STEP 3: Wall-Mount Powerwall 3 Using Wall Bracket
-
Using a drill and level, mount
the Powerwall bracket to a wall capable of supporting the full weight of Powerwall 3. See Anchoring Details for Ground- or Wall-mounting Powerwall 3 with Wall Bracket on Existing Approved Foundation for additional details on the type and number
of fasteners to use.
WarningOnly install fasteners in the (4) slots on the horizontal bracket segments. Do not install fasteners on the vertical (center) segment, as these are not structural mounting holes.NoteThe following diagram provides measurements for positioning rear conduit entry holes relative to the Powerwall 3 bracket (the measurements are the same for both knockouts).
-
Move the dolly toward the wall, positioning Powerwall so that the mounting
cleats are just above the flanges on the bracket.
-
Lower Powerwall until both the
upper and lower sets of cleats engage the flanges on the bracket.
CAUTIONConfirm Powerwall 3 is fully seated on all four cleats before proceeding.
-
If ground-mounting Powerwall,
use an
11/16-inch (or 17 mm) wrench to adjust the leveling feet until
Powerwall is level. The unit should be level within ± 2 degrees side-to-side and
within ± 5 degrees front-to-back.
NoteThe top of each foot must be visible above the threaded boss; do not unscrew the foot so far that the top is no longer visible.