2025-10-17
PTC Heater Electronics (Rework Busbar Packs for Use in Non-Busbar Vehicles) (Modify)
校正代码
16014567
FRT
1.02
注意:除非本程序中另有明确规定,否则上述校正代码和 FRT 反映的是执行本程序(包括关联程序)所需的所有工作。除非明确要求,否则请勿堆叠校正代码。
注意:请参阅平均维修工时,深入了解 FRT 及其创建方式。要提供有关 FRT 值的反馈,请发送电子邮件至ServiceManualFeedback@tesla.com。
注意:请参阅人员保护,确保在执行以下程序时穿戴适当的个人防护装备 (PPE)。注意:请参阅人体工程学注意事项查看安全健康的作业规程。
- 2025-08-21: Released new procedure.
警告
本程序为“草案”。虽已通过验证,但可能仍有“警告”和“注意”事项缺失。请遵守安全要求,处理或靠近高压系统和部件时,请谨慎操作。
注
Newer replacement HV battery packs do not have PTC heater electronics. Follow this procedure to install PTC heater electronics on the replacement pack.
注
This procedure begins with the old HV battery already removed from the vehicle. Use this correction in conjunction with the appropriate HV battery (Remove and Replace) correction.
注
The parts required for this rework will be automatically added to the service activity. However, the heat shrink tubing (3M PN: EPS300-3/4-48"-RED-45 PCS, Digikey PN: 3M161211-ND) must be procured externally (Tesla employees: use the Digikey punchout).
-
Remove bolts securing ancillary bay cover to HV battery
注18x bolts, E10 5-Lobe, 8 Nm, Use E10 5-Lobe socket without magnet, The fasteners are captive and will stay attached to the ancillary bay cover, The number of bolts on newer vehicles may vary, Early production vehicles may have 28x bolts, T30, 9 Nm
-
Remove HVC logic cap
注1x cap
-
Inspect HV insulating gloves
注Check gloves for damage prior to each use, Refer to service document TN-15-92-003 R5, for information on inspecting HV gloves, https://service.tesla.com/docs/ServiceBulletins/External/TN/TN-15-92-003_High_Voltage_Awareness_Care_Points_R5.pdf
-
Put on HV insulating gloves and leather over gloves
注Use HV cut resistant insulated gloves or HV insulating gloves and leather over gloves
-
Remove ancillary cover from HV battery
-
Remove battery pyro and shunt insulators
注2x insulators, Make sure to wear proper PPE from this step onward until the ancillary cover has been secured
-
Remove bolts securing pyro disconnect to ancillary bay
注2x patch bolts, 13mm, 9 Nm, Discard after removal
-
Remove pyro disconnect from ancillary bay
注1x connector from the bottom, Lift pyro disconnect straight up and out of the ancillary bay
-
Lift HV Controller up to access fuse insulator
注Setup seatbelt to hold HVC assembly and tray in upward position
-
Install HVC logic cap
注1x cap
-
Install insulator for DC input assembly to both fastcharge busbars inlet side
注1x insulator
-
Install negative AC inlet terminal cover
注1x cover, 3x clips, Use caution as the clips are very easy to damage
-
Install positive AC inlet terminal cover
注1x cover, 3x clips, Use caution as the clips are very easy to damage
-
Install HVC logic cap
注1x cap
-
Install pyro disconnect dummy
-
Use bungee to secure HVC in an upwards position
注Wrap bungee around RH headrest
-
Remove the nuts securing the 700VDC 63A compressor fuse
注2x patch nuts, 8mm, 2.5 Nm, Discard after removal
-
Remove the 700VDC 63A PCS output fuse from AWD bus and dist assembly
注1x fuse
-
Remove the nuts securing the 700VDC 63A PCS output fuse
注2x patch nuts, 8mm, 2.5 Nm, Discard after removal
-
Remove the 700VDC 63A compressor fuse from AWD bus and dist assembly
注1x fuse
-
Remove nut securing the HV battery ancillary positive busbar
注1x nut, 10mm, 14Nm
-
Remove the HV battery ancillary positive busbar from AWD bus and dist assembly
-
Remove nut securing negative AC harness to negative HV battery DC link busbar
注1x nut, 8mm, 4.5 Nm
-
Remove nuts securing PTC negative harness
注2x nut, 8mm, 4.5 Nm
-
Disconnect HV carrier connector
注1x connector
-
Remove screw securing HV carrier assembly
注1x screw, T20, 3 Nm
-
Remove HV carrier assembly
-
Install two upside-down M5 nuts on the ancillary tray.
-
Position the heat shrink sleeve on the new HV carrier wire as illustrated (green rectangle).
-
Attach the 2 HV carrier terminals together using an M4 nut and bolt (torque 2.5 Nm).
-
Slide the heat shrink sleeve over the fastened terminals, and then install the sleeve with a heat gun.
警告Use caution and if necessary, PPE such as protective gloves when handling the heat gun.
-
Install HV carrier assembly
-
Install screw securing HV carrier assembly
注1x screw, T20, 3 Nm
-
Connect HV carrier connector
注1x connector
-
Install nuts securing PTC negative harness
注2x nut, 8mm, 4.5 Nm
-
Install nut securing negative AC harness to negative HV battery DC link busbar
注1x nut, 8mm, 4.5 Nm
-
Install the HV battery ancillary positive busbar to AWD bus and dist assembly
-
Install the nut securing the HV battery ancillary positive busbar
注1x nut, 10mm, 4.5 Nm
-
Perform Hioki resistance test at 63A fuse input joint
注55 μΩ or less, Perform zero adjust to Hioki meter prior to testing
-
Install 700VDC 63A PCS output fuse to AWD bus and dist assembly
注1x fuse
-
Install nuts securing the 700VDC 63A PCS output fuse
注2x patch nuts, 8mm, 4.5 Nm, Install new patch nuts, Mark after torque
-
Perform Hioki resistance test at 63A fuse input joint
注1x HV joint, 145μΩ or less, Perform zero adjust to Hioki meter prior to testing
-
Install the 700VDC 63A compressor fuse to AWD bus and dist assembly
注1x fuse
-
Install the nuts securing the 700VDC 63A compressor fuse
注2x patch nuts, 8mm, 4.5 Nm, Install new patch nuts
-
Perform Hioki resistance test at 63A fuse out joint
注1x HV joint, 145 μΩ or less, Perform zero adjust to Hioki meter prior to testing
-
Perform Hioki resistance test at 63A fuse in joint
注1x HV joint, 105μΩ or less, Perform zero adjust to Hioki meter prior to testing
-
Install fuses access insulator
注3x clips
-
Remove pyro disconnect dummy
-
Clean mating surface of pyro
注Use a non-conductive plastic tool to clean the busbar side, Allow 1 minute for IPA to fully dry, Do not use any other types of cleaner
-
Set multimeter to "LoZ" (low impedance) mode
-
Position pyro disconnect to ancillary bay for installation
注1x connector, Make sure to align the 2 pins with pyro disconnect, The pyro disconnect can only be installed one way
-
Install bolts securing pyro disconnect to ancillary bay
注2x patch bolts, 13mm, 9 Nm, Install new patch bolts
-
Measure resistance from module 2 busbar to pyro disconnect
注1x HV joint, 60μΩ or less, Perform zero adjust to Hioki meter prior to testing
-
Measure resistance from pyro disconnect to shunt
注1x HV joint, 45μΩ or less
-
Install battery pyro and shunt insulators
注2x insulators
-
Clean HVC studs and ancillary bay cover underside with isopropyl alcohol
注Ensure no plastisol residue on ancillary bay or HVC, Remove plastisol residue if necessary, Fastener count may vary on new vehicles, Allow 1 minute for IPA to dry
-
Wipe penthouse with IPA to clean surface
注Allow to 1 minute dry time
-
Inspect penthouse walls for damage
注Any dent or depression in the seal that causes it to not be flat will result in a leak, and cannot be reused, Any paint that comes off the penthouse wall, whether or not it sticks to the seal, will require enclosure leak test when reassembled, It can still be reused
-
Inspect penthouse cover seal to confirm it has no visual damage
注Image up close for clarity, Delaminated and torn seals cannot be reused
-
Remove HVC logic cap
注1x cap
-
Remove ancillary Service Insulator Kit
-
Position ancillary cover to HV battery for installation
-
Install HVC logic cap
注1x cap
-
Install ancillary cover to HV battery
注18x bolts, E10 5-Lobe, 8 Nm, new SOP change fastener to captive E10 5-Lobe bolts, use E10 5-Lobe socket without magnet, Follow torque sequence per image, The number of bolts on newer vehicles may vary, Early production vehicles may have 28x bolts, T30, 9 Nm