Recent Changes In This Manual
The list below shows procedures or pages that have been added or updated recently.
| Procedure/Page | Description | Date |
|---|---|---|
| Steering Gear Replacement Guidelines | Some component names and images updated. | 13-October-2026 |
| Rear Node (Complete) | One image and fastener locations updated. | 13-October-2026 |
| Torque Box Rear Upper | New procedure added. | 06-October-2026 |
| Trunk Floor Assembly (Complete) | Procedure step and image updated. | 06-October-2026 |
| Front Shock Tower Cap | Procedure images updated. | 06-October-2026 |
| Rear Frame Rail (Cast) | New procedure added. | 06-October-2026 |
| Quarter Outer Assembly (Without Upper Trough) | Procedure images updated. | 01-October-2026 |
| Vehicle and Wheel Paint Codes | Nova wheel now available in Zero G. | 1-September-2026 |
| Approved Chemicals | APAC sourcing information updated. | 27-August-2026 |
| Electrical Harness Repair Guidelines | This content has been replaced with updated content from the Service Manual. | 26-August-2026 |
| Vehicle and Wheel Paint Codes | Marine Blue added. | 07-July-2026 |
| Door Ring Outer | Procedure images updated. | 09-July-2026 |
| Rear Frame Rail Glove (Lower) | A frame bench is no longer required to perform this procedure. | 01-July-2026 |
| B-Pillar Outer (Complete) | New procedure added. | 01-July-2026 |
| B-Pillar Inner Assembly (Complete) | Prerequisites and post requisites updated. | 01-July-2026 |
| C–Pillar Reinforcement | Procedure steps, images, and fasteners updated. | 01-July-2026 |
| Cowl Side Assembly | Procedure steps, images, and fasteners updated. | 01-July-2026 |
| Cantrail Inner Assembly | Procedure images updated. | 25-June-2026 |
| Cowl Side Assembly | Procedure steps, images, and fasteners updated. | 10-June-2026 |
| Repair procedures. | Mechanical prerequisite and post-requisite procedures formerly available only in the Service Manual have been incorporated as steps in the Collision Repair Manual. | 19-May-26 |
| Hinge Pillar | Procedure images updated. | 15-May-26 |
| Shotgun Inner | Procedure images updated. | 24-April-26 |
| Approved Chemicals | Added Structural Plastic Adhesive, and updated availability of Semi-Rigid Plastic Repair. | 08-April-26 |
| Approved Squeeze-Type Resistance Spot (STRS) Welders | Update the list of approved GYS welders. | 12-March-26 |
| Shotgun Outer | Procedure steps, images, and fasteners updated. | 26-February-26 |
| Approved Chemicals | The list of Anti-Chip Coatings has been updated. | 11-February-26 |
| B-Pillar Outer (Lower) | Procedure steps, images, and fasteners updated. | 19-June-25 |
| C–Pillar Reinforcement | Procedure steps, images, and fasteners updated. | 12-June-25 |
| Front Frame Rail (Complete) | Procedure steps, images, and fasteners updated. | 08-May-25 |
| Hinge Pillar | Procedure steps, images, and fasteners updated. | 01-May-25 |
| Rear Node (Complete) | Procedure steps, images, and fasteners updated. | 22-April-25 |
| Rear Wheelhouse Reinforcement | Procedure steps, images, and fasteners updated. | 31-March-25 |
| Procedure steps, images, and fasteners updated. | 28-March-25 | |
| B-Pillar Outer (Lower) | Procedure steps, images, and fasteners updated. | 28-March-25 |
| Cowl Side Assembly | Procedure steps, images, and fasteners updated. | 13-March-25 |