Recent Changes In This Manual
The list below shows procedures or pages that have been added or updated recently.
| Procedure/Page | Description | Date |
|---|---|---|
| Approved Chemicals | Added Structural Plastic Adhesive, and updated availability of Semi-Rigid Plastic Repair. | 08-April-26 |
| Approved Squeeze-Type Resistance Spot (STRS) Welders | Update the list of approved GYS welders. | 12-March-26 |
| Front Frame Rail Adapter Assembly | Procedure steps, images, and fasteners updated. | 26-February-26 |
| Quarter Outer (Lower Section) | New procedure added. | 19-February-26 |
| Approved Chemicals | The list of Anti-Chip Coatings has been updated. | 11-February-26 |
| Hinge Pillar Assembly | Procedure steps, images, and fasteners updated. | 30-April-25 |
| Approved Gas Metal Arc (GMA) Welders and Welding Wire | List of approved welders updated to include the Cebora SynStar Twin 270T (Model 344). | 11-February-25 |
| Approved Squeeze-Type Resistance Spot (STRS) Welders | List of approved welders updated to include Chief MI300T and TECNA 3680S welders. | 04-February-25 |
| Approved Gas Metal Arc (GMA) Welders and Welding Wire | Updated the list of approved welders to include GYS P3 GYS Auto, Spanesi Q5.2 ONE INVERTER, and Chief MultiMig 822. | 23 - January-25 |