IP Carrier (Remove and Replace)
Correction code
14052102
1.98
NOTA: Salvo explicitamente indicado em contrário no procedimento, o código de correção acima e o FRT refletem todo o trabalho necessário para a realização deste procedimento, incluindo os procedimentos associados. Não acumule códigos de correção, salvo se explicitamente instruído.
NOTA: Consulte Tempos de taxa fixa para saber mais sobre FRT e sobre a respetiva criação.
NOTA: Consulte Proteção pessoal para garantir que utiliza o EPI adequado durante a realização do procedimento abaixo. NOTA: Consulte para conhecer as práticas seguras e saudáveis de trabalho.
- 2023-03-29: Revised procedure.
- 2024-01-29: Re-structured the procedure.
- 2024-07-30: Added information about how to handle the replacement between different versions of IP carrier.
| Description | Torque Value | Recommended Tools | Reuse/Replace | Notes |
|---|---|---|---|---|
| Bolts (x2) that attach the LH and RH window defroster ducts to the instrument panel carrier |
![]() 2.3 Nm (1.7 lbs-ft) |
|
Reuse |
Remove
- Remove the instrument panel carrier. See .
- Remove the front passenger air bag. See .
-
Remove the bolts (x2) that
attach the LH and RH window defroster ducts to the instrument panel carrier,
and remove the ducts.
TIpUse of the following tool(s) is recommended:
- Torx T20 socket
- 2 in extension
- Ratchet/torque wrench
-
Remove the LH and RH defrost
covers. See .
Note4 tabs for the LH side and 5 tabs for the RH side.
Install
-
If the new instrument panel
carrier does not have tweeter holes, the tweeter connectors must be taped
back to the harness before the replacement instrument panel carrier is
installed.
CAUTIONDo NOT cut holes into the new instrument panel carrier as an attempt to retrofit the tweeters.CAUTIONFailure to tape back the existing tweeter connector may result in NVH issues.NoteUse black tape. The yellow tape used in the picture is for demonstration purpose only.
-
If the new instrument panel
carrier has tweeter holes while the replaced one does not, the tweeter hole
must be covered before the replacement instrument panel carrier is
installed.
NoteCut a piece of butyl to cover the hole. Make sure the butyl does not cover the IP clips or interfere with the speaker perimeter.
-
Install the LH and RH
defrost covers. See .
Note4 tabs for the LH side and 5 tabs for the RH side.
-
Install the bolts (x2) that
attach the LH and RH window defroster ducts to the instrument panel
carrier.
2.3 Nm (1.7 lbs-ft)TIpUse of the following tool(s) is recommended:- Torx T20 socket
- 2 in extension
- Ratchet/torque wrench
- Install the front passenger air bag. See .
- Install the instrument panel carrier. See .