2026-06-23

Dash Reinforcement Panel

Correction code: 10101022802 NOTE: Unless explicitly stated in the procedure, the above correction code includes all Collision Repair and Service repair work required to perform this procedure, including the linked Collision Repair procedures and linked Service procedures. Do not stack Collision Repair correction codes unless explicitly told to do so. Depending on the damage to the vehicle, additional repairs may be required.

Parts List

Quantity Description Image / Notes
1 Asy-Dash and brake/IP stiffeners (Dash Reinforcement Panel)
8 High Strength Structural Rivet, 6.5 mm
26 Structural Bulb Rivet, 6.5 mm
2 Countersunk Rivet, 4.8 mm Long
10 Flow Form Rivet S18
2 Flow Form Rivet S48
2 Bolt, Torx-head Tesla part number 1621839-00-B.

When ordering parts, refer to the Parts Catalog and enter the VIN of the vehicle being repaired to find the correct parts (and the part numbers) for the vehicle. Alternatively, use the search function in the Parts Catalog to find a specific part for the vehicle.

Repair Procedure

  1. Remove the Noise Absorber - Motor Bay - Front Bulkhead (Remove and Replace).
  2. Remove the Insulator - Dash (Remove and Replace).
  3. Remove the Hose - Drain - HVAC (Remove and Replace).
  4. Remove the Funnel - Drain - HVAC (Remove and Replace).
  5. Remove the Hydraulic Control Unit (HCU) - Brake (Remove and Replace).
  6. Remove the Electromechanical Brake Booster Assembly (Remove and Replace).
  7. Remove the Superbeam (Remove and Replace).
  8. Remove the Subframe Assembly - Front (Remove and Install).
  9. Remove the Carpet - 1st Row (Remove and Replace).
  10. Remove the Cowl Top Assembly.
  11. Remove the original component.

    or Factory Spot Welds

    or RIVTAC

    or Bolt, Torx-head

  12. Prepare for installation.
  13. Apply structural adhesive to the mating surfaces on the vehicle and the new component or components.
  14. Install the new component or components.
    Torque the bolts to 30 Nm.
  15. Install the Cowl Top Assembly.
  16. Perform any necessary post-repair operations.
  17. Install the Carpet - 1st Row (Remove and Replace).
  18. Install the Subframe Assembly - Front (Remove and Install).
  19. Install the Superbeam (Remove and Replace).
  20. Install the Electromechanical Brake Booster Assembly (Remove and Replace).
  21. Install the Hydraulic Control Unit (HCU) - Brake (Remove and Replace).
  22. Install the Funnel - Drain - HVAC (Remove and Replace).
  23. Install the Hose - Drain - HVAC (Remove and Replace).
  24. Install the Insulator - Dash (Remove and Replace).
  25. Install the Noise Absorber - Motor Bay - Front Bulkhead (Remove and Replace).