1.0 |
2020-05-23 |
Initial release |
1.1 |
2020-06-26 |
- Added Powerwall and Backup Gateway 2 specifications
- Updated multi-Powerwall communication wiring instructions for
clarity
|
1.2 |
2020-08-10 |
|
1.3 |
2020-09-30 |
Corrected stack kit dimensions |
1.4 |
2020-12-15 |
- Added warning to allow the Backup Gateway a full minute to
complete its boot sequence before power cycling or resetting it
(Close the Wiring Compartments and Turn the System On)
- Added minimum clearance above Backup Gateway
- Updated to
include Powerwall part number 3012170-xx-y
- Added note on
maximum input channel current that can be measured by each CT
when two CTs are used in parallel (Current Transformer Capacity)
|
1.5 |
2021-06-23 |
- Updated Installing a Neurio Energy Meter appendix to include the
Neurio W2 meter and accessories
- Updated Mounting Bracket Anchoring Details to include brick, updated concrete and
masonry section
|
1.6 |
2021-06-27 |
|
1.7 |
2021-12-14 |
- Added note to ensure sufficient working space around wiring
compartment
- Updated Powerwall Operating Temperature Range to reflect that installing Powerwall outside of
direct sunlight is a recommendation but not a requirement
|
1.8 |
2022-01-13 |
Added Appendix H: Installing the Cold Weather Kit |
1.9 |
2022-07-11 |
|
1.10 |
2023-01-04 |
|
1.11 |
2023-03-03 |
|
1.12 |
2023-04-21 |
|
1.13 |
2023-06-22 |
|
1.14 |
2023-10-12 |
- Corrected minimum communication cable requirement and added
specifications for custom communication cable to Required Supplies (minimum 600V due to NEC requirement for the
value to be equal to or greater than power conductors that may
be in the same enclosure or conduit)
|