Release Notes January-March 2024
Archived Release Notes:
- June-September 2022: Release Notes June-September 2022
- October-December 2022: Release Notes October-December 2022
- January-March 2023: Release Notes January-March 2023
- April-June 2023: Release Notes April-June 2023
- July-September 2023: Release Notes July-September 2023
- October-December 2023: Release Notes October-December 2023
- January-March 2024: Release Notes January-March 2024
- April-June 2024: Release Notes April-June 2024
- July-September 2024: Release Notes July-September 2024
Week Ending March 30, 2024
The following new procedure(s) were added:
The following procedure(s) were updated:
- BMS PCBA - High Voltage Battery Assembly (HV Battery 1.0/1.5) (Remove & Replace) - Updated note regarding required software versions.
- BMS PCBA - High Voltage Battery Assembly (HV Battery 2.0) (Remove & Replace) - Updated note regarding required software versions and made procedure Model X applicable.
- Fluids - Updated DOT 4 BASF Hydraulan 404 as the approved brake fluid.
- Module - Steering Column Control (Remove and Replace) - Removed ODIN routines from procedure as per latest validation.
- Ride Height - Adjust - Added links to the suspension bolt height (ride height) specifications.
Week Ending March 23, 2024
The following new procedure(s) were added:
The following procedure(s) were updated:
- Brake Pad Kit - Front (Remove and Replace) - Added an image of lubricating the caliper pad slides.
- Fluids - Added compressor oil density note and leak detection kit info.
- Headlights (Adjust), Europe (ECE) - Modified settings for headlight aiming equipment.
Week Ending March 16, 2024
The following new procedure(s) were added:
The following procedure(s) were updated:
- Link - Aft - Lower - LH (Remove and Replace) - Added a warning to remind technicians to inspect and test the cutting tool to avoid personal injury.
- Links - Aft - Lower - LH/RH (Remove and Replace) - Added a warning to remind technicians to inspect and test the cutting tool to avoid personal injury.
- Links - Front Suspension - Lower - Fore and Aft - LH/RH (Remove & Replace) - Added a warning to remind technicians to inspect and test the cutting tool to avoid personal injury.
Week Ending March 9, 2024
The following new procedure(s) were added:
The following procedure(s) were updated:
- Brake Caliper - Front - LH (Remove and Replace) - Replaced copper paste with Silaramic.
- Brake Caliper Pad Slides and Parking Brake Calipers - Cleaning and Lubrication - Replaced copper paste with Silaramic.
- Brake Caliper - Rear - Brembo - LH (Remove and Replace) - Replaced copper paste with Silaramic.
- Fluids - Added 1646886-02-A KAF 1 gearbox fluid.
- Handle - Exterior Release - Door - Rear - LH - Generation 3.0 (Retrofit) - Updated topic to latest procedure validation.
- HV Battery (RWD/AWD) (Remove and Install) - Added steps of removing and installing vent covers for the vehicles equipped with the covers.
- HV Battery Air Leak Test - Updated name to HV Battery Air Leak Test.
- Raise Vehicle - Floor Jack (Mobile Service) - Added a warning to stay away from the vehicle before lifting to avoid injury.
- Stabilizer Bar - Front (Dual Motor) (Remove and Replace) - Update the procedure to match with the latest validation.
Week Ending March 2, 2024
The following procedure(s) were updated:
- Updated the gearbox fluid for the following topics:
- Mount - Clevis - Front Drive Unit - LH (Remove and Replace) - Updated procedure to latest validation: no need to remove/install the HV battery.
Week Ending February 24, 2024
The following procedure(s) were updated:
- BMS PCBA - High Voltage Battery Assembly (HV Battery 1.0/1.5) (Remove & Replace) - Added part number 1108645-00-A for EMEA Torx Bit T20 Ball End.
- HV Battery (RWD/AWD) (Remove and Replace) - Fixed reference error.
Week Ending February 17, 2024
The following new procedure(s) were added:
Week Ending February 3, 2024
The following procedure(s) were updated:
- Clean and Lubricate Brake Calipers (Integrated Parking Brake) - Replaced Transport/Tow Mode steps with EPB Service Mode steps.
- Clean and Lubricate Brake Calipers (Separate Parking Brake) - Replaced Transport/Tow Mode steps with EPB Service Mode steps.
Week Ending January 27, 2024
The following new procedure(s) were added:
The following procedure(s) were updated:
- 40 Amp Fuse - Forward Junction Box - 2nd Generation (Dual Motor) (Remove and Replace) - Added fuse diagram.
- Cover - Pyrotechnic Fuse - HV Battery 1.0/1.5 (Remove and Replace) - Added Tesla-approved sealants to steps.
- Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Install) - Added Tesla-approved sealants to steps.
- Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Replace) - Added Tesla-approved sealants to steps.
Week Ending January 20, 2024
The following new procedure(s) were added:
The following procedure(s) were updated:
- Drive Unit - Front (1st Generation) (Remove and Replace) - Added a note to install a new motor ID label in hood/trunk for China, Japan and Korea.
- Drive Unit - Front (1st Generation) (Remove and Replace) - Added a note to install a new motor ID label in hood/trunk for China, Japan and Korea.
- Drive Unit - Rear - Small (Remove and Replace) - Added a note to install a new motor ID label in hood/trunk for China, Japan and Korea.
- Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Install) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.
- Fuse - Pyrotechnic - HV Battery 1.0/1.5 (Remove and Replace) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.
- Fuse - Pyrotechnic - HV Battery 2.0 (Remove and Install) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.
- Fuse - Pyrotechnic - HV Battery 2.0 (Remove and Replace) - Updated Warning to permit performing this procedure by technicians in EMEA that have completed the training course HV Battery Fuse Remove and Replace ILT - EMEA.
Week Ending January 13, 2024
The following new procedure(s) were added:
The following procedure(s) were updated:
- Air Spring Module - Rear - LH (Remove and Replace) - Removed steps about the mid aero shield panel and the rear parking brake, and added steps about the air spring harness bracket.
- Fluids - Added part numbers of refrigerant and coolant for China only.
Week Ending January 6, 2024
None this week.