Install Tesla 100 A CTs

Warning IconA warning icon, calling your attention to a possibly risky situation
Warning
Before installing, disconnecting, and/or adjusting CTs, ensure the circuits being measured are not energized and the system is completely powered down. Failure to de-energize the system may compromise operator and equipment safety.
  1. Plug the Tesla 100 A CT into the terminal in the Backup Gateway. Ensure the connector is fully seated in the terminal.
  2. Clamp the CT around the conductor to be measured.

    Figure 1. Embedded Site CTs and Solar CT Connectors

Tips

  • When metering split-phase 240 V solar inverters, a single CT on L1 or L2 can be used to meter solar production.
  • The CT1 and CT2 terminals have voltage references to L1 and L2 respectively and cannot be reconfigured. The CT3 terminal has a default voltage reference to L1 but can be configured as L2 during device setup.
  • Ensure CTs are facing the proper direction as indicated on the label. A CT will show negative current if installed backwards.
  • When upgrading a Gateway 1 system, the existing Remote (Neurio) Energy Meter(s) may be left in place and re-paired with the new Gateway. The Remote Meter must be power cycled within one minute prior to re-pairing. If metering Site power with the Remote Meter, ensure the Backup Gateway 2 internal site meter is de-selected during device setup.