Whole-Home Backup

  • All loads and generation are downstream of the Backup Gateway contactor.
  • Site-level metering is performed by integrated Site CTs.
  • Internal panelboard kit may be used for Generation breakers.
  • Neutral-Ground Bonding Strap installed only if Gateway is main service equipment.
Figure 1. Whole Home Backup with Standalone Meter
Figure 2. Whole Home Backup with Meter Load Center