02/04/2024 19:40:55
NVH Pad - IP Carrier (Remove and Replace)
Correction code 1405010092 FRT 0.90 NOTE: Unless otherwise explicitly stated in the procedure, the above correction code and FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. To provide feedback on FRT values, email LaborTimeFeedback@tesla.com. NOTE: See Personal Protection to make sure wearing proper PPE when performing the below procedure.
- 2024-04-03: Updated the reference topic.
Remove
- Remove the IP carrier. See IP Carrier (Remove and Install).
-
Peel the instrument panel
NVH pad from the instrument panel carrier.
WarningThe video(s) included in this procedure are meant as an overview for supplemental purposes only. Follow all of the steps listed in the procedure to avoid damage to components and/or personal injury.
Install
- Install the instrument panel NVH pad from the instrument panel carrier.
- Install the IP carrier. See IP Carrier (Remove and Install).