Dash Reinforcement Assembly
Correction code:
10101023702
NOTE:
Unless explicitly stated in the procedure, the above
correction code includes all Collision Repair work required
to perform this procedure, including the linked Collision
Repair procedures. Do not stack Collision Repair
correction codes unless explicitly told to do
so. Add any associated mechanical procedures
needed to perform this procedure.
Repair Information
- Review all collision repair general practices and safety documentation and wear the appropriate PPE (Personal Protective Equipment) before beginning this procedure.
- This procedure can be completed without using a frame bench.
Parts List
Quantity | Description | Image / Notes |
---|---|---|
1 | ASY - DASH WITH COWL LOWER AND TOEBOARD (Dash Reinforcement Assembly with Cowl Lower and Toeboard) |
![]() |
1 | BUTYL FOIL PATCH 300X150x2MM (Butyl foil patch) | Tesla part number 1004969-00-A. |
66 |
![]() |
|
33 |
![]() |
|
12 |
![]() |
|
4 |
![]() |
|
19 |
![]() |
|
13 |
![]() |
When ordering parts, refer to the Parts Catalog and enter the VIN of the vehicle being repaired to find the correct parts (and the part numbers) for the vehicle. Alternatively, use the search function in the Parts Catalog to find a specific part for the vehicle.
Repair Procedure
- Remove the original component.
- Remove the Dash Reinforcement Assembly from the Dash With Cowl Lower and Toeboard Assembly service part.
-
Prepare for installation.
NoteA red X indicates a location where a factory-installed fastener is not being replaced.
or
High Strength Structural Rivets, 6.5 mm
- A = 51 mm.
- B = 7 mm.
- C = 8 mm.
- D = 51 mm.
- E = 14 mm.
- F = 12 mm.
- G = 75 mm.
- H = 8 mm.
- I = 11 mm.
- J = 14 mm.
- K = 200 mm.
- L = 151 mm.
- M = 101 mm.
- N = 11 mm.
or
Structural Bulb Rivets, 6.5 mm
or
Structural Countersunk Rivets, 6.5 mm
or
Countersunk Rivets, 4.8 mm Short
- Apply structural adhesive to the mating surfaces on the vehicle and the new component or components.
- Install the new component or components.
- After painting is complete, install the butyl patch as shown to cover the rivets installed to secure the Dash Reinforcement Assembly and the Torque Box.
- Perform any necessary post-repair operations.