Release Notes January-March 2024

Archived Release Notes:

Week Ending March 30, 2024

The following new procedure(s) were added:
  1. Harness - Fascia - Front (Remove and Replace)
The following procedure(s) were updated:
  1. BMS PCBA - High Voltage Battery Assembly (HV Battery 2.0) (Remove & Replace) - Updated note regarding required software versions and made procedure Model X applicable.
  2. Fluids - Updated DOT 4 BASF Hydraulan 404 as the approved brake fluid.
  3. Module - Steering Column Control (Remove and Replace) - Removed ODIN routines from procedure as per latest validation.
  4. Mount - Clevis - Front Drive Unit - LH (Remove and Replace) - Updated procedure to latest validation: no need to remove/install the HV battery.
  5. Ride Height - Adjust - Added links to the suspension bolt height (ride height) specifications.

Week Ending March 23, 2024

The following procedure(s) were updated:
  1. Brake Pad Kit - Front (Remove and Replace) - Added an image of lubricating the caliper pad slides.
  2. Fluids - Added compressor oil density note and leak detection kit info.
  3. Handle Carrier - Exterior Release - Door - Rear - LH (Remove and Replace) - Updated the removal steps based on the latest validation.
  4. Headlights (Adjust), Europe (ECE) - Modified settings for headlight aiming equipment.
  5. Seal - Primary - Front Door - LH (Remove and Replace) - Added an image to indicate the seal junction to aid seal installation.

Week Ending March 16, 2024

The following procedure(s) were updated:
  1. Camera - Triple - Forward Facing (Remove and Replace) - Added step to remove screws that attach the upper cover to the glare shield.
  2. Link - Aft - Lower - LH (Remove and Replace) - Added a warning to remind technicians to inspect and test the cutting tool to avoid personal injury.
  3. Links - Aft - Lower - LH/RH (Remove and Replace) - Added a warning to remind technicians to inspect and test the cutting tool to avoid personal injury.
  4. Links - Front Suspension - Lower - Fore and Aft - LH/RH (Remove & Replace) - Added a warning to remind technicians to inspect and test the cutting tool to avoid personal injury.

Week Ending March 9, 2024

The following new procedure(s) were added:
  1. Replacement Tire Information
The following procedure(s) were updated:
  1. Brake Caliper - Front - LH (Remove and Replace) - Replaced copper paste with Silaramic.
  2. Brake Caliper Pad Slides and Parking Brake Calipers - Cleaning and Lubrication - Replaced copper paste with Silaramic.
  3. Brake Caliper - Rear - Brembo - LH (Remove and Replace) - Replaced copper paste with Silaramic.
  4. Brake Pads - Front - Set (Remove and Replace) - Replaced copper paste with Silaramic.
  5. Control Arm - Upper - Front - LH (Remove and Replace) - Added steps of setting aside the frunk fuse box and images of the frunk fuse box bracket bolts.
  6. Fluids - Added 1646886-02-A KAF 1 gearbox fluid.
  7. HV Battery Air Leak Test - Updated name to HV Battery Air Leak Test.
  8. Inverter - Front Drive Unit (Remove & Replace) - Fixed images and link to Alignment Requirements.
  9. Raise Vehicle - Floor Jack (Mobile Service) - Added a warning to stay away from the vehicle before lifting to avoid injury.

Week Ending March 2, 2024

Week Ending February 24, 2024

The following procedure(s) were updated:
  1. Harness - Subframe - Rear (Remove and Replace) - Updated references to procedures.
  2. Mount - Front Drive Unit - RH (Remove and Replace) - Added torque information for the 4 middle bolts that attach the RH drive unit mount to the body.

Week Ending February 17, 2024

The following new procedure(s) were added:
  1. Fuse Box - Underhood (Rework)
The following procedure(s) were updated:
  1. Fuse Box - Underhood (Remove and Replace) - Added reference to rework of fuse box, if needed.

Week Ending February 3, 2024

The following procedure(s) were updated:
  1. Clean and Lubricate Brake Calipers (Integrated Parking Brake) - Replaced Transport/Tow Mode steps with EPB Service Mode steps.
  2. Clean and Lubricate Brake Calipers (Separate Parking Brake) - Replaced Transport/Tow Mode steps with EPB Service Mode steps.
  3. Liftgate Assembly (Remove and Replace) - Updated and rearranged images.

Week Ending January 27, 2024

The following procedure(s) were updated:
  1. 40A Fuse - Front Junction Box (Remove and Replace) - Added fuse diagram.
  2. Cover - Pyrotechnic Fuse - HV Battery 1.0/1.5 (Remove and Replace) - Added Tesla-approved sealants to steps.
  3. Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Install) - Added Tesla-approved sealants to steps.
  4. Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Replace) - Added Tesla-approved sealants to steps.

Week Ending January 20, 2024

The following procedure(s) were updated:
  1. Drive Unit - Front (1st Generation) (Remove and Replace) - Added a note to install a new motor ID label in hood/trunk for China, Japan and Korea.
  2. Drive Unit - Front (2nd Generation) (Remove and Replace) - Added a note to install a new motor ID label in hood/trunk for China, Japan and Korea.
  3. Drive Unit - Rear - Small (Remove and Replace) - Added a note to install a new motor ID label in hood/trunk for China, Japan and Korea.
  4. Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Install) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.
  5. Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Replace) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.
  6. Fuse - Pyrotechnic - HV Battery 2.0 (Remove and Install) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.
  7. Fuse - Pyrotechnic - HV Battery 2.0 (Remove and Replace) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.

Week Ending January 13, 2024

The following new procedure(s) were added:
  1. Sensor - Coolant Level - Cooling System (Remove and Replace)
The following procedure(s) were updated:
  1. Fluids - Added part numbers of refrigerant and coolant for China only.

Week Ending January 6, 2024

None this week.