Luftlekkasjetest på tilleggsbrønn (strukturell pakke)
Korrigeringskode
16100420 0.55
MERK: Hvis ikke noe annet er uttrykkelig oppgitt i prosedyren, gjenspeiler korrigeringskoden og FRT ovenfor, alt arbeidet som kreves for å gjennomføre denne prosedyren, inkludert de tilknyttede prosedyrene. Ikke stable korrigeringskoder med mindre du bli uttrykkelig bedt om det.
MERK: Se Flat rate-tider for å lære mer om FRT-er og hvordan de lages. Hvis du vil gi tilbakemelding om FRT-verdier, kan du sende en e-post til ServiceManualFeedback@tesla.com.
MERK: Se Personlig beskyttelse for å forsikre deg om at du bruker riktig PVU når du gjennomfører prosedyren nedenfor.
- 2025-09-05: Cleaned up procedure and removed redundant illustration.
Procedure
- Open all doors and lower the windows.
- Open the hood.
-
Remove the rear apron.
Merk14x clips
- Remove the bolt that attaches the underhood storage unit to the washer fluid reservoir neck.
- Remove the HEPA filter assembly. See Enhet – filter – HEPA (fjerne og skifte ut)
- Move LH front seat forward
- Move RH front seat forward
- Disconnect LV power. See 12 V-/lavspenningsstrøm (koble fra og koble til)
- Perform the vehicle HV disablement procedure. See Deaktiveringsprosedyre for bilens høyspenning (Strukturell pakke)
- Remove the push clips at the left and right wheel house liner to mid aero shield.
- Lower the vehicle until the tires are touching the floor.
- If present, cut away the insulation that covers the pyro cover.
- Remove and discard the breather from the pyro cover.
- Install the air splitter hose onto the pyro cover.
- Connect the regulator to air supply.
- Turn the right side regulator valve to the open position.
- Set the regulator to 0.3 psi.
-
Open the left side regulator valve to inject air into the ancillary bay.
MerkAllow 30 seconds fill time. Close the right side regulator valve when the pressure reaches 0.3 psi.
- Wait 15 seconds for the pressure to settle.
- Record the value of the starting pressure.
- Wait 30 seconds to test pressure.
-
Record the value of the end pressure.
MerkSubtract ending pressure from starting pressure. If the difference is greater than 0.0484 psi, then inspect the tools and retest. If the difference is still greater than 0.0484 psi, then proceed to the Combined Platter and Ancillary Bay leak down test. If difference is 0.0484 psi or less, then proceed with the current procedure.
- Disconnect air supply from regulator tool
- Install a new breather onto the pyro cover.
- Raise the vehicle.
-
Connect the RDU HV harness to the HV battery.
MerkVerify lever is in the upright and open position. Carefully seat the connector and allow the lever to engage. Fully secure the lever and make sure that the red tab is locked.
-
Install the mid aero shield.
Merk11x bolts, 10mm, 5 Nm. Model Y Structural Pack will have one less bolt and one extra clip.
- Install the push clips (x2) at the left and right wheel house liner to the mid aero shield.
- Connect LV power. See 12 V-/lavspenningsstrøm (koble fra og koble til)
- Install the HEPA filter assembly. See Enhet – filter – HEPA (fjerne og skifte ut)
-
Attach the washer tank neck onto the washer tank.
Merk1x O-ring. Make sure that the washer hose is properly routed.
-
Install the bolt that attaches the underhood storage unit to the washer fluid reservoir neck.5 Nm (3.7 lbs-ft)
- Install the rear apron.
- Close the hood.
-
Install the 2nd row seat cushion.
Merk1x connector. Slide the rear cushion rearward, then align foam with the seat rail. Make sure that the cushion is fully seated with push & pull test.
- Move LH and RH front seats to their original position.