2026-03-05
Cover - Ancillary Bay (Rework) (Battery On Table)
Correction code
16300307
0.06
NOTE: Unless otherwise explicitly
stated in the procedure, the above correction code and FRT reflect all of the work
required to perform this procedure, including the linked procedures. Do not stack correction codes unless
explicitly told to do so.
NOTE: See Flat Rate
Times to learn more about FRTs and how they are created. To provide feedback on
FRT values, email ServiceManualFeedback@tesla.com.
NOTE: See Personal Protection to make sure wearing proper PPE when
performing the below procedure. See Ergonomic Precautions for safe and healthy working practices.
Procedure
-
Using IPA wipes, clean the
surrounding area of HVC bolt 4 on the Ancillary Cover, and then allow 1
minute to dry.
-
Using IPA wipes, clean the surrounding area of HVC bolt 5 on the Ancillary
Cover, and then allow 1 minute to dry.
- Cut a 25 × 25 mm (1" × 1") piece of aluminum tape.
-
Apply the tape on the surrounding area of HVC bolt 4 on the Ancillary
Cover.
NoteApply pressure along the edges of the tape to make sure it is fully seated.
- Cut a second 25 × 25 mm (1" × 1") piece of aluminum tape.
-
Apply the tape on the surrounding area of HVC bolt 5 on the Ancillary
Cover.
NoteApply pressure along the edges of the tape to make sure it is fully seated.
- After installing the Ancillary Bay Cover, perform the Ancillary Bay air leak test. See Ancillary Bay Air Leak Test