The list below shows procedures or pages that have been added or updated recently.

Procedure/Page Description Date
Shotgun Inner Procedure steps, images, and fasteners updated. 26-February-25
Front Frame Rail (Complete) Procedure steps, images, and fasteners updated. 26-February-25
Approved Gas Metal Arc (GMA) Welders and Welding Wire List of approved welders updated to include the Cebora SynStar Twin 270T (Model 344). 11-February-25
Approved Squeeze-Type Resistance Spot (STRS) Welders List of approved welders updated to include Chief MI300T and TECNA 3680S welders. 04-February-25
Rear Damper Mount Upper Procedure steps, images, and fasteners updated. 31-January-25
Cantrail Inner Extension Procedure steps, images, and fasteners updated. 31-January-25
Approved Gas Metal Arc (GMA) Welders and Welding Wire Updated the list of approved welders to include GYS P3 GYS Auto, Spanesi Q5.2 ONE INVERTER, and Chief MultiMig 822. 23 - January-25
Parcel Shelf Crossmember Assembly (With Center Trough) New procedure added. 22-January-25
Rear Wheelhouse Front Stiffener Procedure steps, images, and fasteners updated. 16-January-25
Trunk Floor Assembly (Complete) Procedure images and fasteners updated. 16-January-25
Body Side Outer Sectioning information updated. 16-January-25
Divider Bar Reinforcement Procedure steps, images, and fasteners updated. 10-January-25
Front Frame Rail Inner With Bracket (Small Front Section) Procedure steps, images, and fasteners updated. 09-January-25
Front Frame Rail (Complete) Procedure steps, images, and fasteners updated. 09-January-25
Parcel Shelf Crossmember Assembly This procedure has been renamed "Parcel Shelf Crossmember Assembly (Without Center Trough)". 09-January-25
Parcel Shelf Extension (Rear) Procedure steps, images, and fasteners updated. 05-December-24
Approved Frame Bench Systems and Optional Electronic Measuring Systems Updated the list of approved frame benches to include Spanesi Daytona. 04-December-24
Front Subframe Mount (Front Inner) Procedure steps, images, and fasteners updated. 19-November-24
Front Jack Pad Bracket Procedure steps, images, and fasteners updated. 13-November-24
Front Bumper Fascia Repair Guidelines Added new information about removing and installing fascia ducts. 11-November-24
A-Pillar Outer Reinforcement (Section) Procedure images and fasteners updated. 24-October-24
Rear Aero Shield Attachment Bracket (Rear) Procedure steps, images, and fasteners updated. 10-October-24
Body Structure Materials and Allowed Operations The section "Repairing Cosmetic Damage" has been updated. 08-October-24
Sill Insert (Front Section) New procedure added. 30-September-24
Approved Chemicals Updated the approved list of Non-Structural Adhesives. 10-September-24
Front Bumper Fascia Repair Guidelines Added information about removing and reinstalling fascia ducts. 29-August-24
Shotgun Tower Procedure steps, images, and fasteners updated. 20-August-24
Approved Squeeze-Type Resistance Spot (STRS) Welders New welding caps approved for Pro Spot welders. 19-August-24
Front Frame Rail Inner Reinforcement (Complete) Procedure steps, images, and fasteners updated. 05-August-24
Shotgun Inner Procedure steps, images, and fasteners updated. 29-July-24
Front Shock Tower Support (Front) Procedure steps, images, and fasteners updated. 26-July-24
Front Seat Floor Crossmember Glove (Front) Procedure steps, images, and fasteners updated. 26-July-24
Shotgun Outer Procedure steps, images, and fasteners updated. 17-July-24
Front Jack Pad Bracket Procedure steps, images, and fasteners updated. 12-July-24
Approved Frame Bench Systems and Optional Electronic Measuring Systems Updated the approved vehicles for the Globaljig Evolution 5.0 frame bench. 6-June-24
Front Floor Extension Procedure steps, images, and fasteners updated. 6-June-24
Shotgun Outer Procedure steps, images, and fasteners updated. 4-June-24