Release Notes October-December 2022

Archived Release Notes:

Week Ending December 24, 2022

The following new procedure(s) were added:
  1. Badge - Rear - LH (Remove and Replace) (China)
The following procedure(s) were updated:
  1. Camera - Occupant (Remove and Replace) - Added DAS reset steps.
  2. Controller - High Voltage (Non-Structural Pack) (Remove and Replace) - Updated and restructured procedure to accommodate connector X484.
  3. Controller - High Voltage (Structural Pack) (Remove and Replace)- Updated and restructured procedure to accommodate connector X484.
  4. Harness - Subframe - Rear (Remove and Replace) - Reorganized the procedure.
  5. Pyrotechnic Battery Disconnect (Remove and Replace) - Updated connector X484 image.
  6. Pyrotechnic Battery Disconnect (Structural Pack) (Remove and Replace) - Added steps for the circumstance of premature activation of the pyrotechnic battery disconnect.
  7. Support Hinge - Controller - High Voltage (Remove and Replace) - Clean up the procredures
  8. Switch - Interior Door Release - Front - LH (Remove and Replace) - Change correction code from 11403002 to 15131602, and update title to Switch - Interior Door Release - Front - LH
  9. Seat Assembly - 2nd Row - RH (7-Seat) (Remove and Replace) - Added in-step video tip for removing trim.

Week Ending December 17, 2022

The following procedure(s) were updated:
  1. Brake Lines - 2 Tube Bundle - Rear (Remove and Replace) - Added the removal and installment for the RH wheel
  2. Hinge - Door - Front - Upper - LH (Remove and Replace) - Updated the torques.

Week Ending December 10, 2022

The following procedure(s) were updated:
  1. Blower Motor - HVAC (Remove and Replace) - Updated references.
  2. Glass - Door - LH - Rear (Adjust) - Update correction code number from 11500400 to 11500300
  3. Seat Assembly - 1st Row - LH (Remove and Replace) - Removed reference to driver and passenger.
  4. Steering Column (LHD) (Remove and Replace) - Added gateway configuration parameter
  5. Recliner Actuator - Seat Back - 2nd Row - LH (Remove and Replace) - Updated to show removal of actuator without having to remove the actuator pan

Week Ending December 3, 2022

The following procedure(s) were updated:
  1. Busbar - Auxiliary Fuse - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  2. Busbar - Inlet - Negative - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  3. Busbar - Inlet - Positive - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  4. Busbar - Outlet - Negative - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  5. Busbar - Outlet - Positive - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  6. Fuse - Heat Pump - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  7. Harness - AC Filter - HV Battery (Non-Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  8. Harness - AC Filter - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  9. Seat Back - 2nd Row - LH (Remove and Replace) - Added steps for transferring various components from old to new seat.
  10. Sensor - Parking Distance - Inner - Front (Remove and Replace) - Updated/added Toolbox instructions for installation.
  11. Sensor - Parking Distance - Outer - Front (Remove and Replace) - Updated/added Toolbox instructions for installation.
  12. Shunt - HV Battery (Structural Pack) (Remove and Replace) - Updated resistance measurement instructions.
  13. Switch - Pack Contactors - Ancillary Bay - HV Battery (Remove and Replace) - Updated resistance measurement instructions.
  14. Window Regulator - Front - LH (Remove and Replace) - Updated title and correction code

Week Ending November 26, 2022

The following procedure(s) were updated:
  1. Pyrotechnic Battery Disconnect (Remove and Replace) - Added steps to disconnect/connect X484.
  2. Pyrotechnic Battery Disconnect (Structural Pack) (Remove and Install) - Added steps to disconnect/connect X484.
  3. Assembly - Filter - HEPA (Remove and Replace) - Updated HEPA filter assembly bolt torque.

Week Ending November 19, 2022

The following procedure(s) were updated:
  1. Control Arm - Upper - Front - LH (Non-Structural Pack) (Remove and Replace) - Updated installation procedure.
  2. Cooling System (Check and Fill) - Updated procedure decribes coolant top off without system air purge.
  3. Cooling System (Partial Refill and Bleed) - Updated procedure title. This procedure describes coolant top off and system air purge.
  4. Desiccant (Remove and Replace) - Updated plier names.

Week Ending November 12, 2022

The following procedure(s) were updated:
  1. Charge Port Voltage Check - Added procedures for three-phase connectors.
  2. HV Battery Contactor Seize Check - Removed confusing caution to not measure resistance.
  3. Tire Rotation - Provided instructions for resetting the tire estimates using the UI on the touchscreen. Note that Firmware version 2022.40 or newer is required.
  4. Windshield (Reuse Humidity and Temperature Sensor) (HW3) (Remove and Replace) - Added a Caution and image to show two locations to be extra cautious when cutting urethane.
  5. Sensor - Radar - Front (Remove and Replace) - Updated procedure to perform alignment check only drifting/pulling noticed during the test drive.
  6. Sensor - Radar - Front (Calibration) - Updated procedure to perform alignment check only drifting/pulling noticed during the test drive.

Week Ending November 5, 2022

The following procedure(s) were updated:
  1. Glass - Backlight (Remove and Replace) - Added steps to re-enable the rear defroster, if there were rear defroster alerts.
  2. HV Battery (AWD) (Non-Structural Pack) (Remove and Replace) - Added step to transfer HV header and coolant port caps from new HV battery to old HV battery.
  3. HV Battery (AWD) (Structural Pack) (Remove and Replace) - Added step to transfer HV header and coolant port caps from new HV battery to old HV battery.
  4. HV Battery (RWD) (Remove and Replace) - Added step to transfer HV header and coolant port caps from new HV battery to old HV battery.
  5. Deleted the PTC HV electrical connector to the following procedures:

Week Ending October 29, 2022

The following procedure(s) were updated:
  1. Busbar - Auxiliary Fuse - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  2. Busbar - Inlet - Negative - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  3. Busbar - Inlet - Positive - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  4. Busbar - Outlet - Negative - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  5. Busbar - Outlet - Positive - Fast Charge - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  6. Check Valve - Liquid Cooled Condenser (Remove and Replace) - Re-edit the procedure, and add a new HVAC routine.
  7. Contactor - Negative - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  8. Contactor - Positive - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  9. Controller - High Voltage (Non-Structural Pack) (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  10. Controller - High Voltage (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  11. Cover - Ancillary Bay (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  12. Cover - Pyrotechnic - HV Battery (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  13. DC Input Assembly - HV Battery (Busbar Type) (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  14. Fluid Coupling (Straight) - Rear Drive Unit (Remove and Replace) - Streamlined steps.
  15. Fluid Coupling (Straight) - Front Drive Unit (Remove and Replace) - Added steps for subframe removal.
  16. Fluid Coupling (90 Degrees) - Front Drive Unit (Remove and Replace) - Added steps for subframe removal.
  17. Fuse - Heat Pump - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  18. Harness - AC Filter - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  19. Harness - Ancillary Bay - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  20. Tube - Output - Coolant - Power Conversion System (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  21. Tube - Input - Coolant - Power Conversion System (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  22. HV Harness - Heat Pump - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  23. Insert - Subframe - Rear (Remove and Replace) - Added steps to repair threaded insert.
  24. Module - Restraint Control (Non-Structural Pack) (Remove and Replace) - Added step to disconnect 12V/LV power before disconnecting RCM connectors.
  25. Power Conversion System (Non-Structural Pack) (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  26. Power Conversion System (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  27. Shear Plate - Rear Subframe - Front - LH (Remove and Replace)- Added the step to use an underhood stand to support the rear subframe.
  28. Shunt - HV Battery (Structural Pack) (Remove and Replace) - Added cross references to new pyrotechnic battery disconnect procedure with voltage check.
  29. Supermanifold (Remove and Replace) - Removed steps for HVAC settings.
  30. Support Hinge - Controller - High Voltage (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  31. Switch - Pack Contactors - Ancillary Bay - HV Battery (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  32. Tube - Input - Coolant - Power Conversion System (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.
  33. Tube - Output - Coolant - Power Conversion System (Remove and Replace) - Added/updated cross references to pyrotechnic battery disconnect procedure with voltage check.

Week Ending October 22, 2022

The following procedure(s) were updated:
  1. Pyrotechnic Battery Disconnect (Remove and Replace) - Added steps to balance the voltage across the pyrotechnic battery disconnect mount points.
  2. Pyrotechnic Battery Disconnect (Structural Pack) (Remove and Replace) - Added steps to balance the voltage across the pyrotechnic battery disconnect mount points.
  3. Seatbelt - 2nd Row - Center (5 Seat) (Remove and Replace) - Added installation sequence.
  4. Steering Column (LHD) (Remove and Replace) - Added step to fully lower and extend the steering column before removal.
  5. Taillight - LH (Remove and Replace) - Added caution for water ingress and steps to perform a reset of VCLEFT or VCRIGHT as appropriate.
  6. Vehicle Sanitation - Tunap (Basic Package) (EMEA) - Updated procedure to use Tunap I5880 instead of Tunap I880.
  7. Vehicle Sanitation - Tunap (Complete Package) (EMEA) - Updated procedure to use Tunap I5880 instead of Tunap I880.
  8. Added overview video to the following procedures:

Week Ending October 15, 2022

The following procedure(s) were updated:
  1. Fluid Coupling (55 Degrees) - Rear Drive Unit (Remove and Replace) - Updated procedure to perform air purge through MCU, commonized topic for M3 and MY.
  2. Link - Aft - Lower - Rear - LH (Remove and Replace) - Updated to latest GSD validation.
  3. Power Conversion System (Non-Structural Pack) (Remove and Replace) - Updated procedure to latest 30N30 validation.
  4. Subframe Assembly - Rear (3DU) (Remove and Install) - Updated procedure and FRT to latest GSD validation.
  5. Wiper Module (Remove and Replace) - Step added that VCLeft learn procedure must be carried out if different make/brand wiper module than originally installed is fitted.

Week Ending October 8, 2022

The following procedure(s) were updated:
  1. Controller - High Voltage (Non-Structural Pack) (Remove and Replace) - Streamlined topic and added links to new backup and restore procedures.
  2. Controller - High Voltage (Structural Pack) (Remove and Replace) - Added links to new backup and restore procedures.
  3. Deadfronts - Pin - Charge Port (NA) (Damaged) (Remove and Replace) - Added steps to put on PPE.
  4. Deadfronts - Pin - Charge Port (NA) (Undamaged) (Remove and Replace) - Added steps to put on PPE.
  5. Front Door Alignment - Referral to Hinge - Door - Front - Lower - LH (Structural Pack) (Rework) for Structural Pack vehicles.
  6. Remove Stuck Deadfront - Charge Handle - Added first step to de-energize the Wall Connector or UMC, and step to put on PPE.
  7. Windshield (Reuse Humidity and Temperature Sensor) (HW3) (Remove and Replace) - Added instructions to cut dash pad foam.