14/12/2023 18:51:24
Hose - Inlet - Power Conversion System (Remove and Replace)
Correction code 1630010132 FRT 2.76 NOTE: Unless otherwise explicitly stated in the procedure, the above correction code and FRT reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. To provide feedback on FRT values, email LaborTimeFeedback@tesla.com. NOTE: See Personal Protection to make sure wearing proper PPE when performing the below procedure.
Remove
- Remove the postie DC link from ancillary bay. See Busbar - Fast Charge Contactor to DC Bus - Positive (Remove and Replace).
-
Release PCS coolant inlet hose from
hose clip.
-
Cut 90 degree portion of Model 3 coolant hose special tool to 2CM long.
-
Cut protrusion on the ancillary bay harness base.
-
Disconnect PCS coolant inlet hose from ancillary bay.
Install
-
Connect PCS coolant inlet hose to
ancillary bay.
-
Secure PCS coolant inlet hose to hose
clip.
- Install the postie DC link to ancillary bay. See Busbar - Fast Charge Contactor to DC Bus - Positive (Remove and Replace).