Non-Backup loads (refer to design guidance for information on selecting
circuits to back up)
If Non-backup loads are connected
to the Non-Backup Lugs, Site-level metering is performed by integrated Site
CTs.
If Non-backup loads are upstream
of the Gateway, Site-level metering is performed by integrated Site CTs plus
additional 100 A CTs on L1/L2 of non-backup circuit, or by remote meters at the
point of interconnection.
The internal panelboard kit may
be used for Generation breakers or Non-Backup loads.
Neutral-Ground Bonding Strap
installed only if Gateway is main service equipment.
Figure 1. Partial Home Backup with
Standalone MeterFigure 2. Partial Home Backup with
Standalone Meter - Option Using Secondary Load LugsFigure 3. Partial Home Backup with Meter
Load Center