Required Tools and Supplies

Accessory Bag (Tesla P/N 1857363-00-x)

  • (6) M6 fasteners for front cover (Tesla P/N 1847553-00-A)
  • (6) MPPT jumpers
  • (2) cable tie mounts with (2) cable ties for grouping conductors
  • (1) small clamp-on ferrite core for low voltage harness
  • Powerwall 3 P/N 1707000-00-H and lower: (2) large clamp-on ferrite cores with (2) cable ties for the AC and PV conductors
  • Powerwall 3 P/N 1707000-00-J and higher: (1) metal PV shield

Required Tools

  • Powerwall dolly (Tesla P/N 1856187-xx-y)
  • MC cable cutter (Tesla P/N 1879720-xx-y)
    • Required when using PVC-MC cable
  • ¾" (19 mm) drill socket
  • Up to 3/32” (3 mm) electronics tip screwdriver
  • Up to 3/16” (4.5 mm) electronics tip screwdriver
  • Torx T20 bit

Required Supplies

  • (1X) if floor-mounting using single fastener
  • (4X) if using wall bracket
  • Metal conduit only
  • Pre-made Ethernet cables
  • Minimum NEMA 4 (IPX5) conduit hubs
    Figure 1. RMC Myers Hub
    Figure 2. Bridgeport Connector
Table 1. Approved Conduit Hubs
Approved Conduit Minimum NEMA 4 (IPX5) Fittings
PVC-MC Cable ¾” PVC-MC Connector
1” PVC-MC Connector
EMT ¾” Bridgeport 251-RT2 Connector
1” Bridgeport 252-RTI2 Connector
RMC ¾” RMC Myers Hub with RMC conduit
1” RMC Myers Hub with RMC conduit
¾” RMC Sealing Locknut with RMC conduit
1” RMC Sealing Locknut with RMC conduit
1-¼” RMC Sealing Locknut with RMC conduit