Recent Changes In This Manual
The list below shows procedures or pages that have been added or updated recently.
| Procedure/Page | Description | Date |
|---|---|---|
| Approved Chemicals | Added Structural Plastic Adhesive, and updated availability of Semi-Rigid Plastic Repair. | 08-April-26 |
| Rear Wheel Arch (Complete) | Procedure steps, images, and fasteners updated. | 07-April-26 |
| Wheelhouse Outer Extension | Procedure steps, images, and fasteners updated. | 07-April-26 |
| Rear Frame Rail (Cast) | Procedure steps, images, and fasteners updated. | 07-April-26 |
| Charge Port Housing Assembly | Procedure steps, images, and fasteners updated. | 07-April-26 |
| Front Shock Tower Support (Front) | Procedure steps, images, and fasteners updated. | 07-April-26 |
| Rear Frame Rail (Cast) | Procedure steps, images, and fasteners updated. | 07-April-26 |
| Rear Quarter Inner (Panel) | Procedure steps updated. | 02-April-26 |
| Quarter Outer Skin | Procedure steps, images, and fasteners updated. | 02-April-26 |
| Longitudinal Upper | Images updated. | 25-March-26 |
| Approved Squeeze-Type Resistance Spot (STRS) Welders | Update the list of approved GYS welders. | 12-March-26 |
| Longitudinal Upper | Procedure steps, images, and fasteners updated. | 05-March-26 |
| Procedure steps, images, and fasteners updated. | 26-February-26 | |
| Shotgun Outer | Procedure steps, images, and fasteners updated. | 26-February-26 |
| Third Row Seat Crossmember (Lower) | Procedure images updated. | 19-February-26 |
| Longitudinal Upper | Procedure steps, images, and fasteners updated. | 19-February-26 |
| Rear Quarter Inner (Assembly) | Procedure steps, images, and fasteners updated. | 19-February-26 |
| Approved Chemicals | The list of Anti-Chip Coatings has been updated. | 11-February-26 |
| Trunk Floor Assembly (Complete) | 1 procedure image and fasteners updated. | 11-February-26 |
| Front Seat Mount Reinforcements (Front Inboard and All Rear) - (Vehicles Built After January 4, 2023) | New procedure added. | 13-June-25 |
| Front Seat Mount Reinforcements (Front Outboard) - (Vehicles Built After January 4, 2023) | New procedure added. | 13-June-25 |
| Rear Frame Rail (Lower) | Procedure steps, images, and fasteners updated. | 20-May-25 |
| Front Header Reinforcement Connector | Procedure steps, images, and fasteners updated. | 06-May-25 |
| Sill Outer (Front Section) | Procedure steps, images, and fasteners updated. | 25-April-25 |
| Sill Outer (Complete) | Procedure steps, images, and fasteners updated. | 28-March-25 |
| Shotgun Inner | Procedure steps, images, and fasteners updated. | 26-February-25 |
| Front Frame Rail (Complete) | Procedure steps, images, and fasteners updated. | 26-February-25 |
| Approved Gas Metal Arc (GMA) Welders and Welding Wire | List of approved welders updated to include the Cebora SynStar Twin 270T (Model 344). | 11-February-25 |
| Approved Squeeze-Type Resistance Spot (STRS) Welders | List of approved welders updated to include Chief MI300T and TECNA 3680S welders. | 04-February-25 |
| Rear Damper Mount Upper | Procedure steps, images, and fasteners updated. | 31-January-25 |
| Cantrail Inner Extension | Procedure steps, images, and fasteners updated. | 31-January-25 |
| Approved Gas Metal Arc (GMA) Welders and Welding Wire | Updated the list of approved welders to include GYS P3 GYS Auto, Spanesi Q5.2 ONE INVERTER, and Chief MultiMig 822. | 23 - January-25 |
| Parcel Shelf Crossmember Assembly (With Center Trough) | New procedure added. | 22-January-25 |
| Rear Wheelhouse Front Stiffener | Procedure steps, images, and fasteners updated. | 16-January-25 |
| Trunk Floor Assembly (Complete) | Procedure images and fasteners updated. | 16-January-25 |
| Body Side Outer | Sectioning information updated. | 16-January-25 |
| Divider Bar Reinforcement | Procedure steps, images, and fasteners updated. | 10-January-25 |
| Front Frame Rail Inner With Bracket (Small Front Section) | Procedure steps, images, and fasteners updated. | 09-January-25 |
| Front Frame Rail (Complete) | Procedure steps, images, and fasteners updated. | 09-January-25 |
| Parcel Shelf Crossmember Assembly | This procedure has been renamed "Parcel Shelf Crossmember Assembly (Without Center Trough)". | 09-January-25 |