Recent Changes In This Manual

The list below shows procedures or pages that have been added or updated recently.

Procedure/Page Description Date
Steering Gear Replacement Guidelines Some component names and images updated. 13-October-2026
Rear Node (Complete) One image and fastener locations updated. 13-October-2026
Torque Box Rear Upper New procedure added. 06-October-2026
Trunk Floor Assembly (Complete) Procedure step and image updated. 06-October-2026
Front Shock Tower Cap Procedure images updated. 06-October-2026
Rear Frame Rail (Cast) New procedure added. 06-October-2026
Quarter Outer Assembly (Without Upper Trough) Procedure images updated. 01-October-2026
Vehicle and Wheel Paint Codes Nova wheel now available in Zero G. 1-September-2026
Approved Chemicals APAC sourcing information updated. 27-August-2026
Electrical Harness Repair Guidelines This content has been replaced with updated content from the Service Manual. 26-August-2026
Vehicle and Wheel Paint Codes Marine Blue added. 07-July-2026
Door Ring Outer Procedure images updated. 09-July-2026
Rear Frame Rail Glove (Lower) A frame bench is no longer required to perform this procedure. 01-July-2026
B-Pillar Outer (Complete) New procedure added. 01-July-2026
B-Pillar Inner Assembly (Complete) Prerequisites and post requisites updated. 01-July-2026
C–Pillar Reinforcement Procedure steps, images, and fasteners updated. 01-July-2026
Cowl Side Assembly Procedure steps, images, and fasteners updated. 01-July-2026
Cantrail Inner Assembly Procedure images updated. 25-June-2026
Cowl Side Assembly Procedure steps, images, and fasteners updated. 10-June-2026
Repair procedures. Mechanical prerequisite and post-requisite procedures formerly available only in the Service Manual have been incorporated as steps in the Collision Repair Manual. 19-May-26
Hinge Pillar Procedure images updated. 15-May-26
Shotgun Inner Procedure images updated. 24-April-26
Approved Chemicals Added Structural Plastic Adhesive, and updated availability of Semi-Rigid Plastic Repair. 08-April-26
Approved Squeeze-Type Resistance Spot (STRS) Welders Update the list of approved GYS welders. 12-March-26
Shotgun Outer Procedure steps, images, and fasteners updated. 26-February-26
Approved Chemicals The list of Anti-Chip Coatings has been updated. 11-February-26
B-Pillar Outer (Lower) Procedure steps, images, and fasteners updated. 19-June-25
C–Pillar Reinforcement Procedure steps, images, and fasteners updated. 12-June-25
Front Frame Rail (Complete) Procedure steps, images, and fasteners updated. 08-May-25
Hinge Pillar Procedure steps, images, and fasteners updated. 01-May-25
Rear Node (Complete) Procedure steps, images, and fasteners updated. 22-April-25
Rear Wheelhouse Reinforcement Procedure steps, images, and fasteners updated. 31-March-25
Procedure steps, images, and fasteners updated. 28-March-25
B-Pillar Outer (Lower) Procedure steps, images, and fasteners updated. 28-March-25
Cowl Side Assembly Procedure steps, images, and fasteners updated. 13-March-25