26/07/2024 15:13:07

Rear Node (Complete)

Parts List

Quantity Description Image / Notes
1 MODEL S, ASY-MEMBER RAIL RR (Rear Node Complete Assembly)
22 High Strength Structural Rivet, 6.5 mm
12 Bolt , M8-1.25x20 Tesla part number 1621820-00-A.
1 Bolt , PF M8x20 Tesla part number 1007580-00-A.
1 Bolt , M8x50 Tesla part number 1046838-00-A.
2 Bolt, Torx-head , M8-1.25x20 Tesla part number 1014747-00-B.
1 Nut Tesla part number 1006628-01-A.

When ordering parts, refer to the Parts Catalog and enter the VIN of the vehicle being repaired to find the correct parts (and the part numbers) for the vehicle. Alternatively, use the search function in the Parts Catalog to find a specific part for the vehicle.

Repair Procedure

  1. Remove the Rear Panel.
    Based on the vehicle build date, remove the Rear Panel using the appropriate procedure:
  2. Remove the Rear Trunk Floor.
    Based on the vehicle build date, remove the Rear Trunk Floor using the appropriate procedure:
  3. Remove the Rear Trunk Waterfall Panel.
    Based on the vehicle build date, remove the Rear Trunk Waterfall Panel using the appropriate procedure:
  4. Remove the Rear Wheelhouse Extension.
  5. Remove the Rear Trunk Floor Extension.
  6. Remove the Rear Node Upper Reinforcement (Rear).
  7. Remove the Rear Node Upper Reinforcement (Middle).
  8. Remove the Rear Node Upper Reinforcement (Front).
  9. Remove the Rear Torque Box Lower Reinforcement.
  10. Remove the original component.

    or Factory Spot Welds

    or Factory SPRs

    or RIVTAC

    or Factory Structural Rivets

    or Bolts

    or Bolt, Torx-head

    Factory BOM

  11. Use structural adhesive to attach the nuts in position on the inside of the Rear Node.
    Nut , M8-1.25
  12. Prepare for installation.
    or High Strength Structural Rivets, 6.5 mm
    • A = 260 mm.
    • B = 15 mm.
    • C = 22mm.
    • D = 9 mm.
    • E = 13 mm.
    • F = 21 mm.

    or Bolts

    or Bolt, Torx-head

    Nut , M8-1.25

  13. Apply structural adhesive to the mating surfaces on the vehicle and the new component or components.
  14. Install the new component or components.
    Torque the bolt indicated to 25 Nm.

    or Bolts

    Torque all other bolts to 24 Nm.

  15. Install the .Rear Torque Box Lower Reinforcement
  16. Install the Rear Node Upper Reinforcement (Front).
  17. Install the Rear Node Upper Reinforcement (Middle).
  18. Install the Rear Node Upper Reinforcement (Rear).
  19. Install the Rear Trunk Waterfall Panel.
  20. Install the Rear Trunk Floor.
  21. Install the Rear Trunk Floor Extension.
  22. Install the Rear Wheelhouse Extension.
  23. Install the Rear Panel.
  24. Perform any necessary post-repair operations.