Recent Changes In This Manual

The list below shows procedures or pages that have been added or updated recently.

Procedure/Page Description Date
Approved Chemicals Added Structural Plastic Adhesive, and updated availability of Semi-Rigid Plastic Repair. 08-April-26
Rear Wheel Arch (Complete) Procedure steps, images, and fasteners updated. 07-April-26
Wheelhouse Outer Extension Procedure steps, images, and fasteners updated. 07-April-26
Rear Frame Rail (Cast) Procedure steps, images, and fasteners updated. 07-April-26
Charge Port Housing Assembly Procedure steps, images, and fasteners updated. 07-April-26
Front Shock Tower Support (Front) Procedure steps, images, and fasteners updated. 07-April-26
Rear Frame Rail (Cast) Procedure steps, images, and fasteners updated. 07-April-26
Rear Quarter Inner (Panel) Procedure steps updated. 02-April-26
Quarter Outer Skin Procedure steps, images, and fasteners updated. 02-April-26
Longitudinal Upper Images updated. 25-March-26
Approved Squeeze-Type Resistance Spot (STRS) Welders Update the list of approved GYS welders. 12-March-26
Longitudinal Upper Procedure steps, images, and fasteners updated. 05-March-26
Procedure steps, images, and fasteners updated. 26-February-26
Shotgun Outer Procedure steps, images, and fasteners updated. 26-February-26
Third Row Seat Crossmember (Lower) Procedure images updated. 19-February-26
Longitudinal Upper Procedure steps, images, and fasteners updated. 19-February-26
Rear Quarter Inner (Assembly) Procedure steps, images, and fasteners updated. 19-February-26
Approved Chemicals The list of Anti-Chip Coatings has been updated. 11-February-26
Trunk Floor Assembly (Complete) 1 procedure image and fasteners updated. 11-February-26
Front Seat Mount Reinforcements (Front Inboard and All Rear) - (Vehicles Built After January 4, 2023) New procedure added. 13-June-25
Front Seat Mount Reinforcements (Front Outboard) - (Vehicles Built After January 4, 2023) New procedure added. 13-June-25
Rear Frame Rail (Lower) Procedure steps, images, and fasteners updated. 20-May-25
Front Header Reinforcement Connector Procedure steps, images, and fasteners updated. 06-May-25
Sill Outer (Front Section) Procedure steps, images, and fasteners updated. 25-April-25
Sill Outer (Complete) Procedure steps, images, and fasteners updated. 28-March-25
Shotgun Inner Procedure steps, images, and fasteners updated. 26-February-25
Front Frame Rail (Complete) Procedure steps, images, and fasteners updated. 26-February-25
Approved Gas Metal Arc (GMA) Welders and Welding Wire List of approved welders updated to include the Cebora SynStar Twin 270T (Model 344). 11-February-25
Approved Squeeze-Type Resistance Spot (STRS) Welders List of approved welders updated to include Chief MI300T and TECNA 3680S welders. 04-February-25
Rear Damper Mount Upper Procedure steps, images, and fasteners updated. 31-January-25
Cantrail Inner Extension Procedure steps, images, and fasteners updated. 31-January-25
Approved Gas Metal Arc (GMA) Welders and Welding Wire Updated the list of approved welders to include GYS P3 GYS Auto, Spanesi Q5.2 ONE INVERTER, and Chief MultiMig 822. 23 - January-25
Parcel Shelf Crossmember Assembly (With Center Trough) New procedure added. 22-January-25
Rear Wheelhouse Front Stiffener Procedure steps, images, and fasteners updated. 16-January-25
Trunk Floor Assembly (Complete) Procedure images and fasteners updated. 16-January-25
Body Side Outer Sectioning information updated. 16-January-25
Divider Bar Reinforcement Procedure steps, images, and fasteners updated. 10-January-25
Front Frame Rail Inner With Bracket (Small Front Section) Procedure steps, images, and fasteners updated. 09-January-25
Front Frame Rail (Complete) Procedure steps, images, and fasteners updated. 09-January-25
Parcel Shelf Crossmember Assembly This procedure has been renamed "Parcel Shelf Crossmember Assembly (Without Center Trough)". 09-January-25