2025-09-11

Box - Air Distribution - HVAC (Model YL) (Remove and Replace)

Correction code 18101601002 FRT 1.20 NOTE: Unless otherwise explicitly stated in the procedure, the correction code and FRT listed above reflect all of the work required to perform this procedure, including the linked procedures. Do not stack correction codes unless explicitly told to do so. NOTE: See Flat Rate Times to learn more about FRTs and how they are created. NOTE: See Personal Protection to make sure you are wearing proper PPE when performing the procedure below. NOTE: See Ergonomic Precautions for safe and healthy working practices.

Remove

  1. Remove the 3rd row head duct. See Duct - Head - 3rd Row (Model YL) (Remove and Replace).
  2. Release the B-pillar A section ducts from both sides.
    Informational PurposesAn informational icon, calling your attention
    Note
    Gently lift and shake the ducts to assist in releasing.
  3. Disconnect the 320 DEG actuator connector.
  4. Release the clips (x3) to remove the HVAC air distribution box assembly.

Install

  1. Secure the clips (x3) to install the HVAC air distribution box assembly.
  2. Connect the 320 DEG actuator connector.
  3. Install the B-pillar A section ducts to both sides.
    Informational PurposesAn informational icon, calling your attention
    Note
    Gently lift and shake the ducts to assist in installing.
  4. Install the 3rd row head duct. See Duct - Head - 3rd Row (Model YL) (Remove and Replace).