Busbars - Charge Port to HV Battery (Remove and Replace)
Correction code 44013102 0.84 NOTE: Unless otherwise explicitly stated in the procedure, the above correction code and FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so.NOTE: See Flat Rate Times to learn more about FRTs and how they are created. To provide feedback on FRT values, email LaborTimeFeedback@tesla.com. NOTE: See Personal Protection to make sure wearing proper PPE when performing the below procedure.
- 1076921-00-A Insulation Multimeter, Fluke 1587 (EMEA)
- 1076921-01-B Insulation Multimeter, Fluke 1508 (APAC)
- 1130480-00-A Test Probes, Slim, Fluke TP38
Only technicians who have been trained in High Voltage Awareness and have completed all required certification courses (if applicable) are permitted to perform this procedure. Proper personal protective equipment (PPE) and insulating HV gloves with a minimum rating of class 0 (1000V) must be worn at all times a high voltage cable, busbar, or fitting is handled. Refer to Tech Note TN-15-92-003, High Voltage Awareness Care Points
for additional safety information.
Remove all jewelry (watches, bracelets, rings, necklaces, earrings, ID tags, piercings, etc.) from your person, and all objects (keys, coins, pens, pencils, tools, fasteners, etc.) from your pockets before performing any procedure that exposes you to high voltage.
Proper Personal Protective Equipment (PPE) is required to perform this procedure:
- High Voltage (HV) insulating gloves
- Leather glove protectors
- High voltage glove tester
- Safety glasses
- Electrical hazard rated safety shoes
A glove inflator is the only recommended way to test HV gloves. Both HV gloves must pass testing before beginning this procedure. If either glove does not pass the air check, discard the pair.
- North America: HV gloves can be used up to 12 months after the testing date printed on the glove, but only 6 months after first use even if the gloves are still within the 12 month period. If the gloves were not put into service during the 12-month period following the testing date, they must be retested before being put into service.
- Europe: Class 0 (1000V) HV gloves have no expiration date and may be used if they pass the pre-use assessment and the periodic inspection.
- Asia Pacific: Follow the expiration date stated by the HV glove manufacturer, and:
- o China only: Test the gloves every 6 months according to GB/T 17622.
Torque Specifications
Description | Torque Value | Recommended Tools | Reuse/Replace | Notes |
---|---|---|---|---|
Busbar to charge port nut |
|
|
Reuse | |
Busbar access door bolt |
|
|
Reuse | |
Busbar to ancillary bay HV header bolt |
|
|
Reuse | |
Busbar studs at the back of the charge port |
|
|
N/A | Perform a torque check on the studs |
Edge support bracket bolt |
|
|
Reuse |
Remove
- Perform a charge port voltage check. See Charge Port Voltage Check.
- Remove the LH trunk side trim. See Trim - Side - Trunk - LH (Remove and Replace).
-
Release the locking tabs
from the charge port low voltage connectors (x2), and then disconnect the
connectors (x2) from the charge port.
CAUTIONDO NOT push down on the red locking tab. Pull the tab away from the connector until the connector is unlocked, and then continue pulling to release the connector.Tip: Gently lift the black connector tab in order to remove the white locking tab from the 12-pin low voltage connector.
- Release the clip that attaches the low voltage electrical harness to the charge port busbar.
- Remove the charge port busbar fastener cover from the charge port assembly.
-
Remove the nuts that attach
the charge port busbars to the charge port.
Tip: Use of the following tool(s) is recommended:
- 10 mm deep socket
- ¼ in std flex head ratchet
- ¼ in torque wrench (installation only)
-
Remove the bolts (x2) and
clip that attach the edge support bracket to the vehicle, and then remove
the bracket from the vehicle.
Tip: Use of the following tool(s) is recommended:
- 10 mm socket
- 4 in extension
- Ratchet/torque wrench
- Remove the clips (x6) that attach the low voltage electrical harness to the vehicle, and then set the harness aside.
-
Remove the bolt that closes the charge port busbar access door at the ancillary bay HV header, and then open the access door.
Tip: Use of the following tool(s) is recommended:
- 10 mm deep socket
- ¼ in std flex head ratchet
- ¼ in torque wrench (installation only)
-
Remove the bolts (x2) that attach the charge port busbars to the HV header at the ancillary bay.
Tip: Use of the following tool(s) is recommended:
- 10 mm deep socket
- ¼ in std flex head ratchet
- ¼ in torque wrench (installation only)
-
With assistance, lift the
charge port busbars away from the HV header, and then carefully maneuver the
busbars through the low voltage harness and out of the trunk.
Tip: Wiggle the connector housing to aid with removal.
-
Remove the foam block from the busbar assembly.
NoteNote where the foam block is mounted before removing it.
Install
- Perform a zero adjust of the Hioki resistance meter in preparation to measure resistances later in this procedure. See Resistance Meter (Zero Adjust).
- Install the foam block on the busbar assembly.
- Clean the charge port busbar HV header at the ancillary bay with an IPA wipe, and allow to dry for 1 minute.
-
Clean the charge port busbar HV header at the back of the charge port assembly with an IPA wipe, and allow to dry for 1 minute.
NoteSkip this step if installing a new charge port assembly, as the new charge port has pre-applied electrical joint compound.Tip: Use a plastic trim tool to push the IPA wipe into the crevices of the charge port busbar HV header.
-
Perform a torque check on
the busbar studs on the back of the charge port.NoteSkip this step if installing a new charge port assembly.Tip: Use of the following tool(s) is recommended:
- Torx T10 bit
- Ratchet/torque wrench
- 4 in extension
-
Apply one drop of electrical joint compound on each of the charge port busbar HV header contacts (x2) at the ancillary bay.
NoteSkip this step if installing a new charge port busbar, as the new busbar has pre-applied electrical joint compound.
- If reinstalling the same busbar: Remove all residue/debris from the mating surfaces of both ends of the busbar using an IPA wipe.
-
With assistance, position the charge port busbars in the vehicle.
NoteManeuver the busbars into the vehicle through the trunk.Tip: Shift the rear end of the busbars upward to aid with installation.
-
With assistance, align the guide tabs on the HV header with the charge port busbar connector, and then install the busbar connector on the HV header.
Tip: Gently lift the rear half of the busbars to aid installation of the busbars on the HV header.NoteIf positioning the busbars requires excessive force, the busbars might be bent. Inspect for damage and replace the busbars if necessary.
-
Install the bolts (x2) that
attach the charge port busbars to the HV header at the ancillary bay.Tip: Use of the following tool(s) is recommended:
- 10 mm deep socket
- ¼ in std flex head ratchet
- ¼ in torque wrench (installation only)
- Install the clips (x6) that attach the low voltage electrical harness to the vehicle.
-
Position the edge support
bracket on the vehicle, and then install the bolts (x2) and clip that attach
the bracket to the vehicle.Tip: Use of the following tool(s) is recommended:
- 10 mm socket
- 4 in extension
- Ratchet/torque wrench
-
Apply two drops of
electrical joint compound on each of the charge port busbar leads (x2), on
the side that makes contact with the charge port.
NoteSkip this step if installing a new charge port assembly, as the new charge port has pre-applied electrical joint compound.NoteMake sure the contact surfaces are completely covered with electrical joint compound.
-
Position the charge port
busbars on the charge port, and then install the nuts that attach the
busbars to the charge port.NoteIf positioning the busbars requires excessive force, the busbars might be bent. Inspect for damage and replace the busbars if necessary.Tip: Use of the following tool(s) is recommended:
- 10 mm deep socket
- ¼ in std flex head ratchet
- ¼ in torque wrench (installation only)
- Put on HV insulating gloves and leather over gloves.
-
At the charge port, use the Hioki resistance meter to measure the
resistance between the charge port busbar lead and the charge port busbar
stud. Also perform this test on the other lead and stud.
NoteThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.270 mΩ (270 μΩ). If the measured resistance is above 270 mΩ (270 μΩ), escalate a Toolbox session, as appropriate.NoteIf the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again. If after 4 attempts the resistance is consistently lower than 0.050 mΩ (50 μΩ), the test has passed; continue to the next step.
-
At the ancillary bay, use the Hioki resistance meter to measure the resistance
between the charge port busbar lead and the ancillary bay HV header bolt head.
Also perform this test on the other lead and bolt head.
NoteThe acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ). If the measured resistance is above 0.195 mΩ (195 μΩ), escalate a Toolbox session, as appropriate.NoteIf the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again. If after 4 attempts the resistance is consistently lower than 0.050 mΩ (50 μΩ), the test has passed; continue to the next step.
- Remove the HV insulating gloves and leather over gloves.
-
Close the charge port busbar
access door, and then install the bolt that locks the access door in
position.Tip: Use of the following tool(s) is recommended:
- 10 mm deep socket
- ¼ in std flex head ratchet
- ¼ in torque wrench (installation only)
-
Install the charge port busbar fastener cover on the charge port assembly.
NoteThe charge port busbar fastener cover will not be secure until the next step is performed.
-
Connect the low voltage harness connectors (x2) on the charge port, and then install the locking tabs (x2) that secure the connectors.
NotePush the red locking tab into the connector to engage the connector lock.Tip: Carefully insert the white locking tab in the 12-pin low voltage connector until it locks with the black connector tab.
- Reconnect 12V power. See 12V/LV Power (Disconnect and Connect).
- Install the LH trunk side trim. See Trim - Side - Trunk - LH (Remove and Replace).
- Place the driver and front passenger seats back to their previous positions.