25/05/2023 12:52:19

Platter Enclosure Coolant (Drain)

Correction code NOTE: Unless otherwise explicitly stated in the procedure, the above correction code and FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. To provide feedback on FRT values, email LaborTimeFeedback@tesla.com. NOTE: See Personal Protection to make sure proper PPE is worn when performing the below procedure.

  • 2023-05-25: Added note that coolant cart pressure regulator is fixed at 20 psi.
Warning IconA warning icon, calling your attention to a possibly risky situation
Warning
This procedure is a DRAFT, although it has been validated. Warnings and Cautions might be missing. Follow safety requirements and use extreme caution when working on or near high voltage systems and components. Provide corrections and feedback to ServiceDevelopment@teslamotors.com.

Procedure

  1. Disconnect LV power. See LV Power (Disconnect and Connect).
  2. Raise the vehicle. See Raise Vehicle - 2 Post Lift.
  3. Remove the front aero shield panel. See Panel - Aero Shield - Front (Remove and Replace).
  4. Remove the front skid plate. See Skidplate - Front (Remove and Replace).
  5. Pull the red locking tab out, and then pull the tab again to disconnect the electrical harness from the HV battery logic connector.
  6. Pull the red locking tab out, and then disconnect the electrical harness from the HV battery LV connector.
  7. Position a coolant drain collector under the front of the vehicle to catch the vehicle coolant.
  8. Release the clip and disconnect the 3 way valve to HV battery hose from the HV battery, and then immediately plug the fittings.
  9. Release the clip and disconnect the HV battery coolant supply hose from the HV battery, and then immediately plug the fittings.
  10. Remove the plug from the HV battery coolant supply fitting (left), immediately connect the battery flush adapter to the fitting, and then perform a Push-Pull_Push test of the fittings.
  11. Connect the coolant cart flush hose to the coolant cart regulator.
  12. Make sure that the coolant cart regulator valve is in the closed (vertical) position.
  13. Connect the coolant cart flush hose to the battery flush adapter.
  14. Make sure that the P2 battery drain adapter valve is in the closed (perpendicular to adapter) position.
  15. Remove the plug from the HV battery coolant return fitting (right), immediately connect the P2 battery drain adapter to the fitting, and then perform a Push-Pull_Push test of the fittings.
  16. Connect the coolant cart drain hose to the coolant drain container.
  17. Connect the coolant cart drain hose to the P2 battery drain adapter.
  18. Turn the valve on the P2 battery drain adapter to the open (parallel to adapter) position.
  19. Connect the supply air hose to the coolant cart supply air connector.
    Informational PurposesAn informational icon, calling your attention
    Note
    The pressure regulator is fixed at 20 psi.
  20. Slowly turn the pressure regulator valve to the open (horziontal) position, and allow coolant to drain out of the HV battery enclosure.
  21. After the coolant has drained, turn the pressure regulator valve to the closed (vertical) postioin.
  22. Disconnect the supply air hose from the coolant cart supply air connector.
  23. Turn the valve on the P2 battery drain adapter to the closed (perpendicular to adapter) position.
  24. Remove the coolant cart drain hose from the P2 battery drain adapter.
  25. Remove the coolant cart drain hose from the coolant drain container.
  26. Release the clip, and then disconnect the P2 battery drain adapter from the HV battery coolant return fitting (right).
  27. Disconnect the coolant cart flush hose from the battery flush adapter.
  28. Disconnect the coolant cart flush hose from the coolant cart regulator.
  29. Release the clip, and then disconnect the battery flush adapter from the HV battery coolant supply fitting (left).
    Informational PurposesAn informational icon, calling your attention
    Note
    1x spring clip.
  30. Remove the plugs from both fittings and immediately connect the HV battery coolant supply hose to the HV battery, fasten the clip, and perform a Push-Pull-Push check of the fittings.
  31. Remove the plugs from both fittings and immediately connect the 3 way valve to HV battery hose to the HV battery, fasten the clip, and perform a Push-Pull-Push check of the fittings.
  32. Remove the coolant drain collector out from under the vehicle.
  33. Connect the electrical harness to the HV battery LV connector, and then push the red locking tab in.
  34. Connect the electrical harness to the HV battery logic connector, and then push the red locking tab in.
  35. Install the front skid plate. See Skidplate - Front (Remove and Replace).
  36. Install the front aero shield panel. See Panel - Aero Shield - Front (Remove and Replace).
  37. Connect LV power. See LV Power (Disconnect and Connect).
  38. Remove the vehicle from the lift. See Raise Vehicle - 2 Post Lift.