Recent Changes In This Manual
The list below shows procedures or pages that have been added or updated recently.
| Procedure/Page | Description | Date |
|---|---|---|
| Front Frame Rail Adapter Assembly | Procedure steps, images, and fasteners updated. | 15-October-2026 |
| Front Frame Rail Adapter Assembly | Procedure images updated. | 23-September-2026 |
| Repair procedures | Mechanical prerequisite and post-requisite procedures formerly available only in the Service Manual have been incorporated as steps in the Collision Repair Manual. | 16-September-2026 |
| Approved Chemicals | APAC sourcing information updated. | 27-August-2026 |
| Electrical Harness Repair Guidelines | This content has been replaced with updated content from the Service Manual. | 26-August-2026 |
| Vehicle and Wheel Paint Codes | Garnet Red has been added to the Vehicle Paint Codes list. | 09-June-2026 |
| Front Shock Tower (All Dual Motor Vehicles and All Vehicles Built After April 10, 2016) | Procedure steps and images added. | 15-May-26 |
| Approved Chemicals | Added Structural Plastic Adhesive, and updated availability of Semi-Rigid Plastic Repair. | 08-April-26 |
| Approved Squeeze-Type Resistance Spot (STRS) Welders | Update the list of approved GYS welders. | 12-March-26 |
| Front Frame Rail Adapter Assembly | Procedure steps, images, and fasteners updated. | 26-February-26 |
| Quarter Outer (Lower Section) | New procedure added. | 19-February-26 |
| Approved Chemicals | The list of Anti-Chip Coatings has been updated. | 11-February-26 |
| Hinge Pillar Assembly | Procedure steps, images, and fasteners updated. | 30-April-25 |