Release Notes April-June 2024

Archived Release Notes:

Week Ending June 29, 2024

The following procedure(s) were updated:
  1. Drive Unit - Front (Remove and Install) - Added special tool list to procedure.
  2. Drive Unit - Front (Remove and Replace) - Added special tool list to procedure.

Week Ending June 22, 2024

The following new procedure(s) were added:
  1. Brake Rotor - Front - LH (Measure Runout)

Week Ending June 15, 2024

The following procedure(s) were updated:
  1. Clear Forward Camera View (Precision Cleaning Of Inboard Windshield) - Updated the inspection method and diagrams and added the tool list.
  2. Headlights - Adjust (Global) (Tool Method) - Updated procedure to latest validation.
  3. TESLA Letter Badge (Install) - Added the jig tool number.
  4. Vehicle HV Disablement Procedure - Added steps to set suspension height and activate Jack Mode before step that instructs to disconnect LV.

Week Ending June 8, 2024

The following procedure(s) were updated:
  1. Brake Caliper - Rear - LH (Remove and Replace) - Updated EPB Service Mode reference.
  2. Brake Pads - Rear (Remove and Replace) - Updated EPB Service Mode reference.
  3. Brake Pads and Rotors - Rear - Set (Remove and Replace) - Updated EPB Service Mode reference.
  4. Brake Rotors - Rear - Set (Remove and Replace) - Updated EPB Service Mode reference.
  5. Firmware Update - Mobile Connector - Added steps to update Mobile Connector firmware on vehicles operating software version 2024.14+.
  6. Halfshaft - Rear Drive Unit - LH (Plaid) (Remove and Replace) - Updated EPB Service Mode reference.
  7. Halfshaft - Rear Drive Unit - LH (Remove and Replace) - Updated EPB Service Mode reference.
  8. Park Brake Caliper - Release - Added procedure using Service Mode.
  9. Seal - Axle - Rear Drive Unit - LH (Plaid) (Remove and Replace) - Updated EPB Service Mode reference.
  10. Seal - Axle - Rear Drive Unit - LH (Remove and Replace) - Updated EPB Service Mode reference.
  11. Vehicle HV Disablement Procedure - Added warning to measure the specified order of locations for high voltage.
  12. Window Regulator (Recalibrate) - Updated calibration steps using the touchscreen.

Week Ending June 1, 2024

The following procedure(s) were updated:
  1. Raise Vehicle - 2 Post Lift - Added EMEA specific info on offsetting lift pads to provide additional clearance for HV battery removal.

Week Ending May 25, 2024

The following procedure(s) were updated:
  1. Updated all "Vehicle Electrical Isolation Procedure" references to "Vehicle HV Disablement Procedure".

Week Ending May 18, 2024

The following new procedure(s) were added:
  1. EPAS Grounding Points - Front Rails (Restore)
The following procedure(s) were updated:
  1. Desiccant (Remove and Replace) - Updated accumulator cap removal step so that the cap is removed with a slide hammer and female-to-female threaded adapter.
  2. Module - Restraint Control (Remove and Replace) - Replaced Toolbox 3 routines by routines using the touchscreen.
  3. Service Mode Plus - Added Service Mode Plus activation using the Vehicle Ops App.
  4. Subframe Assembly - Rear (Remove and Install) - Added subframe jig PN.

Week Ending May 11, 2024

The following procedure(s) were updated:
  1. Bracket - License Plate - Front (Rework) - Added the license plate removal and installation steps.
  2. Sensor - Radar - Front (Calibration) - Added extra info that procedure is not required if no radar is present.

Week Ending May 4, 2024

The following new procedure(s) were added:
  1. Tire - Front - LH (Repair)
The following procedure(s) were updated:
  1. Tire Rotation - Updated instructions on how to reset tire rotation through the vehicle touchscreen, and removed the Toolbox 3 method.

Week Ending April 27, 2024

The following procedure(s) were updated:
  1. Fluids - Updated BASF Hydraulan 406 ESI brake fluid with DOT 5.1.
  2. Vehicle HV Disablement Procedure - Updated the order of measuring the voltage at each terminal to ground first before measuring the voltage at both terminals.

Week Ending April 13, 2024

The following procedure(s) were updated:
  1. Battery - LV (Remove and Replace) - Added a Note to perform the recovery of the LV battery per Toolbox article prior to its replacement.
  2. Desiccant (Remove and Replace) - Added reminding of wearing PPEs.
  3. Fluid Capacities - Removed gearbox fluid types.
  4. Gearbox Fluid - Front Drive Unit (Drain and Refill) - Updated gearbox fluid information with link.
  5. Gearbox Fluid - Rear Drive Unit (Plaid) (Drain and Refill) - Updated gearbox fluid information with link.
  6. Inverter - Front Drive Unit (Remove and Replace) - Updated gearbox fluid information with link.
  7. Windshield (Remove and Install) - Added a step of cleaning the windshield, especially the forward-facing camera area, to ensure a clear view of the forward-facing camera.

Week Ending April 6, 2024

The following procedure(s) were updated:
  1. Desiccant (Remove and Replace) - Added reminding of checking the pressure of A/C system before opening the accumulator.
  2. Door Assembly - Charge Port (Global) (Remove and Replace) - Added the installation step of the busbar to the charge port nuts.
  3. Fluids - Added new Gearbox Fluid section. - Updated washer fluid for North America.
  4. Headlights - Adjust (Global) (Wall Method) - Updated measurements and units.
  5. Headlights - Adjust - NA (Wall Method) - Updated measurements and units.