STEP 9: Install Energy Metering for the System

Visibility on power and energy data is needed for the Powerwall 3 system to operate properly. An energy meter accomplishes this by measuring voltage (by voltage tap) and current (by Current Transformer, CT) at certain points in the system.

There are many possible configurations for installing metering depending on system design. However, there are two goals:

  • Metering the Site – Site meters show the overall power flow to/from a site from the Grid’s perspective. Thus, Site meter(s) must be installed upstream of all solar production, Powerwalls, and loads.
  • Metering Solar – Solar meters capture production from PV inverter(s). There must not be any loads or Powerwalls behind the Solar CTs. This would result in under- or over-estimation of solar production. In this system, Powerwall 3 performs its own Solar metering. Standalone (AC-coupled) solar inverters must be metered by Backup Gateway 2 Meter Y.

Site Metering for Backup Gateway 2

Backup Gateway 2 makes metering simple with built-in options for Site metering:

  • Internal Primary Meter (Meter X) – This Site meter may be used when the Grid connection is at the Supply terminals. No additional steps are needed during install.
  • Internal Auxiliary Meter (Meter Y) – If there are any loads or solar upstream of the Supply terminals, or if the system includes standalone (AC-coupled) solar, Tesla 100 A CTs connected to the Internal Auxiliary Meter can be used to measure loads / solar less than 100 A. One Tesla 100 A CT is included in the Accessory Kit, and additional CTs (Tesla P/N 1467316-00-x) may be ordered individually.

The Tesla 100 A CTs may be extended a max distance of 330 ft (100 m) by splicing twisted pair or using the Tesla 100A CT Extension (10 ft/3 m) (Tesla P/N 1467274-00-x). Use minimum 600V 20 AWG (0.5 mm2) conductors or larger to extend CTs up to 330 ft (100 m). Voltage rating of the extension wire must be equal to or greater than all other adjacent circuits.

Solar Metering for Standalone Solar

Solar must be monitored using Backup Gateway Meter Y and Tesla 100 A CTs. The CT is connected to the Backup Gateway Internal Auxiliary Meter (Meter Y). Meter Y has three (3) CT ports, and one Tesla 100 A CT is included in the Backup Gateway accessory kit. Additional Tesla 100 A CTs (Tesla P/N 1467316-00-x) may be ordered individually. See Install Tesla 100 A CTs for instructions.

Informational PurposesAn informational icon, calling your attention
Note
A single CT can be installed to measure a split-phase solar inverter, as total power output is calculated by software. If installing a single CT to measure Solar, toggle 1CTx2 ON during system setup. Using a single CT and not configuring it as 1CTx2 will prevent the system from measuring Solar correctly. See the Tesla One Device Setup Instructions for additional instructions on configuring CTs.