STEP 1: Plan the Installation Site Choose a LocationChoose Side or Rear Cable Entry for PowerwallChoose Backup Gateway Cable EntryPlan the Electrical Service Connection to Backup GatewayPlan Wiring MethodPlan Distance Between Components