Box - Air Distribution - HVAC (Model YL) (Remove and Replace)
Correction code
18101601002
FRT
1.20
NOTE: Unless
otherwise explicitly stated in the procedure, the correction code and its
associated FRT reflect all of the work required to perform this procedure,
including the linked procedures. Do not stack correction
codes unless explicitly told to do so.
NOTE: See Flat Rate Times to
learn more about FRTs and how they are created.
NOTE: See Personal Protection to make
sure you are wearing proper PPE when performing the procedure below.
NOTE: See Ergonomic Precautions for safe and healthy
working practices.
Remove
-
Remove the 3rd row head duct. See
Duct - Head - 3rd Row (Model YL) (Remove and Replace).
NoteDuring removal, certain steps require extra care. See the animation(s) for detailed guidance.
-
Release the B-pillar A section ducts from both sides.
NoteGently lift and shake the ducts to assist in releasing.
-
Disconnect the 320 DEG actuator connector.
-
Release the clips (x3) to remove the HVAC air distribution box assembly.
Install
-
Secure the clips (x3) to install the HVAC air distribution box assembly.
-
Connect the 320 DEG actuator connector.
-
Install the B-pillar A section ducts to both sides.
NoteGently lift and shake the ducts to assist in installing.
- Install the 3rd row head duct. See Duct - Head - 3rd Row (Model YL) (Remove and Replace).