers
  50. Perform Hioki measurements from device cluster assembly and busbar bolts
    Note
    1x bolts, E10 5 Lobe Torx, 6Nm, 4x bolts, Torx Plus 55, 5Nm + 60 Degrees, Perform zero adjust to Hioki meter prior to testingUse diagram in images to find probing locations and the reading specifications to look forLSL means: Lower Specification LimitUSL means: Upper Specification Limit1020_301 | T1 LSL 0.002 mΩ (2 μΩ) - USL 0.05 mΩ (50 μΩ)1020_304 | POS Contactor LSL 0.002 mΩ (2 μΩ) - USL 0.05 mΩ (50 μΩ)1010_603 | HVC Ground strap LSL 0.35 mΩ (350 μΩ) - USL 0.78 mΩ (780 μΩ)1020_303 | Shunt2 LSL 0.003 mΩ (3 μΩ) - USL 0.05 mΩ (50 μΩ)1020_302 | Shunt1 LSL 0.003 mΩ (3 μΩ) - USL 0.05 mΩ (50 μΩ)If readings are lower than the LSL numbers you are not probing correctlyIf readings are higher than USL numbers you have bolts that are not torqued correctly or connectors that may be softset or have internal connector issues
  51. Secure HVC harness to PCS
    Note
    1x connectors, Secure connector lock
  52. position MV ancillary harness for install
  53. Secure ACJB LV and HV connectors
    Note
    2x clips, 2x connectors, Secure connector locks
  54. Secure BMB passthrough connectors
    Note
    2x connectors, Secure connector locks, Connectors are poke yoked do not force engagement, Ensure locking tabs are facing front of vehicle when connecting
  55. Secure HVC connectors
    Note
    2x clips, 3x connectors, Release connector locks, Depress levers and pull at connector, Do not pull from harness, Apply sealant to connectors at device cluster if it was present during disassembly
  56. Secure MV header
    Note
    4x datums, 1x edge clip, 1x fir tree clip
  57. Secure PCS MV harness
    Note
    1x bolt, EP10, 6 Nm, 2x clips
  58. Connect PCS MV connector
    Note
    1x connector, 1x zip tie, Install zip tie onto ECPA latch, PCS header not datumed, Ensure correct orientation and polarity of connection, Harness color red for LV+ and black for LV-, Swing down locking lever, Slide lock fully to engage on top of lever
  59. Install DC header
    Note
    Slide header on to DC bus links, Inspect seal, Replace header if damaged
  60. Install ancillary cover
    Note
    Use suction cup and maneuver around busbar
  61. Secure fasteners of cover to HV battery
    Note
    22x bolts, E10 5-Lobe, 6 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the penthouse cover, Follow fastening order
  62. Secure low voltage header
    Note
    2x bolts, EP10, 6 Nm
  63. Secure fast charger header doubler
    Note
    2x bolts, E10 5 Lobe Torx, 10Nm
  64. Clean HV connector contact surface of residual Penetrox
    Note
    Allow 1 minute dry time after removing Penetrox, New busbar comes with Penetrox applied to HV connector
  65. Clean busbar HV connector contact surface of residual Penetrox
    Note
    Allow 1 minute dry time after removing Penetrox, It is necessary to clean HV connector during re-use of busbar
  66. Apply Penetrox onto HV connector joints
    Note
    Apply 2 drops of Penetrox A-13 about 5mm in diameter to either side of the hole on both leads, Spread evenly to verify the contact surface is fully covered
  67. Position busbar connector and lower onto HV header
    Note
    Release bungee cord
  68. Install bolts securing charge port busbar kit to HV Header
    Note
    2x bolts, 10mm, 9 Nm
  69. Perform Hioki resistance test at each HV joint from HV busbar lead to bolt head
    Note
    2x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
  70. Install bolt securing busbar HV connector lid
    Note
    1x bolt, EP10, 9 Nm
  71. Remove leather over gloves and HV insulating gloves
  72. Connect Ancillary bay MV connector
    Note
    1x connector, double locking, Rotate lever into 2nd lock, Perform a pull test to ensure connector engaged correctly
  73. Raise vehicle fully
  74. Inspect HV insulating gloves
    Note
    Check gloves for damage prior to use, Refer to service document TN-15-92-003
  75. Put on HV insulating gloves and leather over gloves
  76. Install LHRDU, FDU, RHRDU headers to ancillary flange
    Note
    3x headers, No tools required, inspect header seals, Replace header if damaged
  77. Secure bolts to HC-Stak HV Headers for LHRDU, FDU, RHRDU to ancillary flange
    Note
    6x bolts, 5-lobe 10mm, 10 Nm
  78. Secure 2x4 header assembly
    Note
    4x bolts, 5-lobe 10mm, 6 Nm, Confirm alignment of assembly with fastener openings
  79. Secure connectors at 2x4 header (AC compressor and Inductive Charger headers)
    Note
    2x connectors, Fully engage red lock tab
  80. Secure drive unit connectors to ancillary headers
    Note
    3x connectors, Rotate black latch, Ensure blue locking tab is fully engaged
  81. Install secondary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts
  82. Install primary pyro fuse
    Note
    2x bolts, 13mm, 5 Nm + 60 degrees, Support pyro fuse while installing bolts
  83. Perform Hioki resistance test at each HV joint from HV busbar lead to pyro fuse busbar
    Note
    4x HV joints, When using Hioki tester, verify the meter has been properly adjusted and set prior to usageThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ).If the resistance is greater than 0.195 mΩ (195 μΩ), stop work and escalate the Toolbox session.If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again.If the resistance is repeatedly between 0.00 mΩ and 0.050 mΩ (50 μΩ), hioki test passed, proceed to next step
  84. Install pyro fuse access cover
    Note
    4x bolts, E-Torx 5 lobe, 10 Nm, Ensure seal is fully seated and undamaged, If HV pack is being shipped then pyro fuses must be removed
  85. Remove leather over gloves and HV insulating gloves
  86. Install the rear skid plate. See Skid Plate - Rear (Remove and Install).
  87. Lower vehicle until tires are touching the ground
    Note
    Raise lift off locks, then hold lock release lever to keep locks free while vehicle is lowered
  88. Secure MV battery maintainer and support vehicle
    Note
    1x cover, Secure MV maintainer but leave the Li-ion battery disconnected, Secure positive terminal to jump post, Secure negative terminal to bolt located between brake fluid reservoir and front trunk, Connect maintainer to power supply, DO NOT allow positive cable to make contact with other metal components, Prevent shorting the cables,Do not have a MV maintainer and the Li-ion battery simultaneously connected for any extended period of time
  89. Restore Device Cluster Assembly
    Note
    Via Service UI> High Voltage Tab > Procedures > Device Cluster Assembly Replacement > Restore New DCA > Run, Laptop must be connected via Toolbox 3 for duration of routine, Follow all on screen instructions and requirements, Do not disconnect Toolbox 3 until routine completes successfully
  90. Power down vehicle via UI
    Note
    Verify EPBs are engaged, Select charge port icon to ensure drive state is disengaged then power down vehicle via Controls > Safety > Power Off
  91. Remove MV battery maintainer
    Note
    1x cover, Unplug the maintainer first, then remove positive and negative leads from jump posts, Re-secure any jump post covers
  92. Reconnect MV power. See Mid-Voltage Power (Disconnect and Connect) (Modify).
  93. Install the rear underhood apron. See Underhood Apron - Rear (Remove and Install).
  94. Install the bed floor assembly. See Bed Floor Assembly (Long Range) (Remove and Install).
  95. Exit Service Mode. See Service Mode.
  96. Raise the LH front window and close the LH front door.
  97. Remove the vehicle from the lift. See Raise Vehicle - 2 Post Lift.