2026-11-19

Power Conversion System Coolant (Drain)

Correction code 16202000 FRT 1.08 NOTE: Unless otherwise explicitly stated in the procedure, the correction code and its associated FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. NOTE: See Personal Protection to make sure you are wearing proper PPE when performing the procedure below. NOTE: See Ergonomic Precautions for safe and healthy working practices.

Warning
This procedure is a DRAFT. Although it has been validated, Warnings and Cautions might be missing. Follow safety requirements and use extreme caution when working on or near High Voltage systems and components.

Procedure

  1. Raise and support the vehicle. See Raise Vehicle - 2 Post Lift.
  2. Open the LH front door and lower the LH front window.
  3. Enable Service Mode. See Service Mode (Enable and Disable).
  4. Unlock the vehicle gateway. See Gateway (Unlock).
  5. On the touchscreen, tap Thermal > Coolant System > Start Thermal Fill/Drain, then tap Run. Close once the routine is completed.
    Note
    Thermal Fill Drain routine has a 5 hour time limit. If the run time exceeds 5 hours, the routine must be performed again.
  6. Disconnect LV power. See LV Power (Disconnect and Connect).
  7. Remove the front aero shield panel. See Panel - Aero Shield - Front (Remove and Replace).
  8. Remove the front skid plate. See Skid Plate - HV Battery - Front (Remove and Replace).
  9. Position the coolant drain container under the front of the vehicle to catch vehicle coolant.
  10. Release the clip and disconnect the 3 way valve to HV battery hose from the HV battery, and then immediately plug the fittings.
  11. Release the clip and disconnect the HV battery coolant supply hose from the HV battery, and then immediately plug the fittings.
  12. Release the clip and disconnect the power conversion system coolant supply hose from the HV battery, and then immediately plug the fittings.
  13. Release the clips (x2) on the LH front wheel arch liner, and then move the liner aside for access.
  14. Release the clips (x2) that attach the power conversion system coolant return to LH sill hose to the body.
  15. Release the clip and disconnect the power conversion system coolant return to LH sill hose from the LH sill hose, and then immediately plug the fittings.
  16. Place foldable funnel and absorbent material under the PCS hose.
    Note
    For Plaid vehicles only: Place funnel and absorbent material underneath the PCS coolant hose as there is another hose to release.
  17. For Plaid vehicles only:Release the clip, disconnect the rear drive unit branch of the power conversion system coolant return hose from the coolant return hose, and then immediately plug both fittings.
  18. Remove the foldable funnel and absorbent material from underneath the PCS hose.
  19. Remove the plug from the power conversion system coolant supply fitting, immediately connect the power conversion system flush adapter to the fitting, and then perform Push-Pull-Push test of the fittings.
  20. Connect the coolant cart flush hose to the coolant cart regulator and the PCS flush adpater.
  21. Make sure that the coolant cart regulator valve is in the closed (vertical) position.
  22. Connect the coolant cart flush hose to the power conversion system flush adapter.
    Note
    Verify regulator valve is closed, Pressure regulator is not adjustable (set at 20 psi).
  23. Make sure that the power conversion system drain adapter valve is in the closed (perpendicular to adapter) position.
  24. Remove the plug from the power conversion system coolant return to LH sill hose fitting, immediately connect the power conversion system drain adapter to the fitting, and then perform a Push-Pull_Push test of the fittings.
  25. Connect the coolant cart drain hose to the coolant drain container.
  26. Connect the coolant cart drain hose to the power conversion system drain adapter.
  27. Turn the valve on the power conversion system drain adapter to the open (parallel to adapter) position.
  28. Connect the supply air hose to the coolant cart supply air connector.
  29. Slowly turn the pressure regulator valve to the open (horizontal) position, and allow coolant to drain out of the power conversion system.
  30. After the coolant has drained, turn the pressure regulator valve to the closed (vertical) position.
  31. Disconnect the supply air hose from the coolant cart supply air connector.
  32. Turn the valve on the power conversion system drain adapter to the closed (perpendicular to adapter) position.
  33. Remove the coolant cart drain hose from the power conversion system drain adapter.
  34. Remove the coolant cart drain hose from the coolant drain container.
  35. Release the clip, and then disconnect the power conversion system drain adapter from the power conversion system coolant return to LH sill hose fitting.
  36. Disconnect the coolant cart flush hose from the power conversion system flush adapter.
  37. Disconnect the coolant cart flush hose from the coolant cart regulator.
  38. Release the clip, and then disconnect the power conversion system flush adapter from the power conversion system coolant supply fitting.
  39. Remove the plugs and attach the battery flush adapter to the HV battery hose coupling, verify it is fully seated, and perform a push-pull-push test.
  40. Attach the coolant cart flush hose to the battery flush adapter, then verify that the regulator valve is closed and the pressure regulator is not adjustable (set at 20 psi).
    Note
    Hose is still attached to the cart at this point.
  41. Remove the plugs, attach the P2 battery drain adapter to the HV battery hose coupling, and perform a push-pull-push test.
    Note
    Verify the valve is closed.
  42. Secure the coolant cart drain hose and coolant drain container to the P2 battery drain adapter.
  43. Open the valve on the P2 battery drain adapter.
  44. Slowly open the valve on the pressure regulator and allow the coolant to drain out of the HV battery.
  45. After the coolant has drained, close the valve on the pressure regulator.
  46. Disconnect the compressed air from the coolant pressure tester.
  47. Close the valve on the P2 battery drain adapter.
  48. Remove the cart drain hose from the P2 battery drain adapter and the coolant drain container.
  49. Remove the P2 battery drain adapter from the HV battery.
  50. Remove the cart flush hose from the battery flush coolant adapter and the cart.
  51. Remove the battery flush coolant adapter from the HV battery.
  52. Position the coolant drain collector under the front of the vehicle to catch the vehicle coolant.
  53. Remove the plugs from both fittings and immediately connect the power conversion system coolant return to LH sill hose to the LH sill hose, fasten the clip, and perform a Push-Pull-Push check of the fittings.
  54. Fasten the clips (x2) that attach the power conversion system coolant return to LH sill hose to the body.
  55. Place foldable funnel and absorbent material under the PCS hose.
    Note
    For Plaid vehicles only: Place funnel and absorbent material underneath the PCS coolant hose as there is another hose to release.
  56. For Plaid vehicles only:Remove the plugs, secure the rear drive unit branch of the power conversion system coolant return hose to the coolant return hose, and perform a push-pull-push test.
  57. Remove the foldable funnel and absorbent material from underneath the PCS hose.
  58. Return the LH front wheel arch liner to the LH front wheel arch, and then fasten the clips (x2) that attach the liner to the wheel arch.
  59. Remove the plugs from both fittings and immediately connect the power conversion system coolant supply hose to the HV battery, fasten the clip, and perform a Push-Pull-Push check of the fittings.
  60. Remove the plugs from both fittings and immediately connect the HV battery coolant supply hose to the HV battery, fasten the clip, and perform a Push-Pull-Push check of the fittings.
  61. Remove the plugs from both fittings and immediately connect the 3 way valve to HV battery hose to the HV battery, fasten the clip, and perform a Push-Pull-Push check of the fittings.
  62. Remove the coolant drain collector out from under the vehicle.
  63. Install the front skid plate. See Skid Plate - HV Battery - Front (Remove and Replace).
  64. Install the front aero shield panel. See Panel - Aero Shield - Front (Remove and Replace).
  65. Perform a vacuum refill of the cooling system. See Cooling System (Vacuum Refill).
    Note
    After performing the Stop Thermal Fill/Drain routine, touch Thermal > Coolant System > Pump Identification and tap Run to perform the coolant pump identification. Then return to the cooling system vacuum refill procedure to perform the thermal coolant air purge and the remaining steps.
  66. Raise the LH front window and close the LH front door.
  67. Lower the vehicle.