10/12/2024 07:01:19
HV Battery Revision -F to Revision -H (Retrofit)
참고: 절차에서 명시적으로 언급하지 않는 한 위 교정 코드 및 FRT는 연결된 절차를 포함하여 이 절차를 수행하는 데 필요한 모든 작업을 반영합니다. 명시적으로 지시하지 않는 한 교정 코드를 누적하지 마십시오. 참고: FRT와 그 생성 방법에 대한 자세한 내용은 표준 정비 작업시간을 참조하십시오. FRT 값에 대한 피드백을 제공하려면 LaborTimeFeedback@tesla.com으로 이메일을 보내십시오. 참고: 아래 절차를 수행할 때 개인 보호을(를) 참조하여 적절한 PPE를 착용했는지 확인하십시오.
참고
This procedure applies to 2021+ Model S vehicles built before August 15, 2022, and
2021+ Model S vehicles built from August 15, 2022 to September 29, 2022.
Consumables required:
- 1896854-S0-A: 3 PHASE HEADER PLATE - (1)
- 1086834-00-A: 3M Impact Resistant Structural Adhesive, 200 mL Cartridge, 07333 - (1)
- 1457828-00-A: 3M Manual Cartridge Applicator Gun (200 mL), 08571 - (1)
- 1111111-00-H: ASY,HV BATTERY,P2,MSX ROW PACK (3PHASE) - (1)
- 1019168-00-A: Electrical Joint Compound,Penetrox A-13 - (1)
- 1567101-20-A: HVCON,HEADER,0DEG,DU,SX,P2 - (1)
- 1567101-10-A: HVCON,HEADER,90DEG,DU,SX,P2 - (2)
- 1588001-00-A: HVCON,PLG,6P,ASY,JUMPER,SX,P2 - (1)
- 1054785-00-A: Shop Supply, Primer (Grey) - (1)
- 000-0474-001: THREADLOCKER, LOCTITE 222, PURPLE - (1)
- 2023-05-22: Added note to cut inside the taped template.
경고
유럽만 해당: 디이소시아네이트 작업에 대한 훈련을 받고 모든 필수 인증 과정을 완료한 기술자만이 우레탄 및 디이소시아네이트가 포함된 기타 제품을 사용하는 절차를 수행할 수 있습니다. 디이소시아네이트가 함유된 제품으로 작업할 때는 적절한 개인 보호 장비(PPE)를 착용해야 합니다.
Procedure
중요사항: Rework vehicle will
need 24 hours to fully cure. Do not move rework vehicle during curing.
-
Ask the customer to remove all
personal belongings from the vehicle before proceeding.
경고Debris from the rework will damage items left inside vehicle.
-
Cover all neighboring vehicles.
경고Debris from rework will damage paint on any surrounding vehicles.
-
Spray primer onto the 3 phase header
plate. If the plate is already e-coated, skip this step.
경고Make sure to wear the proper PPE for using aerosol cans.경고Do not breathe in fumes.경고Use a cardboard box to prevent overspray onto other vehicles.
- Open all the doors and lower the LH front window.
- Remove the LH and RH rocker panel moldings. See 몰딩 - 로커 패널 - LH(탈거 및 교체).
- Remove the LH and RH 2nd row seat outer bolsters. See 볼스터 - 외측 - 시트 - 2열 - LH(탈거 및 교체).
-
Wrap the LH 2nd row seatback, tuck the
LH 2nd row seat belt behind the seat back, and move the seat back to the upright
position.
참고Do not cover the latch.참고The wrap will protect the interior components from debris.
-
Wrap the RH 2nd row seatback, tuck the
RH 2nd row seat belt behind the seat back, and then move the seat back to the upright
position.
참고Do not cover the latch.참고The wrap will protect the interior components from debris.
-
Position the 2 post lift pads for HV
battery removal.
-
정비 모드 또는 Toolbox를 사용하여 다음 루틴을 수행합니다(참조 항목: 0005 - 정비 모드):
PROC_VCFRONT_X_START-THERMAL-FILL-DRAIN-COOLANTvia Toolbox: (link)via Service Mode Plus:
- Drive Inverter ➜ Front Drive Inverter Replacement ➜ Start Fluid Fill/Drain
- Drive Inverter ➜ Rear Drive Inverter Replacement ➜ Start Fluid Fill/Drain
- Drive Inverter ➜ Rear Left Drive Inverter Replacement ➜ Start Fluid Fill/Drain
- Drive Inverter ➜ Rear Right Drive Inverter Replacement ➜ Start Fluid Fill/Drain
- Drive Unit ➜ Front Drive Unit Replacement ➜ Start Coolant Fill/Drain
- Drive Unit ➜ Rear Drive Unit Replacement ➜ Start Coolant Fill/Drain
참고A window displaying will appear.참고Verify the coolant status is green for "Ready for Fill/Drain".참고The routine has a 5 hour limit. After 5 hours, the routine must be performed again.참고Touch the X in the top left of the window to close once the routine is completed. - Move the driver seat fully forward.
- Move the front passenger seat fully rearward.
- Remove the rear underhood apron. See 후드 내 에이프런 - 후면(탈거 및 교체).
- LV 전원을 연결 해제합니다. 참조 항목: LV 전원(연결 해제 및 연결).
- 차량 HV 비활성화 절차를 수행합니다. 참조 항목: 차량 HV 비활성화 절차.
- Remove leather glove protectors and HV insulating gloves.
- Lower the vehicle until the tires are touching the ground.
- Remove the 2nd row lower seat cushion. See 시트 쿠션 - 하단 - 2열(탈거 및 교체).
-
Remove the DC input HV header foam
block.
-
Remove the bolt that secures the
charge port busbar connector access door.팁: 다음 공구 사용을 권장합니다.
- 10mm 소켓
-
Remove the bolts (x2) that attach the
charge port busbar connector to the DC input HV header.팁: 다음 공구 사용을 권장합니다.
- 10mm 소켓
-
Lift the charge port busbar connector
to remove the connector from the DC input HV header.
- Remove the LH and RH rear subframe shear plates. See 시어 플레이트 - 후면 서브프레임 - LH(탈거 및 교체).
-
Slide the red connector locking tab,
open the black release lever, and then disconnect the rear drive unit HV harness from
the HV battery RH HV header.
- Remove the front aero shield panel. See 패널 - 에어로 실드 - 전면(탈거 및 교체).
- Remove the front skid plate. See 스키드 플레이트 - 전면(탈거 및 교체).
-
Release the locking tab, and then
disconnect the logic connector to the HV battery.
-
Release the locking tab, and then
disconnect the power connector to the HV battery.
- Position a coolant drain collector under the front of the vehicle to catch the vehicle coolant.
-
Release the clip and disconnect the 3
way valve to HV battery hose from the HV battery, and then immediately plug the
fittings.
-
Release the clip and disconnect the HV
battery coolant supply hose from the HV battery, and then immediately plug the
fittings.
-
Release the clip and disconnect the
power conversion system coolant supply hose from the HV battery, and then immediately
plug the fittings.
-
Release the clips (x2) on the LH front
wheel arch liner, and then move the liner aside for access.
-
Release the clips (x2) that attach the
power conversion system coolant return to LH sill hose to the body.
-
Release the clip and disconnect the
power conversion system coolant return to LH sill hose from the LH sill hose, and then
immediately plug the fittings.
-
Plaid vehicles only - Place a
foldable funnel and absorbent material over the HV harness connectors and under the
power conversion system coolant return hose to direct coolant away from the HV
battery.
-
Plaid vehicles only - Release the
clip, disconnect the rear drive unit branch of the power conversion system coolant
return hose from the coolant return hose, and then immediately plug both fittings.
-
Plaid vehicles only - Remove the
foldable funnel and absorbent material from under the power conversion system coolant
return hose.
-
Remove the bolt that attaches the
ground strap to the body, and then remove the ground strap from the body.팁: 다음 공구 사용을 권장합니다.
- 10mm 소켓
- Remove coolant drain collector out from underneath the vehicle.
-
Remove the bolt that attaches the
front drive unit HV harness to the HV battery.팁: 다음 공구 사용을 권장합니다.
- 8mm 소켓
-
Slide the red connector locking tab,
open the black release lever, and then disconnect the front drive unit HV harness from
the HV battery front drive unit HV header.
-
Slide the red connector locking tab,
open the black release lever, and then disconnect the compressor HV harness from the HV
battery compressor HV header.
-
First loosen with a ratchet, and then
use a power tool to remove the center bolts (x4) securing the HV battery.팁: 다음 공구 사용을 권장합니다.
- External Torx Plus EP16
-
Position the battery table underneath
the vehicle.
-
With assistance, align the table to
the vehicle, and then lower the vehicle to the table.
참고Adjust casters to level table if necessary.
-
First loosen with a ratchet, and then
use a power tool to remove the outer center bolts (x4) that attach the HV battery to the
vehicle.팁: 다음 공구 사용을 권장합니다.
- 외부 Torx Plus EP14
-
First loosen with a ratchet, and then
use a power tool to remove the outer bolts (x12) that attach the HV battery to the
vehicle.팁: 다음 공구 사용을 권장합니다.
- External Torx Plus EP16
-
First loosen with a ratchet, and then
use a power tool to remove the LH rocker panel bolts (x8) that attach the HV battery to
the vehicle.팁: 다음 공구 사용을 권장합니다.
- 15mm 소켓
-
First loosen with a ratchet, and then
use a power tool to remove the RH rocker panel bolts (x8) that attach the HV battery to
the vehicle.팁: 다음 공구 사용을 권장합니다.
- 15mm 소켓
-
Raise the vehicle off of the HV
battery.
-
With the help of an assistant, move
the HV battery and table away from the vehicle.
참고Battery will be moved to shipping container at a later step. Proceed with the rework steps to allow required curing time.
- Lower the vehicle until the tires are touching the ground.
-
Release the clips (x2) that attach the
LH 2nd row buckle harness to the body.
-
Release the LH side of the front motor
bay insulator from underneath the charge port busbar.
-
Wrap the rear half of cabin across the
B-pillars.
-
Wrap the cabin carpet.
참고Secure with tape as needed.
-
Wrap the rear half of the cabin across
the C-pillars.
-
Wrap the LH and RH lower C-pillar
trims.
-
Wrap the top of the rear half of the
cabin.
-
Cut a cardboard box to fit the rework
area.
참고The box needs to fit inside the 2nd row floor panel. The box will act as a shield and prevent debris from spreading.
-
Install the cardboard box onto the 2nd
row floor panel.
참고Secure the insulator away from the panel.
-
Position a section of the cardboard
over the body harness.
참고The section will guard the harness from the cut-off tool.
-
Position the 3 phase header plate onto
the 2nd row floor panel.
참고Note the plate placement on the floor panel.
-
Apply masking tape to the floor panel
on the LH and RH side of the 3 phase header plate to mark the position.
참고Do not tape the header plate to the floor panel.
-
Remove the 3 phase header plate from
the 2nd row floor panel.
-
Apply masking tape 1 inch
inward of the 3 phase header plate placement.
-
Apply masking tape along the 2nd row
floor panel seams.
경고Apply the tape inside the front seam and outside the rear seam.경고Reference the image closely to avoid cutting into incorrect panel.
-
Drill 4 holes into the 2nd row floor
panel.
경고Make sure to wear proper PPE for drilling.경고Drill inside the templated corners.
-
Vacuum all debris produced by the
drill.
-
Connect shop air to the cut-off
tool.
-
Use the cutting tool to cut a square
out of the 2nd row floor panel along the inside of the masking tape template, and
then discard the cutout after removal.
경고DO NOT cut the extruded aluminum.경고Only cut the area inside the taped section.경고Make sure to wear proper PPE for cutting.경고Do not breathe in fumes.
-
Vacuum all debris produced by the
cut-off tool.
-
Remove the front tape from 3 phase
header plate template.
-
Drill 2 holes into the 2nd row floor
panel inside and mid-level with rivets.
경고Make sure to wear proper PPE for cutting.경고Do not drill out rivets.
-
Vacuum all debris produced by the
drill.
-
Apply masking tape along outside edge
of the drilled holes.
-
Cut a rectangle out of the 2nd row
floor panel.
경고Make sure to wear proper PPE for cutting.경고Do not breathe in fumes.경고Do not drill the rivets.경고Only cut inside and mid-level with the rivets. Discard rectangle after removal.
-
Vacuum all debris produced by the
cut-off tool.
-
Remove the masking tape, position the
3 phase header plate onto the floor panel, reapply masking tape on the outside of the
header plate to create a new template, and then remove the header plate from the floor
panel.
-
Use a heat gun to heat the NVH
material inside the 3 phase header plate template on the floor panel, and then use a
scraper to remove the material from the floor panel.
-
Use IPA wipes to clean the 2nd row
floor panel mating surface.
참고Allow 1 minute of dry time.
-
Prepare a caulking gun and structural
adhesive.
-
Apply structural adhesive onto the 2nd
row floor panel along the inside of the template, and then spread the adhesive evenly
with a brush.
-
Install the 3 phase header plate onto
the 2nd row floor panel.
참고Apply equal pressure and ensure the panel and plate are flush.
-
Remove the masking tape from the 2nd
row floor panel.
-
Apply cardboard over the 3 phase
header plate edges.
참고This will protect sand bag from adhesive squeeze out.
-
Position a sand bag onto the 3 phase
header plate.
참고Make sure the weight is evenly distributed and holding the plate down.중요사항: Allow 24hr for adhesive to fully cure. Any movement before curing will compromise adhesion.
-
Raise the vehicle fully and lower lift
onto locks.
참고Set the vehicle to comfortable working height. Make sure there is an audible click from the locks on both sides before lowering, otherwise the vehicle may tilt to the side.
-
Apply structural adhesive underneath
the 2nd row floor panel, and then spread the adhesive evenly with a brush.
경고Avoid dripping adhesive onto skin or hair.중요사항: Allow 24hr for adhesive to fully cure. Any movement before curing will compromise adhesion.
- Lower vehicle until the tires are touching the ground.
- Perform a power conversion system coolant drain on the old HV battery. See 전력 변환 시스템(PCS) 냉각수(배출) (테이블 위).
- Perform a platter enclosure coolant drain on the old HV battery. See 플래터 인클로저 냉각수(배출) (테이블 위).
-
Release the clip that attaches the
power conversion system coolant return hose to the HV battery.
-
Release the clip, and then disconnect
the power conversion system coolant return hose from the HV battery.
-
Attach the HV battery H-frame to the
gantry and raise the H-frame into position.
-
Use shackles (x4) to attach the P2
battery sling adapter to the H-frame.
참고Make sure that the shackles are tight, secure, and the sling will not bind or twist when lifting the HV battery.
-
With the help of an assistant, remove
the top from the HV battery shipping crate.
-
With the help of an assistant,
position the gantry over the HV battery shipping crate.
-
Lower the H-frame to the new HV
battery.
-
Install the P2 sling adapter onto the
new HV battery.
-
Lift the new HV battery out of the
shipping crate.
-
With the help of an assistant, move
the gantry away from the HV battery shipping crate and over a battery table.
-
Position an unused HV battery table
under the gantry.
-
Lower the new HV battery onto the
battery table.
-
Remove the P2 battery sling adapter
from the new HV battery.
-
With the help of an assistant, remove
HV battery and table from under the gantry.
-
With the help of an assistant,
position the old HV battery and battery table under the gantry.
-
Install the P2 sling adapter onto the
old HV battery.
-
Raise the old HV battery off of the
battery table.
-
Move the HV battery table out from
under the gantry.
-
With the help of an assistant,
position the gantry over the HV battery shipping crate.
-
With the help of an assistant, align
the old HV battery to the shipping crate, then lower the battery into the crate.
-
Remove the P2 battery sling adapter
from the old HV battery.
-
Raise the gantry and H-frame from the
shipping crate.
-
With the help of an assistant, install
the top onto the HV battery shipping crate, and return the battery to MRB.
-
Return the gantry to position and
remove the HV battery H-frame from the gantry.
-
중요사항:If performing retrofit procedure for vehicles built before August 15, 2022, continue to the next step. If performing retrofit procedure for vehicles built between August 15, 2022 to September 29, 2022, skip to step 126.
-
Use a cut-off tool to cut the bottom
of the HV battery pack bolts (x2).
경고Make sure to wear proper PPE for cutting.경고Do not breathe in fumes.경고Do not cut the top of the bolts. Only remove the bottom of the two bolts shown in image.
-
Spray primer onto the bottom of HV
battery pack bolts (x2).
경고Make sure to wear proper PPE for using aerosol cans. Do not breathe in fumes.경고Spray away from connectors and ground strap.
-
Secure the PCS outlet hose to the HV
battery, and then install the spring clip.
참고Perform a push-pull-push test to ensure the hose is fully seated.
-
Install the clip that attaches the PCS
outlet hose to the HV battery.
-
After 24 hours, remove the sand bag
from the 3 phase header plate.
중요사항: Allow 24hr for adhesive to fully cure. Any movement before curing will compromise adhesion.
-
Remove the cardboard from the 2nd row
floor panel.
-
Clean the 2nd row floor panel
area.
참고Vacuum all debris from interior components before continuing. Wipe wrap as needed. Allow 1 minute of dry time.
-
Remove the wrap from the
vehicle.
-
Vacuum the 2nd row interior
components.
참고All debris MUST be removed.
-
Secure the LH side of the front motor
bay insulator underneath charge port busbar.
-
Secure the clips (x2) that attach the
LH 2nd row buckle harness to the body.
-
With the help of an assistant, move
the HV battery and table to underneath the vehicle.
-
Carefully lower the vehicle onto the
HV battery.
참고Verify that the liftpads will not contact the battery, and that hoses and harness are not compressed or damaged while lowering.
-
First hand start, and then use a power
tool to install the outer center bolts (x4) that attach the HV battery to the
vehicle.
참고Final torque is applied in a later step.팁: 다음 공구 사용을 권장합니다.
- 외부 Torx Plus EP14
-
First hand start, and then use a power
tool to install the outer bolts (x12) that attach the HV battery to the vehicle.
참고Final torque is applied in a later step.팁: 다음 공구 사용을 권장합니다.
- External Torx Plus EP16
-
First hand start, and then use a power tool to install the LH rocker panel bolts (x8)
that attach the HV battery to the vehicle.
참고Final torque is applied in a later step.팁: 다음 공구 사용을 권장합니다.
- 15mm 소켓
-
First hand start, and then use a power
tool to install the RH rocker panel bolts (x8) that attach the HV battery to the
vehicle.
참고Final torque is applied in a later step.팁: 다음 공구 사용을 권장합니다.
- 15mm 소켓
-
Tighten the LH rocker panel bolts (x8) that attach the HV battery to the
vehicle.팁: 다음 공구 사용을 권장합니다.
- 15mm 소켓
-
Tighten the RH rocker panel bolts (x8) that attach the HV battery to the
vehicle.팁: 다음 공구 사용을 권장합니다.
- 15mm 소켓
-
Tighten the outer center bolts (x4)
that attach the HV battery to the vehicle.팁: 다음 공구 사용을 권장합니다.
- 외부 Torx Plus EP14
-
Tighten the outer bolts (x12) that
attach the HV battery to the vehicle.팁: 다음 공구 사용을 권장합니다.
- External Torx Plus EP16
-
With assistance, raise the vehicle,
and then remove battery table from underneath the vehicle.
-
First hand start, use a power tool to
install, and after all have been installed, tighten the center bolts (x4) that attach
the HV battery to the vehicle.팁: 다음 공구 사용을 권장합니다.
- External Torx Plus EP16
-
Verify that the black release lever of
the compressor HV harness connector is in the open position, install the connector
square to the HV battery compressor HV header, secure the release lever to the closed
position, and then slide the red connector locking tab.
- Remove all items from pockets and make sure not to wear any metal items.
-
Inspect the HV insulating
gloves.
참고Refer to service document TN-15-92-003, for information on inspecting HV gloves.
- Put on the HV insulating gloves and then leather over gloves.
-
Remove the bolts (x2) that attach the
front drive unit HV header to the HV battery, and then gently separate the header to
remove it from the HV battery.팁: 다음 공구 사용을 권장합니다.
- 외부 Torx Plus EP10
-
Position the new front drive unit HV
header (PN: 1567101-20-A) onto the HV battery, and then install the bolts (x2) that
attach the header to the HV battery.팁: 다음 공구 사용을 권장합니다.
- 외부 Torx Plus EP10
-
Remove the bolts (x2) that attach the
rear drive unit HV battery LH HV header to the HV battery.팁: 다음 공구 사용을 권장합니다.
- E10 5-lobe socket
-
Release the tabs (x2) that secure the
rear drive unit HV battery LH HV header to the HV battery, and then use a plastic trim
tool to gently remove the header from the HV battery.
-
Secure the new rear drive unit HV
battery LH HV header (PN: 1567101-10-A) to the HV battery.
참고Verify the header is fully seated.
-
Install the bolts (x2) that attach the rear drive unit HV battery LH HV header to the
HV battery.참고Tighten the bolts evenly.팁: 다음 공구 사용을 권장합니다.
- E10 5-lobe socket
-
Repeat step 150 through step 153 for the rear drive unit HV battery RH HV
header.
참고Replace the RH HV header with the same new part - PN: 1567101-10-A.
- Remove the leather glove protectors and the HV insulating gloves.
-
Verify that the black release lever of
the front drive unit HV harness connector is in the open position, install the connector
square to the HV battery front drive unit header, secure the release lever to the closed
position, and then slide the red connector locking tab.
-
Install the bolt that attaches the
front drive unit HV harness to the HV battery.팁: 다음 공구 사용을 권장합니다.
- 8mm 소켓
- Position the coolant drain collector under the front of the vehicle to catch the vehicle coolant.
-
Remove the plugs from both fittings
and immediately connect the power conversion system coolant return to LH sill hose to
the LH sill hose, fasten the clip, and perform a Push-Pull-Push check of the
fittings.
-
Fasten the clips (x2) that attach the
power conversion system coolant return to LH sill hose to the body.
-
Plaid vehicles only - Place a
foldable funnel and absorbent material over the HV harness connectors and under the
power conversion system coolant return hose to direct coolant away from the HV
battery.
-
Plaid vehicles only - Remove the
plugs, immediately connect the rear drive unit branch of the power conversion system
coolant return hose to the coolant return hose, fasten the clip, and perform a
Push-Pull-Push check of the fittings.
-
Plaid vehicles only - Remove
the foldable funnel and absorbent material from under the power conversion system
coolant return hose.
-
Install the ground strap to the body,
and then install the bolt that attaches the ground strap to the body.팁: 다음 공구 사용을 권장합니다.
- 10mm 소켓
-
Return the LH front wheel arch liner
to the LH front wheel arch, and then fasten the clips (x2) that attach the liner to the
wheel arch.
-
Remove the plugs from both fittings
and immediately connect the power conversion system coolant supply hose to the HV
battery, fasten the clip, and perform a Push-Pull-Push check of the fittings.
-
Remove the plugs from both fittings
and immediately connect the HV battery coolant supply hose to the HV battery, fasten the
clip, and perform a Push-Pull-Push check of the fittings.
-
Remove the plugs from both fittings
and immediately connect the 3 way valve to HV battery hose to the HV battery, fasten the
clip, and perform a Push-Pull-Push check of the fittings.
-
Connect the power connector to the HV battery, and then secure the locking tab.
-
Connect the logic connector to the HV battery, and then secure the locking tab.
- Install the front skid plate. See 스키드 플레이트 - 전면(탈거 및 교체).
- Install the front aero shield panel. See 패널 - 에어로 실드 - 전면(탈거 및 교체).
-
Remove the gore breathers (x4) from
rear breather assembly.
경고Be careful not to damage the breathers during removal.참고The breathers will be re-used. The breathers are located at the rear of the pack.
-
Install tapered plugs (x3) into
indicated breather holes.
경고Do not push the plugs too far inside.
-
Install the leak test adapter into the
fourth breather hole.
-
Close both valves on the regulator
test tool.
참고Make sure the valves are closed.
-
Connect the enclosure leak tester
fitting to the leak test adapter.
참고If required, safely secure the leak tester air line in a manner where it will not tug the adapter off.
-
Connect the regulator to air
supply.
-
Turn the RH side regulator valve to
the open position.
참고Open the valve closest to the air line by turning the valve knob to the horizontal position.
-
Set the regulator to 0.3 psi, and then
allow the regulator to stabilize.
-
Open the LH side regulator valve to
allow air into the HV battery, allow the pressure to stabilize at 0.3 psi, and then
close the RH side regulator valve.
참고It will take approximately 60 seconds to reach 0.3 psi.
- Wait 60 seconds to allow pressure to stabilize.
- Record the start pressure value.
- Wait 30 seconds for test.
-
Record the end pressure value.
참고If pressure did not drop more than 0.026 psi, continue to next step, If pressure dropped more than 0.026 psi, then inspect HV battery enclosure for leaks
-
Disconnect the air supply from the
leak tester.
-
Disconnect the enclosure leak tester
fitting from the leak test adapter.
참고Release the leak tester air line if previously secured.
-
Remove the leak test adapter from the
breather hole.
-
Remove the tapered plugs (x3) from the
breather holes.
-
Install the gore breathers (x4) onto
the rear breather assembly.
참고If the breathers were damaged, replace as needed.
-
Verify that the black release lever of
the rear drive unit HV harness connector is in the open position, install the connector
flat and square to the HV battery RH HV header, secure the release lever to the closed
position, and then slide the red connector locking tab.
참고Long Range configuration vehicles will have a dummy plug.
- Install the LH and RH rear subframe shear plates. See 시어 플레이트 - 후면 서브프레임 - LH(탈거 및 교체).
- Install the mid aero shield panel. See 패널 - 에어로 실드 - 중간(탈거 및 교체).
-
Inspect the HV insulating gloves.
참고Refer to service document TN-15-92-003, for information on inspecting HV gloves.
- Put on the HV insulating gloves and then leather over gloves.
- Use an alcohol wipe to clean the charge port busbar connector lead contact surfaces of residual Penetrox, and allow at least one minute to dry.
- Use an alcohol wipe to clean the DC input HV header terminal contact surfaces of residual Penetrox, and allow at least one minute to dry.
- Apply two small drops of Penetrox onto each DC input HV header terminal contact surface, and spread evenly.
-
Install the charge port busbar
connector onto the DC input HV header, and then install the bolts (x2) that attach the
connector to the header.팁: 다음 공구 사용을 권장합니다.
- 10mm 소켓
-
Use the Hioki resistance meter to
measure the resistance between the charge port busbar connector lead and the DC input HV
header bolt head.
참고The acceptable resistance is between 0.050 mΩ (50 μΩ) and 0.195 mΩ (195 μΩ). If the measured resistance is above 0.195 mΩ (195 μΩ), there is too much resistance in the High Voltage joint. Remove the fastener, clean areas with isopropyl alcohol, install fastener back and test again.참고If the resistance is lower than 0.050 mΩ (50 μΩ), reposition the probes and measure again. If after 4 attempts the resistance is consistently lower than 0.050 mΩ (50 μΩ), the test has passed; continue to the next step.
-
Install the bolt that secures the
charge port busbar connector access door.팁: 다음 공구 사용을 권장합니다.
- 10mm 소켓
-
Verify that the black release lever of
the HV 6 pin jumper plug is in the open position, install the jumper plug flat and
square to the 3 phase header, secure the release lever to the closed position, and then
slide the red connector locking tab.
참고Only applicable to revision H and later for North America packs.
- Install the DC input HV header foam block.
- Remove the leather glove protectors and HV insulating gloves
-
Remove the wrap from the RH 2nd row
seatback, and return the seatback and seatbelt to the original positions.
참고Clean debris off wrap before removal. Allow 1 minute dry time.
-
Remove the wrap from the LH 2nd row
seatback, and then return the seatback and seatbelt to the original positions.
참고Clean debris off wrap before removal. Allow 1 minute dry time.
- Install the 2nd row lower seat cushion. See 시트 쿠션 - 하단 - 2열(탈거 및 교체).
- Install the LH and RH 2nd row seat side bolsters. See 볼스터 - 외측 - 시트 - 2열 - LH(탈거 및 교체).
- Put an empty coolant container in the underhood storage unit.
- Fill another container with at least 15L of coolant.
-
Place the filled coolant container
into the front storage area.
-
Remove the coolant bottle cap.
-
Install the vacuum refill cap onto the
coolant bottle assembly.
-
Setup the coolant refill tool.
참고Verify all valves on the refill tool are in the closed position.
-
Install the vacuum refill hose into
the refill cap on the coolant bottle.
참고Perform a push-pull-push test to verify that the hose is fully installed.
-
Put the refill hose inside the filled
coolant container.
참고Make sure the hose end is fully submerged in coolant.
-
Position the overflow hose in the
empty container.
-
Connect shop air supply to the coolant
refill tool.
참고If not already done, verify that the refill valve is set to off.
-
Open the air inlet valve to draw a
vacuum. Once the gauge stabilizes, close the valve fully.
참고The gauge stabilizes roughly at 60-70 cmHg. Vacuum should not drop after the valves are closed.
-
Slowly open the refill valve to allow
coolant to be drawn into the cooling system.
참고Make sure the hose end of refill hose is fully submerged during entire process.
-
Once the gauge reads zero, close the
coolant refill valve.
- Remove the coolant refill hose from the coolant container.
- Remove the coolant overflow hose from the coolant container.
-
Remove the vacuum refill hose from the
refill cap on the coolant bottle.
-
Remove the vacuum refill tool
cap.
- Remove the coolant refill tool from the vehicle.
-
Remove both coolant containers from
the underhood storage unit area.
-
Secure the First Responder Loop and
then secure a 12v maintainer. Leave the LV battery disconnected.
참고Place fender cover over multi-system beam. Connect first responder loop then secure 12v maintainer to positive jump post and chassis ground. Vehicle will power on with 0% Low Voltage message at UI.
- Move the front seats to original position.
-
정비 모드 또는 Toolbox를 사용하여 다음 루틴을 수행합니다(참조 항목: 0005 - 정비 모드):
TEST_VCFRONT_X_THERMAL-COOLANT-AIR-PURGEvia Toolbox: (link)via Service Mode:
- Thermal ➜ Actions ➜ Coolant Purge Stop or Coolant Purge Start
- Thermal ➜ Coolant System ➜ Coolant Purge Start
- Drive Inverter ➜ Front Drive Inverter Replacement ➜ Coolant Air Purge
- Drive Inverter ➜ Rear Drive Inverter Replacement ➜ Coolant Air Purge
- Drive Inverter ➜ Rear Left Drive Inverter Replacement ➜ Coolant Air Purge
- Drive Inverter ➜ Rear Right Drive Inverter Replacement ➜ Coolant Air Purge
- Drive Unit ➜ Front Drive Unit Replacement ➜ Coolant Air Purge
- Drive Unit ➜ Rear Drive Unit Replacement ➜ Coolant Air Purge
경고Make sure the vehicle is not in drive. The test runs for approximately 10 minutes. Putting vehicle into a drive state will stop this routine. Monitor the coolant level and add more coolant as needed.참고Touch the X in the top left of the window to close once the routine is completed. -
Check the coolant level and top off as
needed.
참고Use a mirror to aid visually.참고Make sure the coolant fluid level is at the Max line and top off as needed.
-
Install the coolant bottle cap.
- Reinstall the vehicle firmware. See 펌웨어 재설치 - 터치스크린.
-
Secure the LV battery, and then remove
the maintainer.
- Install the rear underhood apron. See 후드 내 에이프런 - 후면(탈거 및 교체).
- Disconnect the laptop with Toolbox 3 from the vehicle. See Toolbox 3(연결 및 연결 해제).
- Remove the vehicle from the 2 post lift. See 차량 올리기 - 2 포스트 리프트.
- Install the LH and RH rocker panel moldings. See 몰딩 - 로커 패널 - LH(탈거 및 교체).
- Raise the LH front window and close the all the doors.